If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28299 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.336878,"lon":-79.360164,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 149486 | |
Farm/Lease Name: USCHAK 2 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.336878 | |
Longitude: -79.360164 |
Date | Event |
---|---|
2010-03-02 | New Permit Application |
2010-04-09 | Performed Spud Operation |
2010-11-29 | Drilling Completion |
2011-05-15 | Perforation |
2016-06-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-28 | 2011-05-28 | 8,189 | 3,601,595 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BE-9M | Halliburton Energy Services | Biocide | |||||
Methanol | 67-56-1 | 30.00 | 0.01 | |||||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00482000 | |||||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 12.11 | ||
LGC-36 | Halliburton Energy Services | Gel | Paraffinic Solvent | 60.00 | 0.00097000 | |||
Polysaccharide | 60.00 | 0.00097000 | ||||||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00402000 | ||
Water | Municipal Authority of Derry Borough | Carrier/Base Fluid | Water | 100.00 | 87.72 | |||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00063000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.10 | ||
GBW-30 Breaker | Halliburton Energy Services | Breaker | ||||||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00009000 | |||||
Carbohydrates | 95.00 | 0.00059000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 512,087.82 | 205 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 561,864.94 | 363 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 575,795.77 | 353 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 399,262.56 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 304,214.12 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 237,902.02 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 193,249.38 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 155,312.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 151,269.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | Drill Cuttings | 646.00 Tons | LANDFILL | 100434 |
2012 | XPR RESOURCES LLC | Produced Fluid | 1,494.29 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 555.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 698.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 813.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 440.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Waste Water Treatment Sludge | 50.30 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Produced Fluid | 264.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 462.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 572.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 602.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XPR RESOURCES LLC | Produced Fluid | 236.66 Bbl | REUSE (AT WELL PAD) | |
2018 | XPR RESOURCES LLC | Synthetic Liner Materials | 0.92 Tons | LANDFILL | 100277 |
2019 | XPR RESOURCES LLC | Produced Fluid | 278.33 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 84.17 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | XPR RESOURCES LLC | Produced Fluid | 135.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1877433 | Primary Facility | 2010-04-14 | Routine/Complete Inspection | No Violations Noted | Well is being spudded currently. |
1888174 | Primary Facility | 2010-05-26 | Routine/Complete Inspection | No Violations Noted | Well is being drilled currently. |
1930302 | Primary Facility | 2010-11-23 | Drilling/Alteration | No Violations Noted | H&P RIG 287 DRILLING ON WILLIAMS PAD. E&S, PITS, AND HOUSE KEEPING GOOD. DEPTH 7948 |
2013927 | Primary Facility | 2011-10-26 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2020733 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2038280 | Primary Facility | 2012-01-26 | Routine/Complete Inspection | No Violations Noted | Site visit was due to preconstruction meeting. |
2052736 | Primary Facility | 2012-03-20 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2058133 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | RECLAIMED/VEGETATED, ALSO HAS 4 PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. |
2105844 | Primary Facility | 2012-10-09 | Routine/Complete Inspection | No Violations Noted | |
2120192 | Primary Facility | 2012-12-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road. |
2134638 | Primary Facility | 2013-01-18 | Routine/Complete Inspection | No Violations Noted | HORIZONAL MARCELLUS |
2383427 | Primary Facility | 2015-06-29 | Routine/Complete Inspection | No Violations Noted | 6/29/2015 Produced fluids tank diked, reclaimed, and GPU's |
2444022 | Primary Facility | 2016-01-25 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road. |
2474203 | Primary Facility | 2016-04-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set-tank battery-dike look ok. |
2556104 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2561612 | Primary Facility | 2017-02-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2621781 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2692652 | Primary Facility | 2018-02-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appears structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. PPC plan updated to reflect current Operator information. ERP not on site. Department request Operator update documents accordingly in accordance with regulations. Violation issued (see inspection id 2692647). |
2842448 | Primary Facility | 2019-02-15 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head protected by cement posts. Four brine tanks on site. |
For data sources see[8]