If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27051 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.172689,"lon":-79.600642,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: East Huntingdon Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: LINGSCH 001 | |
License Status: | |
Spud Date: | |
Permit Date: 2007-08-15 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.172689 | |
Longitude: -79.600642 |
Date | Event |
---|---|
2007-08-15 | New Permit Application |
2008-08-11 | Permit Renewal Application |
2009-07-28 | Permit Renewal Application |
2009-08-27 | Performed Spud Operation |
2009-09-01 | Drilling Completion |
2009-09-08 | Perforation |
2011-12-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | KRIEBEL MINERALS INC | 2,589.00 | 61 | 0.00 | 0 | 0.00 | 0 |
2010 | KRIEBEL MINERALS INC | 15,385.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 13,266.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 10,079.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 9,113.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 7,873.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 2,999.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 4,730.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 4,983.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 3,906.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 3,628.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | KRIEBEL MINERALS INC | Drilling | 550.00 Bbl | Other | PA0091472 |
2009 | KRIEBEL MINERALS INC | Fracking Fluid | 1,210.00 Bbl | Other | PA0091472 |
2012 | KRIEBEL MINERALS INC | Produced Fluid | 35.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 8 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 8.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1642051 | Primary Facility | 2007-07-31 | Routine/Complete Inspection | No Violations Noted | WELL STAKED. E&S PLAN SHOULD PROTECT FM ADVERSE IMPACTS IF PROPERLY IMPLEMENTED AND MAINTAINED. |
1826714 | Primary Facility | 2009-08-28 | Drilling/Alteration | No Violations Noted | FALCON 8 IS RIGGED UP TO DRILL, HAMMER BIT TO THE DIRT, BUT NO CREW IS ON SITE. PITS ARE LINED AND FENCED E&S CONTROLS ARE IN PLACE BUT E&S PLAN IS NOT SITE SPECIFIC, AND HAS NO SITE MAP. |
1826721 | Primary Facility | 2009-08-31 | Drilling/Alteration | No Violations Noted | FALCON 8 DRILLING AHEAD, E&S PLAN IS NOW COMPLETE, EVERYTHING LOOKS GOOD |
1829555 | Primary Facility | 2009-09-10 | Drilling/Alteration | No Violations Noted | DRILLING IS COMPLETE, FRAC PIT IS CONSTRUCTED, LINED, AND FENCED. PITS HAVE PLENTY OF FREEBOARD. NO CREWS ON SITE |
1833720 | Primary Facility | 2009-09-24 | Routine/Complete Inspection | No Violations Noted | Well is drilled and equipped for production at the time of inspection. No signs of erosion and sedimentation on the access road and well site. The site is being regraded, seeded, and mulched at the time of inspection. The stream crossing has been properly installed. The operator should continue to monitor the well site for erosion and sedimentation. |
For data sources see[7]