If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27889 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.606237,"lon":-79.562353,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Vandergrift Borough | |
Operator Name: WINFALL ENERGY INC N V | |
Well Pad ID: | |
Farm/Lease Name: SPANIEL 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-04-23 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.606237 | |
Longitude: -79.562353 |
Date | Event |
---|---|
2009-04-23 | New Permit Application |
2010-05-10 | Permit Renewal Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | WINFALL ENERGY INC N V | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1778562 | Primary Facility | 2009-03-24 | Routine/Complete Inspection | No Violations Noted | Site not constructed at the time of the inspection. Noted that there is a well immediately adjacent to the proposed well head. The Department reccomends that the operator rock the well pad so as to minimize the amount of sediment generated during well site construction and the subsequent drilling and/or stimulation activities. The E&S plan as compiled should effectively minimize accelerated erosion & sedimeentatio, provided the plan is implemented and maintained properly. |
For data sources see[6]