If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27763 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.146104,"lon":-79.55808,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: East Huntingdon Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: PISULA 001 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-11-19 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.146104 | |
Longitude: -79.558080 |
Date | Event |
---|---|
2008-11-19 | New Permit Application |
2009-02-06 | Performed Spud Operation |
2009-02-12 | Drilling Completion |
2009-02-19 | Perforation |
2011-01-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | KRIEBEL MINERALS INC | 9637.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2010 | KRIEBEL MINERALS INC | 17,339.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 11,564.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 11,788.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 7,324.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 6,120.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 5,521.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 5,193.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 4,272.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 3,883.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 2,279.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | KRIEBEL MINERALS INC | Drilling | 350.00 Bbl | Other | PA0091472 |
2009 | KRIEBEL MINERALS INC | Fracking Fluid | 1,440.00 Bbl | Other | PA0091472 |
2010 | KRIEBEL MINERALS INC | Produced Fluid | 70.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | KRIEBEL MINERALS INC | Produced Fluid | 70.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2016 | KRIEBEL MINERALS INC | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | KRIEBEL MINERALS INC | Produced Fluid | 40 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 30.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 15.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1770094 | Primary Facility | 2009-02-10 | Routine/Complete Inspection | No Violations Noted | Site constructed drill rig moving onsite and setting up at the time of the inspection. Noted no accelerated erosion & sedimentation on the acess road or well-site at the time of the inspection. Spoke with operator representative Mike Cioffi concerning the site and recommended that the operator implement additional BMP's associated with the culvert placed adjacent to the well pad, and that the access road be monitored to insure that minimal amounts of sediment are generated and transported onto the township road and subsequently US Route 119 North. |
For data sources see[7]