If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-129-27459 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.427883,"lon":-79.323349,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Derry Borough | |
| Operator Name: ALLIANCE PETRO CO LLC | |
| Well Pad ID: | |
| Farm/Lease Name: JACK KABO 4 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2008-05-15 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.427883 | |
| Longitude: -79.323349 |
| Date | Event |
|---|---|
| 2008-05-15 | New Permit Application |
| 2008-10-13 | Performed Spud Operation |
| 2008-10-16 | Drilling Completion |
| 2008-10-22 | Perforation |
| 2009-09-08 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | PHILLIPS EXPLORATION INC | 1906.00 | 43 | 0.00 | 0 | 0.00 | 0 |
| 2010 | PHILLIPS EXPLORATION INC | 14,366.00 | 363 | 0.00 | 0 | 0.00 | 0 |
| 2011 | PHILLIPS EXPLORATION INC | 8,268.00 | 351 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XTO ENERGY INC | 9,891.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2013 | XTO ENERGY INC | 8,466.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | XTO ENERGY INC | 6,694.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2015 | XTO ENERGY INC | 4,968.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | XTO ENERGY INC | 2,902.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | ALLIANCE PETRO CO LLC | 2,549.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2018 | ALLIANCE PETRO CO LLC | 3,206.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 35.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
| 2012 | XTO ENERGY INC | Produced Fluid | 22.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
| 2015 | XTO ENERGY INC | Produced Fluid | 32.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
| 2015 | XTO ENERGY INC | Produced Fluid | 32 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1837761 | Primary Facility | 2009-10-20 | Site Restoration | No Violations Noted | Drilling completed 10/16/2008. There is adequate vegetation at the time of inspection, however any areas that are lacking vegetation should be limed, fertilized, seeded, and mulched. No E&S concerns present at the time of inspection. Brine tank is sound and well is in production. The operator should monitor the well site and access road for erosion and sedimentation. |
| 2512887 | Primary Facility | 2016-08-18 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus was shut. Well head casing-equipment-grounded 100 bbl plastic tank looked ok. |
| 2643119 | Primary Facility | 2017-10-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears to be structurally sound. No E&S issues. |
For data sources see[7]