If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-129-27408 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.589118,"lon":-79.678721,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Lower Burrell City | |
| Operator Name: BARON GROUP INC | |
| Well Pad ID: | |
| Farm/Lease Name: R J ZYCH 1 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2008-04-15 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.589118 | |
| Longitude: -79.678721 |
| Date | Event |
|---|---|
| 2008-04-15 | New Permit Application |
| 2008-04-23 | Performed Spud Operation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | BARON GROUP INC | 1,341.00 | 61 | 0.00 | 0 | 0.00 | 0 |
| 2009 | BARON GROUP INC | 3,900.43 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | BARON GROUP INC | 3,134.60 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | BARON GROUP INC | 2,764.64 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2012 | BARON GROUP INC | 2,423.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2013 | BARON GROUP INC | 2,506.02 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | BARON GROUP INC | 2,292.85 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | BARON GROUP INC | 2,192.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | BARON GROUP INC | 2,137.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | BARON GROUP INC | 1,663.00 | 350 | 0.00 | 0 | 0.00 | 0 |
| 2018 | BARON GROUP INC | 1,478.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2008 | BARON GROUP INC | Fracking Fluid | 1,420.00 Bbl | Municipal Sewage Treatment Plant | PA0026255 |
| 2015 | BARON GROUP INC | Produced Fluid | 60 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
| 2015 | BARON GROUP INC | Produced Fluid | 60.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1704919 | Primary Facility | 2008-04-25 | Drilling/Alteration | No Violations Noted | rig spudded, oil leaking from compressor, pads on ground, pit e/s ok |
| 1739365 | Primary Facility | 2008-09-30 | Complaint Inspection | No Violations Noted | graded seeded & Mulched, no open pits, equipped for production |
| 1748160 | Primary Facility | 2008-11-04 | Complaint Inspection | No Violations Noted | drilling complete, e/s sign site ok |
| 2672579 | Primary Facility | 2017-12-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears structurally sound. No E&S issues. |
| 2710560 | Primary Facility | 2018-03-27 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, equipment and grounded 2100 gallon plastic fluid collection tank look ok. |
| 2775379 | Primary Facility | 2018-09-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears structurally sound. No E&S issues. |
For data sources see[7]