If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27110 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.404622,"lon":-79.384965,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: JANOSCRAT 4 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2007-09-21 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.404622 | |
Longitude: -79.384965 |
Date | Event |
---|---|
2007-09-21 | New Permit Application |
2008-04-19 | Performed Spud Operation |
2008-04-23 | Drilling Completion |
2008-05-05 | Perforation |
2009-11-05 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | DANNIC ENERGY CORP | 4,678.85 | 215 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 3,484.74 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 2,057.63 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 0.00 | 0 | 1603.04 | 304 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 1,377.05 | 305 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 1,493.31 | 304 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 1,087.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 1,078.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 1,029.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 833.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 932.56 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 967.19 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | DANNIC ENERGY CORP | Produced Fluid | 85.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1704950 | Primary Facility | 2008-04-23 | Drilling/Alteration | No Violations Noted | TD @ 4050', tripping @ inspection, pit e/s ok. |
1977459 | Primary Facility | 2011-06-02 | Site Restoration | No Violations Noted | Well is equipped for production. Tag located. Tank is in sound condition. There are no E&S concerns at this time. Vegetation is well established and the site has been properly restored for farm use. |
2636049 | Primary Facility | 2017-09-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears to be structurally sound. No E&S issues. |
For data sources see[7]