{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.628056,"lon":-79.63175,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Allegheny Township | |
Operator Name: PATRIOT EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: MASTARONE | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2005-02-03 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.628056 | |
Longitude: -79.631750 |
Date | Event |
---|---|
2005-02-03 | New Permit Application |
2005-03-25 | Performed Spud Operation |
2005-03-31 | Drilling Completion |
2005-04-20 | Perforation |
2005-11-15 | NEWLY DRILLED |
2015-09-09 | Drilling Completion |
2016-06-07 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2005 | PATRIOT EXPLORATION CORP | 893 | 150 | 0.00 | 0 | 0.00 | 0 |
2006 | PATRIOT EXPLORATION CORP | 1506.00 | 373 | 0.00 | 0 | 0.00 | 0 |
2007 | PATRIOT EXPLORATION CORP | 594.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PATRIOT EXPLORATION CORP | 625.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2009 | PATRIOT EXPLORATION CORP | 717.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PATRIOT EXPLORATION CORP | 463.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PATRIOT EXPLORATION CORP | 383.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | PATRIOT EXPLORATION CORP | 538.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | PATRIOT EXPLORATION CORP | 393.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PATRIOT EXPLORATION CORP | 350.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PATRIOT EXPLORATION CORP | 383.00 | 251 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2005 | PATRIOT EXPLORATION CORP | Fracking Fluid | 800.00 Bbl | Municipal Sewage Treatment Plant | PA0026255 |
2014 | PATRIOT EXPLORATION CORP | Produced Fluid | 30.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2014 | PATRIOT EXPLORATION CORP | Produced Fluid | 30 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | PATRIOT EXPLORATION CORP | Produced Fluid | 300.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2015 | PATRIOT EXPLORATION CORP | Produced Fluid | 300 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1434563 | Primary Facility | 2005-03-29 | Drilling/Alteration | No Violations Noted | Well spudded 3/28/05 LK Drilling.Pit ok ,E&S ok |
1816963 | Primary Facility | 2009-07-30 | Routine/Complete Inspection | No Violations Noted | Well site appears to be in production. There is no evidence of accelerated erosion or sedimentation on the access road or the well site. The Brine Tank located on-site appears to be in sound condition. The operator should continue to monitor the site for erosion and sedimentation. |
2000195 | Primary Facility | 2011-08-30 | Complaint Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Observed no accelerated erosion or sedimentation in relation to the well-site or access road. It was noted that the access road to this well and the Mastarone Unit 2 required routine maintenance. |
2081751 | Primary Facility | 2012-06-02 | Complaint Inspection | No Violations Noted | The landowner also indicated he has previously stopped the Operator from accessing his driveway and access road, because the new driveway was built directly over the leach bed associated with this septic tank. At this time the Department recognizes that this is a civil matter. The rutted area observed needs to be fixed however without access the Operator must first come to an agreement with the landowner concerning access to perform the needed work. |
2097270 | Primary Facility | 2012-09-05 | Complaint Inspection | Violation(s) Noted | Follow up to an inspection performed on 6/2/2012. During the previous inspection the Department observed accelerate erosion on the access road, which still has not been addressed. The Department suggest the Operator regrade the access road and install approved BMP's to minimize accelerated erosion. |
2164025 | Primary Facility | 2012-09-19 | Compliance Evaluation | No Violations Noted | At the time of inspection the issues resulting in violations written on 9/5/2012 have been resolved. The Department notes that the Operator added clean durable rock to the access road and installed turnouts to convey runoff away from the access road. The Operator also regraded the rutted area at the access point. The Department notes that the Operator had to alter their access point to the lease property in order to fulfill the requirements of the violations. The Department would like to commend the Operator on their effort to resolve these issues. The Department suggests the Operator continue to monitor the site to ensure accelerated erosion and sedimentation is controlled and further issues at this site are avoided. |
2254101 | Primary Facility | 2014-03-11 | Complaint Inspection | No Violations Noted | Inspection in response to complaint #302937. Meeting on site with Biologist 3 Dan Counahan to review the Operators plan and permits to install a stream crossing. At the time of inspection the Operator had an Army Corp stream crossing permit and an Erosion and Sedimentation plan. Upon further inspection the Department found what appeared to be a wetland, and the area that the proposed road crossing will impact this probable wetland appears to be less than 1/10 of an acre in size. The Department suggests the Operator submit plans and obtain a GP 7, which is a Chapter 105 permit for a permanent road crossing of streams and wetlands from the Oil and Gas Office. If the proposed limit of disturbance is more than 5,000 square feet, but less than 5 acres, the E&S Plan should also be included with the 105 Permit for Department review and approval. If the LOD is over 5 acres, the applicant should submit an ESCGP-2 to the Department for a separate review and approval. Upon the approval of the GP 7 and the Corps’ Section 404 SPGP-4 Authorization, the Op |
2317067 | Primary Facility | 2014-10-22 | Routine/Complete Inspection | No Violations Noted | Well is piped for production and is properly identified. |
2331362 | Primary Facility | 2014-12-18 | Complaint Inspection | No Violations Noted | Joint investigation inspection in response to complaint. During the inspection the well apparatus and brine tank appeared to be in sound condition. No observation of distressed vegetation in relation to the well pad or surrounding area. No sheen observed in the pond or in Penn Run at the time of inspection. The Waste Program took conductivity readings at locations up and down stream of the pond and at the spill way of the pond. |
2408709 | Primary Facility | 2015-09-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Ran cement bond log and cut 4 1/2" casing at approximately 1500’ during time of inspection. Plan is to pull 4 1/2" casing and set remaining cement plug according to plugging procedure. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan. |
2415633 | Primary Facility | 2015-09-17 | Complaint Inspection | Violation(s) Noted | See hard copy for comments |
2427398 | Primary Facility | 2015-11-24 | Follow-up Inspection | No Violations Noted | see hard copy for comments. |
2435752 | Primary Facility | 2015-10-30 | Administrative/File Review | Outstanding Violations - No Viols Req'd | Administrative review of information requested by the Department (see inspection # 2415633) and subsequently submitted by the operator on 10/30/2015. |
2435782 | Primary Facility | 2015-11-18 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2488289 | Primary Facility | 2016-05-17 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up inspection to NOV issued on 10/16/2015.
