If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-26273 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.325274,"lon":-79.501277,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Hempfield Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: MCCUNE S&M 2 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2006-03-22 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.325274 | |
Longitude: -79.501277 |
Date | Event |
---|---|
2006-03-22 | New Permit Application |
2006-06-23 | Performed Spud Operation |
2006-07-06 | Drilling Completion |
2006-07-25 | Perforation |
2007-02-27 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | MID EAST OIL CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 80.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 74.00 | 153 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 358.00 | 154 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 55.00 | 153 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 5.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 16.00 | 30 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 121.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 115.00 | 30 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2006 | MID EAST OIL CO | Drilling | 1,520.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2006 | MID EAST OIL CO | Brine | 185.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2006 | MID EAST OIL CO | Fracking Fluid | 320.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 171.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2523051 | Primary Facility | 2016-09-28 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. |
2661234 | Primary Facility | 2017-11-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears structurally sound. No E&S issues. |
For data sources see[7]