If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27855 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.380825,"lon":-79.328327,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 148269 | |
Farm/Lease Name: EAGLEHOUSE 5H | |
License Status: | |
Spud Date: 2010-10-01 | |
Permit Date: 2009-03-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.380825 | |
Longitude: -79.328327 |
Date | Event |
---|---|
2009-03-30 | New Permit Application |
2009-09-30 | Performed Spud Operation |
2010-02-05 | Drilling Completion |
2010-02-14 | Perforation |
2010-08-10 | Deviated |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | REX ENERGY OPERATING CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XPR RESOURCES LLC | 374,133.30 | 218 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 295,917.41 | 272 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 303,610.41 | 353 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 284,078.78 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 184,145.36 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 162,676.31 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 132,686.81 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 100,921.22 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 98,853.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 105,095.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | REX ENERGY OPERATING CORP | Drilling | 110.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2009 | REX ENERGY OPERATING CORP | Drilling | 570.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | XPR RESOURCES LLC | Fracing Fluid Waste | 4,775.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | REX ENERGY OPERATING CORP | Fracing Fluid Waste | 115.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010 | XPR RESOURCES LLC | Drilling Fluid Waste | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | REX ENERGY OPERATING CORP | Produced Fluid | 63.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XPR RESOURCES LLC | Produced Fluid | 2,095.23 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | REX ENERGY OPERATING CORP | Drilling Fluid Waste | 285.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | XPR RESOURCES LLC | Produced Fluid | 3,012.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | XPR RESOURCES LLC | Produced Fluid | 1,580.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | REX ENERGY OPERATING CORP | Fracing Fluid Waste | 3,165.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | REX ENERGY OPERATING CORP | Drilling Fluid Waste | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | REX ENERGY OPERATING CORP | Drilling Fluid Waste | 355.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XPR RESOURCES LLC | Fracing Fluid Waste | 650.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | XPR RESOURCES LLC | Produced Fluid | 1,870.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Produced Fluid | 550.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | XPR RESOURCES LLC | Produced Fluid | 330.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XPR RESOURCES LLC | Produced Fluid | 774.83 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 877.07 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 345.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 642.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 550.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 580.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2017 | XPR RESOURCES LLC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 350.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XPR RESOURCES LLC | Produced Fluid | 240.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 340.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1834791 | Primary Facility | 2009-10-01 | Drilling/Alteration | No Violations Noted | HOR MAR. UDI 37 JUST SPUDDED, CURRENTLY 28' BELOW CONDUCTOR, CREW STILL RIGGING UP. |
1834799 | Primary Facility | 2009-10-08 | Drilling/Alteration | No Violations Noted | UDI 37 DRILLING AHEAD. NO PROBLEMS. NO WATER OR COAL. |
1837234 | Primary Facility | 2009-10-20 | Routine/Complete Inspection | No Violations Noted | Well is drilled, not in production. Site ID sign laying on the ground with E&S plan present. No erosion and sedimentation concerns at the time of inspection. Pit is within freeboard. The driller in the process of tearing down the rig at the time of inspection |
1853663 | Primary Facility | 2009-12-09 | Drilling/Alteration | No Violations Noted | Horizontal Marcellus |
1890032 | Primary Facility | 2010-05-08 | Routine/Complete Inspection | No Violations Noted | The Department conducted an investigation in relation to a GP-8 permit that had expired. Eaglehouse 5H was drilled and appeared to be in production at this time. Site has achieved 70% vegetative growth and the well pad had been fenced off. The farmer had turned the site back over to a pasture field for his cattle. As per the regulations, the operator has one year to install and remove the temporary stream crossing. This site still had the temporary stream crossings in place. The Department requests that the operator applies for a GP-7 permit by 6/23/10. |
1910737 | Primary Facility | 2010-09-07 | Administrative/File Review | In Compliance with Policy | OG57 waiver admin review |
1910738 | Primary Facility | 2010-09-07 | Routine/Complete Inspection | No Violations Noted | OG57 waiver - field review |
1913146 | Primary Facility | 2010-09-15 | Complaint Inspection | No Violations Noted | Site inspection performed in conjunction with WQS Dana Burk. Drilling was completed at the time of the inspection. Due to landowner requests the operator has constructed numerous above grade pits onsite to hold the contents of the encapsulated pit they have excavated to have the cuttings hauled off-site to a landfill. Noted that the above grade pits had a large amount of cuttings and material and would thus not be capable of handling a large volume of water as a result of rain. Contacted the operator regarding this matter and in addition to get a timeframe for the completion of the removal of drill cuttings. Operator was to contact WQS Burk regarding this matter. |
1973313 | Primary Facility | 2011-04-22 | Routine/Complete Inspection | No Violations Noted | HORIZONAL MARCELLUS |
2501257 | Primary Facility | 2016-07-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2690514 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | Violation(s) Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appear to be structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. PPC plan and ERP appear to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violations are being issued under 25 PA Code 78a.55(i)(5)(i) and 25 PA Code 78a.55(i)(5)(iii). |
2738261 | Primary Facility | 2018-03-02 | Compliance Evaluation | No Violations Noted | ERP and PPC plan updated.
Previously issued violations have been corrected. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2690514 | 807757 | 2018-02-01 | 2018-03-02 | 78a55(i)5i | Environmental Health & Safety | |
2690514 | 807758 | 2018-02-01 | 2018-03-02 | 78a55(i)5iii | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
807757 | 361323 | NOV - Notice of Violation | 2019-01-23 | ||||
807757 | 371697 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2019-01-23 | 2019-01-23 | $11,000.00 | $11,000.00 |
807758 | 361323 | NOV - Notice of Violation | 2019-01-23 | ||||
807758 | 371697 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2019-01-23 | 2019-01-23 | $11,000.00 | $11,000.00 |
For data sources see[7]