If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28071 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.162175,"lon":-79.344392,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Cook Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 145574 | |
Farm/Lease Name: OELSCHLAGER UNIT | |
License Status: Plugged and Abandoned | |
Spud Date: 2009-12-08 | |
Permit Date: 2009-10-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.162175 | |
Longitude: -79.344392 |
Date | Event |
---|---|
2009-10-07 | New Permit Application |
2010-01-05 | Drilling Completion |
2010-03-29 | Perforation |
2010-03-30 | Perforation |
2010-03-30 | Performed Stage 1 of Stimulation |
2010-03-30 | Performed Stage 2 of Stimulation |
2010-07-06 | New Permit Application |
2010-08-10 | Performed Spud Operation |
2011-06-26 | Perforation |
2011-06-27 | Performed Stage 1 of Stimulation |
2015-07-29 | Begin Plugging |
2015-08-18 | Finished Plugging |
2019-10-23 | Deviated |
2019-10-23 | Fully Plugged |
2019-11-21 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-06-27 | 1 | Ottawa Sand | 339,795 | 8,863 | 0 |
2010-03-30 | 2 | SAND | 339,795 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | LONGFELLOW ENERGY LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | LONGFELLOW ENERGY LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 640.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Fracing Fluid Waste | 248.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Produced Fluid | 3,720.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2015 | XPR RESOURCES LLC | Servicing Fluid | 34.00 Bbl | LANDFILL | 100434 |
2015 | XPR RESOURCES LLC | Fracing Fluid Waste | 2,320.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1826367 | Primary Facility | 2009-09-04 | Routine/Complete Inspection | No Violations Noted | The well site is in the predrill phase. E&S plan is located onsite at the time of inspection. The roadside ditch on the left side of the access road as you enter the site should be stabilized with rip-rap to prevent off-site transportation of sediment. At the time of inspection there was a steady flow of water and it had not rained in days. The ditch continues along a homeowners yard and into a stormdrain along the main highway. No signs of erosion and sedimentation at the time of the inspection. |
1850402 | Primary Facility | 2009-12-11 | Routine/Complete Inspection | No Violations Noted | Site is being drilled currently. |
1853677 | Primary Facility | 2009-12-18 | Drilling/Alteration | No Violations Noted | HWD RIG 3 DRILLING AHEAD. FLOW LINE IS DUSTING HILLSIDE. TP JEREMY IS HAVING A TRASH PUMP HOOKED UP TO CIRCULATE PIT WATER BACK THROUGH THE FLOWLINE TO CONTROL DUST. HOUSEKEEPING IS EXCELLENT. CUT SIDE OF LOCATION HAS SOME EXPOSED COAL BUT CULVERT WATER APPEARS TO BE CLEAR FOR NOW. |
1863350 | Primary Facility | 2009-12-30 | Drilling/Alteration | No Violations Noted | MARCELLUS |
1916496 | Primary Facility | 2010-08-15 | Drilling/Alteration | No Violations Noted | E&S GOOD, FILTER FABRIC AROUND FUEL & MUD TANKS |
1916678 | Primary Facility | 2010-07-01 | Drilling/Alteration | No Violations Noted | drilling/E&S ok/ID&pit ok |
1923918 | Primary Facility | 2010-10-01 | Drilling/Alteration | No Violations Noted | MARCELLUS - drilling/E&S ok/ID&pit ok |
2012764 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | Pending | Site visit was part of routine inspection. Jason Branan DEP Inspector was present. |
2012769 | Primary Facility | 2011-10-21 | Routine/Complete Inspection | Pending | Site visit was part of follow-up to meeting with Dave Freudenrich, Randy Reimold and Dean Tinsley on 10-18-11 at SWRO. |
2016801 | Primary Facility | 2011-11-03 | Routine/Complete Inspection | Pending | Site visit was part of routine inspection/follow-up to 10-21-11 inspection. |
2024575 | Primary Facility | 2011-12-05 | Routine/Complete Inspection | No Violations Noted | Pending violation was administratively closed due to remediation of the site. |
2099296 | Primary Facility | 2012-09-10 | Complaint Inspection | No Violations Noted | 2 wells onsite. No equipment or tanks. E&S ok. |
2131508 | Primary Facility | 2013-01-16 | Routine/Complete Inspection | No Violations Noted | |
2400653 | Primary Facility | 2015-08-07 | Routine/Complete Inspection | Violation(s) Noted | 8/6/2015 Talked with WPX Rep. M. Wilson, waiting on 8.75" mill. WPX Energy failed to follow the +3 day notification. |
2542455 | Primary Facility | 2016-12-07 | Site Restoration | No Violations Noted | At the time of inspection the well was plugged with monument installed. See inspection report # 2542396 to additional information pertaining to the site inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2400653 | 732882 | 08/07/2015 | 2015-08-07 | OGA 3220(C) - Failure to notify DEP, the coal operator, lessee and owner prior to plugging a well and submit a plat. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
732882 | 328766 | NOV - Notice of Violation |
For data sources see[8]