If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.268521,"lon":-79.447748,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Unity Township | |
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: UNITY LAND MGMT 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-18 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.268521 | |
Longitude: -79.447748 |
Date | Event |
---|---|
2009-09-18 | New Permit Application |
2009-10-21 | Performed Spud Operation |
2009-10-27 | Drilling Completion |
2009-11-03 | Perforation |
2013-05-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | KRIEBEL MINERALS INC | 253.00 | 30 | 0.00 | 0 | 0.00 | 0 |
2010 | KRIEBEL MINERALS INC | 15,045.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | KRIEBEL MINERALS INC | 13,668.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2012 | KRIEBEL MINERALS INC | 10,724.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2013 | KRIEBEL MINERALS INC | 8,430.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | KRIEBEL MINERALS INC | 6,608.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | KRIEBEL MINERALS INC | 4,490.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2016 | KRIEBEL MINERALS INC | 7,147.00 | 335 | 0.00 | 0 | 0.00 | 0 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | 5,824.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | 4,399.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | 3,687.00 | 334 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | KRIEBEL MINERALS INC | Fracking Fluid | 110.00 Bbl | Other | PA0095443 |
2009 | KRIEBEL MINERALS INC | Drilling | 440.00 Bbl | Other | PA0091472 |
2009 | KRIEBEL MINERALS INC | Fracking Fluid | 990.00 Bbl | Other | PA0091472 |
2012 | KRIEBEL MINERALS INC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012 | KRIEBEL MINERALS INC | Produced Fluid | 35.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 40 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | KRIEBEL MINERALS INC | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | KRIEBEL MINERALS INC | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | KRIEBEL MINERALS INC | Produced Fluid | 70 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2017 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 40.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | KRIEBEL WELLS DISSOLUTION CO LLC | Produced Fluid | 70.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1838442 | Primary Facility | 2009-10-22 | Drilling/Alteration | No Violations Noted | hole @480' Drilling resumed aprox. 10 hrs after cementing 9 5/8 |
1842749 | Primary Facility | 2009-10-22 | Drilling/Alteration | No Violations Noted | FALCON DRILLING AHEAD, TP RANDY SAYS HE ISN'T SURE HOW DEEP NEAREST AQUAFER IS (700' AWAY) PROGNOSIS DOESN'T SPECIFY. MICHELLE IN THE OFFICE CONFIRMS THAT IT IS ONLY 120' AND IS PROTECTED |
1843295 | Primary Facility | 2009-10-30 | Routine/Complete Inspection | No Violations Noted | Well is drilled, but not in production. No signs of erosion and sedimentation on the access road and well site. The drill pit is within freeboard requirements. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete. |
For data sources see[7]