If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.370528,"lon":-79.343667,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 147054 | |
Farm/Lease Name: PANIZZI UNIT NO1 3H | |
License Status: | |
Spud Date: 2009-09-23 | |
Permit Date: 2009-08-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.370528 | |
Longitude: -79.343667 |
Date | Event |
---|---|
2009-08-25 | New Permit Application |
2009-09-22 | Performed Spud Operation |
2009-11-23 | Drilling Completion |
2009-12-07 | Perforation |
2010-04-13 | Deviated |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | REX ENERGY OPERATING CORP | 24852.91 | 31 | 0.00 | 0 | 0.00 | 0 |
2010 | XPR RESOURCES LLC | 164,133.68 | 150 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 197,685.49 | 302 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 167,777.77 | 350 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 151,735.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 116,445.75 | 361 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 114,161.18 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 98,802.89 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 86,409.25 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 80,977.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 75,218.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | REX ENERGY OPERATING CORP | Fracking Fluid | 110.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | REX ENERGY OPERATING CORP | Fracking Fluid | 8,640.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2009 | REX ENERGY OPERATING CORP | Drilling | 1,870.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | XPR RESOURCES LLC | Fracing Fluid Waste | 1,600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | XPR RESOURCES LLC | Fracing Fluid Waste | 1,700.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | REX ENERGY OPERATING CORP | Fracing Fluid Waste | 280.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | XPR RESOURCES LLC | Produced Fluid | 600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XPR RESOURCES LLC | Produced Fluid | 2,800.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | REX ENERGY OPERATING CORP | Drilling Fluid Waste | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | REX ENERGY OPERATING CORP | Drilling Fluid Waste | 552.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | REX ENERGY OPERATING CORP | Fracing Fluid Waste | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | REX ENERGY OPERATING CORP | Drilling Fluid Waste | 300.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XPR RESOURCES LLC | Fracing Fluid Waste | 1,010.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XPR RESOURCES LLC | Fracing Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Produced Fluid | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Produced Fluid | 990.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | XPR RESOURCES LLC | Produced Fluid | 205.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XPR RESOURCES LLC | Produced Fluid | 335.88 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 330.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 555.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 762.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 550.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 330.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2017 | XPR RESOURCES LLC | Produced Fluid | 490.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 240.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XPR RESOURCES LLC | Produced Fluid | 480.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 350.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1834781 | Primary Facility | 2009-09-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS. UDI 37 DRILLING TOP HOLE. PITS LOOK GOOD. ES PLAN SHOWS PITS ON FILL SIDE OF LOCATION INSTEAD OF CUT SIDE. |
1834784 | Primary Facility | 2009-10-01 | Drilling/Alteration | No Violations Noted | HOR MAR. UDI 37 MOVED OUT. WATER TRUCKS ARE PUMPING PITS. UDI 124 COMING IN TO DRILL THE HORIZONTAL |
1834787 | Primary Facility | 2009-09-29 | Drilling/Alteration | No Violations Noted | HOR MAR. UDI 37 ALMOST DONE WITH TOPHOLE, THEY WILL BE MOVING TONIGHT. |
1837027 | Primary Facility | 2009-10-20 | Routine/Complete Inspection | No Violations Noted | Well is drilled, not in production. Site ID sign laying on the ground with E&S plan present. No erosion and sedimentation concerns at the time of inspection. Pit is within freeboard. The well cellar was full of water with a layer of some type of petroleum product on the surface. The operator was to remove the liquid with a vac truck as per the conversation with the company man on the date of the inspection. |
1837966 | Primary Facility | 2009-10-22 | Routine/Complete Inspection | No Violations Noted | Well is drilled, not in production. Site ID sign laying on the ground with E&S plan present. No erosion and sedimentation concerns at the time of inspection. Pit is within freeboard. The well cellar was approximately 80% empty. The oily substance along with some water remains. Operator should remove the remaining substance in the cellar. The use of absorbant pads may be neccesary to remove the petroleum and detergent products. |
2159173 | Primary Facility | 2013-04-09 | Site Restoration | No Violations Noted | Inspection the result of an NOT received by the Department on 4/8/2013. At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tanks appear to be in sound working condition. The site appears to meet the restoration criteria of 70% uniform vegetative coverage. No observation of accelerated erosion and sedimentation in relation to the access road or well pad. The Department notes that the Operator has removed perimeter E&S controls. The site appears to meet the requirements set forth by the ESCGP-1 restoration and post construction water management plan. The Department approves the Operators request for the Notice of Termination, ESX09-129-0018. |
2327998 | Primary Facility | 2014-12-09 | Complaint Inspection | No Violations Noted | 1 tank and 1 skid box onsite. Tag and e&s ok. |
2442027 | Primary Facility | 2016-01-14 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized with no E& S issues in relation to site and/or access road. |
2474458 | Primary Facility | 2016-04-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok. |
2621728 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2678414 | Primary Facility | 2018-01-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appear structurally sound. No E&S issues. |
2690516 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | Violation(s) Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appear to be structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. PPC plan and ERP appear to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violations are being issued under 25 PA Code 78a.55(i)(5)(i) and 25 PA Code 78a.55(i)(5)(iii). |
2738225 | Primary Facility | 2018-03-02 | Compliance Evaluation | No Violations Noted | ERP and PPC plan updated.
Previously issued violations have been corrected. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2690516 | 807598 | 2018-02-01 | 2018-03-02 | 78a55(i)5i | Environmental Health & Safety | |
2690516 | 807599 | 2018-02-01 | 2018-03-02 | 78a55(i)5iii | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
807598 | 361323 | NOV - Notice of Violation | 2019-01-23 | ||||
807598 | 371697 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2019-01-23 | 2019-01-23 | $11,000.00 | $11,000.00 |
807599 | 361323 | NOV - Notice of Violation | 2019-01-23 | ||||
807599 | 371697 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2019-01-23 | 2019-01-23 | $11,000.00 | $11,000.00 |
For data sources see[7]