At the time of inspection the Site ID sign was installed. The wetland delineation submitted on October 30, 2015 by the operator’s contractor was deficient. WQS Steingrabe requested a meeting with the Operator and wetland delineation contractor . The Department and Operator met onsite to review the current site conditions and discuss the previous delineation performed by the operator’s consultant. The Operator agreed to forward the results of the previous wetland delineation in a formal report within two weeks of the date of this inspection, but no later than June 1, 2016. During the inspection, no accelerated erosion or sedmintation related to the well site or access road was observed. The Department notes that the site appeared temporarily stabilized. Temporary BMP’s were in installed and appeared to be functioning properly. However The Department observed several areas within the limit of disturbance that do not currently exhibit 70% uniform ve |
2500078 | Primary Facility | 2016-06-09 | Compliance Evaluation | No Violations Noted | Complaince inspection performed on 5/17/2016.
At the time of inspection the Site ID sign was installed. The Operator submitted the wetland delineation on 6/6/2016. The wetland delineation is being reviewed by the Oil and Gas Technical Services Unit. During the inspection, no accelerated erosion or sedimentation related to the well site or access road was observed. The Department notes that the site appeared stabilized. Temporary BMP’s were removed with the exception of the silt fence near the stream crossing. On 5/17/2016, the department suggested the Operator leave the silt fence until the area exhibits 70% uniform vegetative coverage that is required for permanent stabilization and, final restoration. See attached photos. The Department suggested the Operator scarify, reseed and mulch areas that do not exhibit 70% uniform vegetative cover.
|
2500088 | Primary Facility | 2016-07-06 | Site Restoration | No Violations Noted | Follow up inspection to 06/09/2016.
The Department notes that the site appeared to be stabilized with 70% uniform vegetative coverage sufficient to prevent accelerated erosion and sedimentation. The Department suggests the Operator remove the silt fence BMP’s from the stream crossing area and reseed and mulch those areas in order to maintain vegetative coverage. All other BMP’s have been removed. The site is restored. The wetland delineation is currently under review the Oil and Gas Technical Services Unit.
|
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2097270 | 648297 | 09/05/2012 | 2012-09-05 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | |
2415633 | 736754 | 09/17/2015 | 2015-09-17 | OGA 3211(G) - Failure to post the well permit number and the operator's name, address and phone number at the well site during construction of the access road, site preparation and during drilling, operating or alteration of well. | Administrative | |
2415633 | 736755 | 09/17/2015 | 2015-09-17 | 102.4(b)8 - EROSION AND SEDIMENT CONTROL REQUIREMENTS – E & S plan, inspection reports and monitoring records were not available at the project site during all stages of earth disturbance activity. | Administrative | |
2415633 | 736756 | 09/17/2015 | 2015-09-17 | 102.4(b)5 - EROSION AND SEDIMENT CONTROL REQUIREMENTS – The E & S Plan, for earth disturbance activities not required to obtain a permit under 25 Pa. Code § 102.5(c), did not contain the required drawings and narrative. | Administrative | |
2415633 | 736757 | 09/17/2015 | 2015-09-17 | 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. | Environmental Health & Safety | |
2415633 | 736758 | 09/17/2015 | 2015-09-17 | 102.11(a)1 - GENERAL REQUIREMENTS – BMP AND DESIGN STANDARDS - Person failed to design, implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation to protect, maintain, reclaim and restore water quality an | Environmental Health & Safety | |
2415633 | 736759 | 09/17/2015 | 2015-09-17 | 105.11(a) - PERMIT REQUIREMENTS – Person failed to obtain a permit from the Department prior to construction, operation, maintenance, modification, enlargement or abandonment of a water obstruction or encroachment. | Environmental Health & Safety | |
2415633 | 736760 | 09/17/2015 | 2015-09-17 | 105.42(c) - TERMS AND CONDITIONS OF DEPARTMENT PERMITS AND APPROVALS - Permittee failed to make available a copy of the permit or other Department approval at the work site. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
648297 | 295179 | NOV - Notice of Violation | Comply/Closed | 2012-09-19 | |||
736754 | 330428 | NOV - Notice of Violation | |||||
736754 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |
736755 | 330428 | NOV - Notice of Violation | |||||
736755 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |
736756 | 330428 | NOV - Notice of Violation | |||||
736756 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |
736757 | 330428 | NOV - Notice of Violation | |||||
736757 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |
736758 | 330428 | NOV - Notice of Violation | |||||
736758 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |
736759 | 330428 | NOV - Notice of Violation | |||||
736759 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |
736760 | 330428 | NOV - Notice of Violation | |||||
736760 | 370376 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-12-13 | 2018-12-13 | $5,000.00 | $5,000.00 |