X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28254

Well Details

Well ID: 37-129-28254
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: RICH HILL COAL MINING COMPANY 4
License Status:
Spud Date:
Permit Date: 2010-01-12
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.451119
Longitude: -79.392554

For data sources see[1][2][3]

Well History

Date Event
2010-01-12 New Permit Application
2010-08-09 Performed Spud Operation
2010-08-14 Drilling Completion
2010-08-19 Perforation
2011-01-11 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 1,339.00 82 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 3,377.00 363 133.23 363 0.00 0
2012 XTO ENERGY INC 2,069.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 1,764.00 365 97.23 365 0.00 0
2014 XTO ENERGY INC 1,200.00 298 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 1,466.00 186 99.03 186 0.00 0
2017 ALLIANCE PETRO CO LLC 1,010.00 334 28.00 334 0.00 0
2018 ALLIANCE PETRO CO LLC 960.00 365 74.00 365 0.00 0
2019 ALLIANCE PETRO CO LLC 969.00 365 84.00 92 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PHILLIPS EXPLORATION INC Produced Fluid 24.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2011 PHILLIPS EXPLORATION INC Produced Fluid 24.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 23.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PHILLIPS EXPLORATION INC Produced Fluid 114.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 14.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 XTO ENERGY INC Produced Fluid 8.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 XTO ENERGY INC Produced Fluid 6.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 XTO ENERGY INC Produced Fluid 6 Bbl CENT WASTE TRT FAC NPDES PA0095443
2016 XTO ENERGY INC Produced Fluid 3.66 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 3.66 Bbl CENT WASTE TRT FAC NPDES PA0095273
2019 ALLIANCE PETRO CO LLC Produced Fluid 47.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1904943 Primary Facility 2010-08-11 Drilling/Alteration No Violations Noted Pit aligned with plastic and secure fence was present. No freeboard issues. Well tag and E&S plan was present at the site. Conductor (13 3/8¿) set 55 ft. Stratigraphy consisted of Sh, SS and coal. ¿Broken¿ written on log at 351-352¿ and 356-357 ft. DEP assumes that it was highly fractured zone or coal seam. PC driller does not believe it was a coal mine. PC set a water protector casing 9 5/8¿ to 413 ft. With 180 sks class A. (balance job) with 1 bbl return. E&S controls were present. Based on site conditions, no indication of IW issues at the site. No E&S issues at the site. Current depth at 930 ft.
1905500 Primary Facility 2010-08-13 Drilling/Alteration No Violations Noted Pit aligned with plastic and secure fence was present. No freeboard issues. Well tag and E&S plan was present at the site. Conductor (13 3/8¿) set 55 ft. Stratigraphy consisted of Sh, SS and coal. PC set a 1267 ft. of 7¿ and used 170 lead sks and 75 sks of tail. Plug down 23:00 hrs with 15 bbl return on 8/11/10. 8 hr allotment was allowed prior to commencement of drilling activity. Current depth was 3450 ft. E&S controls were present. Based on site conditions, no indication of IW issues at the site. No E&S issues at the site. Current depth at 930 ft.
1910348 Primary Facility 2010-09-02 Routine/Complete Inspection No Violations Noted Well site has been drilled, but is not equipped for production. Pit is still on-site / appears to be in sound condition. Site ID sign and E&S plan located.
1973544 Primary Facility 2011-05-18 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2051694 Primary Facility 2012-03-12 Site Restoration No Violations Noted Well appears to drilled and equipped for production. Well apparatus and brine tank located on site appear to be in sound condition. There was no accelerated erosion observed on well pad or access road. The site is restored and meets the 70% vegetative coverage criteria.
2576277 Primary Facility 2017-03-28 Routine/Complete Inspection No Violations Noted Well tagged-shut in. Annulus shut. A check with Oil & Gas records disclosed production reported for the previous year. Well head casing-equipment-grounded 100 bbl plastic tank look ok.
2831384 Primary Facility 2019-01-25 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus shut. The well head casing, piping, equipment and grounded 100 bbl plastic fluid collection tank look ok.
2831408 Primary Facility 2019-01-25 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, equipment and grounded 100 bbl plastic fluid collection tank look ok.
2831674 Primary Facility 2019-01-25 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus shut. The well head casing, piping, equipment and grounded 100 bbl plastic fluid collection tank look ok.

For data sources see[7]

References