Well ID: 37-129-23283 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.391119,"lon":-79.381267,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: NED J. NAKLES (197A) 4 | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 1990-01-22 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.391119 | |
Longitude: -79.381267 |
Date | Event |
---|---|
1990-01-22 | New Permit Application |
1990-03-15 | Performed Spud Operation |
1990-04-03 | Drilling Completion |
1990-07-31 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2002 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2003 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2004 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | CASTLE GAS CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | PETRO DEV CORP | 3767.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PETRO DEV CORP | 2,911.00 | 365 | 13.00 | 365 | 0.00 | 0 |
2011 | PDC MOUNTAINEER LLC | 5,848.92 | 365 | 0.01 | 365 | 0.00 | 0 |
2012 | PDC MOUNTAINEER LLC | 2,662.72 | 365 | 0.01 | 366 | 0.00 | 0 |
2013 | PDC MOUNTAINEER LLC | 1,785.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | ALLIANCE PETRO CO LLC | 1,969.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ALLIANCE PETRO CO LLC | 1,753.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 1,126.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,656.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,447.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2003 | CASTLE GAS CO INC | Brine | 40.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2011 | PDC MOUNTAINEER LLC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0093149 |
2012 | PDC MOUNTAINEER LLC | Produced Fluid | 40.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid | 41.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2427459 | Primary Facility | 2015-11-16 | Routine/Complete Inspection | No Violations Noted | Access road gated and shared with ag field. At the time of inspection well appears equipped for production. Site permanently stabilized. No E&S issues in relation to site and/or access road. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally sound. |
2503725 | Primary Facility | 2016-07-20 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus was open. Well head casing-equipment-grounded 50 bbl plastic tank looked ok. |
2599260 | Primary Facility | 2017-05-31 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears to be structurally sound. No E&S issues. |
2789277 | Primary Facility | 2018-10-16 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection in response Operator report of a brine spill. Spill was discovered by Operator on 10/15 /2018 @ 15:30 and called into Department the same day at 17:05.
On 10/16/2018 WQS Santiapillai spoke with Operator (Eric Staul) who stated that the cause of the spill was a faulty discharge valve on the brine. Operator estimates 45gallons to have been released. Operator stated that the brine tank was pumped out and faulty valve replaced. Cleanup pending. At the time of inspection well appears equipped for production. No active leaks observed from brine tank discharge valve and valve appears to have been repaired. Area of impact from reported release appears to be localized and contained to well site. Cleanup has not commenced at the time of this inspection. Department requests Operator to perform cleanup in accordance with Spill Policy. Department requests Operator provide a written response detailing the cause of the spill, type and quantity of material released, impacted materials, and remedial actions |
2802391 | Primary Facility | 2018-11-14 | Administrative/File Review | No Violations Noted | Department received NOV Response from Operator dated 10/24/2018 on 11/1/2018. |
2834379 | Primary Facility | 2019-01-28 | Compliance Evaluation | No Violations Noted | Compliance Evaluation Inspection to inspection record #2789277 where a violation was issued for operator discharge of brine or other fluids on or into the ground.
At time of inspection well site snow-covered. An operator-reported release of brine occurred on 10-15-18. Area of release appears mulched. Hay bales installed on NW side of well site, down-gradient of release area (photo #1). No E and S issues observed. Department contacted operator rep Carla Henry by phone from site. Ms. Henry states the site was backfilled, seeded, and mulched on 12-11-18. Ms. Henry also states disposal manifests will be provided to the Department today. Department received disposal manifests at 10:07. Operator appears to be in compliance at this time. Violation issued on 10-16-18 has been corrected. |
752752 | Primary Facility | 1990-03-21 | Routine/Complete Inspection | No Violations Noted | E&S, PITS OK |
752848 | Primary Facility | 1990-03-20 | Drilling/Alteration | No Violations Noted | AT 2923'; E&S, PITS OK |
755832 | Primary Facility | 1991-02-27 | Site Restoration | No Violations Noted | SITE RESTORED; TANK |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2789277 | 830584 | 2018-10-16 | 2019-01-28 | 78.57(a) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
830584 | 368405 | NOV - Notice of Violation |
For data sources see[7]