Well ID: 37-129-27442 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.437858,"lon":-79.366386,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: CANO 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-05-01 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.437858 | |
Longitude: -79.366386 |
Date | Event |
---|---|
2008-05-01 | New Permit Application |
2009-05-18 | Permit Renewal Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1729898 | Primary Facility | 2008-08-14 | Routine/Complete Inspection | No Violations Noted | Site underconstruction - E&S advice |
2513805 | Primary Facility | 2016-08-12 | Routine/Complete Inspection | Violation(s) Noted | Department records indicate well was permitted on 5/18/2008 and expired on 5/1/2010. At the time of inspection, site construction appears to have commenced, as indicated by what appears to be an access road and unlined drill pit. Well not drilled and site has not yet been restored. Additionally, during inspection, Department observed residual waste within the drill pit. Per current regulations if a well site is constructed and the well is not drilled, well site shall be restored within 30 days after the expiration of the well permit.
Department requests Operator follow-up with Department, in writing upon investigation of reported concerns identifying cause of violations, what Operator has done and will do to correct situation and achieve compliance and schedule/time frame of anticipated compliance activities. Violations are being issued under 25 Pa. Code § 78.65(2) for Operators failure to restore well site within 30 days of expiration of the permit. Additional violations may be forthcoming pending Depart |
2519010 | Primary Facility | 2016-09-09 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | Inspection performed as part of a follow-up to 8/12/2016 inspection (Insp.# 2513805 Enf.# 346336). At the time of inspection site restoration work does not appear to have commenced. Department will conduct follow-up inspections to monitor site restoration progress. |
2519238 | Primary Facility | 2016-09-15 | Administrative/File Review | Outstanding Violations - No Viols Req'd | On 9/15/16 @ 9:30am Department contacted Operator (Mr. Sinclair) to request 15 day Operator Response. Operator stated that response was forthcoming. Additionally, Operator stated that the residual waste within the drill pit had been illegally dumped and inquired about the associated work and cost for the disposal of the residual waste. Department informed Operator that Operator would have to pursue this independently as a civil matter with the responsible party. Furthermore, Operator is responsible to ensure that all permit conditions are satisfied. Operator expects to start site restoration work soon. |
2544425 | Primary Facility | 2016-11-14 | Follow-up Inspection | In Compliance with Schedule | Inspection performed as part of a follow-up to 8/12/2016 inspection (Insp.# 2513805 Enf.# 346336). At the time of inspection site restoration appears to have been completed. Site appears to be reseeded. Uniform 70% perennial vegetative cover of the restored area has not been achieved. Department recommends Operator continue to monitor growth and perform routine monitoring of site to ensure stability of site is maintained. Department will conduct follow-up inspections to monitor site restoration progress. |
2544427 | Primary Facility | 2016-11-30 | Compliance Evaluation | In Compliance with Policy | Inspection was performed as a Compliance Evaluation to 8/12/2016 inspection (Insp.# 2513805 Enf.# 346336). At the time of inspection residual waste in unlined drill pit has been cleared and back-filled, site regarded pending seeding. Perennial vegetative growth has not been achieved yet. Department recommends Operator continue to monitor site to ensure perennial growth is achieved and site stability is maintained. Department will conduct follow-up inspection to ensure vegetative growth is achieved.
Previously issued violations have been corrected. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2513805 | 766790 | 2016-08-12 | 2016-11-30 | 78.65(2) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
766790 | 346336 | NOV - Notice of Violation | 2018-05-21 | ||||
766790 | 364168 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-05-21 | 2018-05-21 | $2,500.00 | $2,500.00 |
For data sources see[6]