If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28380 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.341972,"lon":-79.088983,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Saint Clair Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148350 | |
Farm/Lease Name: FLICKINGER 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.341972 | |
Longitude: -79.088983 |
Date | Event |
---|---|
2010-08-02 | New Permit Application |
2011-01-04 | New Permit Application |
2011-02-17 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-04-18 | 2011-04-18 | 8,231 | 7,031,892 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexbreak 145 | Chemplex | Acid Non-Emulsifier | Other | 85.00 | 0.00030000 | ||
Methanol | 67-56-1 | 15.00 | 0.00005000 | |||||
Ammonium Persulfate Break | Chemplex | Gel Breaker | Other | 1.00 | 0.00 | |||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 99.00 | 0.00 | |||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.02 | |||
Claymax | Chemplex | Clay Stabilizer | 100.00 | 0.14 | ||||
7.5 HCl Acid | Skylkine Chemical Corp. | Cleaning | ||||||
Water | 7732-18-5 | 92.50 | 0.38 | |||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.03 | |||||
Feriplex 40 - Acid - Additives | Chemplex | Iron Control | Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00048000 | ||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00002000 | |||||
Other | 57.00 | 0.00069000 | ||||||
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00001000 | |||||
Plexcide 24L | Chemplex | Biocide | ||||||
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00120000 | |||||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00690000 | |||||
Other | 72.00 | 0.02 | ||||||
Water | Water | 7732-18-5 | 100.00 | 87.27 | ||||
Scale Inhibitor - Greenhib 677 | Chemplex | Scale Inhibitor | Other | 75.00 | 0.01 | |||
Salt of phosphonomethylated diamine | 25.00 | 0.00620000 | ||||||
Plexhib 256 | Chemplex | Corrosion Inhibitor | 100.00 | |||||
Other | 52.00 | 0.00016000 | ||||||
Propargyl alcohol | 107-19-7 | 8.00 | 0.00002000 | |||||
Methanol | 67-56-1 | 40.00 | 0.00012000 | |||||
Plexslick 921 | Chemplex | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
Other | 70.00 | 0.06 | ||||||
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 474,610.00 | 225 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 364,957.00 | 262 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 319,510.00 | 296 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 236,361.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 188,027.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 179,877.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 160,276.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 139,064.90 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 122,088.92 | 342 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Produced Fluid | 111.00 Bbl | INJECTION DISPOSAL WELL | 34-151-22783 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 1,045.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | XTO ENERGY INC | Produced Fluid | 3,812.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 3,876.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | XTO ENERGY INC | Produced Fluid | 3,576.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 5,779.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-167-29395 |
2011 | XTO ENERGY INC | Produced Fluid | 721.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XTO ENERGY INC | Produced Fluid | 316.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 446.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XTO ENERGY INC | Produced Fluid | 107.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | XTO ENERGY INC | Produced Fluid | 2,708.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2011 | XTO ENERGY INC | Produced Fluid | 18.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 638.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 1,226.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Produced Fluid | 101.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 101.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 101.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 7,542.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 2,353.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 2,353.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 198.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 2,288.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 486.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 486.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 199.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 2,511.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 120.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 1,199.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 74.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,365.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 480.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 123.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 325.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 1,755.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,701.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 176.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 397.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 54.36 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 897.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 166.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 250.80 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 318.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 643.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 35.20 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1896786 | Primary Facility | 2010-06-29 | Routine/Complete Inspection | No Violations Noted | Request for waiver of distance requirement- Well site is proposed to be constructed within 100 ft of Tubmill Run which is classified as a TSF. Well site is staked and is constructed due to previous well drilling on the pad.. Proposed E&S plan should protect the stream from adverse impact during well site construction if properly implemented and maintained. |
1955067 | Primary Facility | 2011-03-02 | Routine/Complete Inspection | No Violations Noted | Site visit was in response to a gas odor complaint received on Tuesday 3-1-2011. |
1956105 | Primary Facility | 2011-03-01 | Drilling/Alteration | No Violations Noted | HORIZONAL MARCELLUS |
1965162 | Primary Facility | 2011-03-14 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1965171 | Primary Facility | 2011-03-22 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1977269 | Primary Facility | 2011-05-31 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
1977462 | Primary Facility | 2011-05-05 | Routine/Complete Inspection | No Violations Noted | Site visit was in response to odor complaint. |
1984139 | Primary Facility | 2011-06-20 | Complaint Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
1993461 | Primary Facility | 2011-06-02 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | Site visit was in response to notification of a brine spill on the pad. |
2010406 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2011039 | Primary Facility | 2011-10-05 | Complaint Inspection | No Violations Noted | Site visit was in response to complaint #283781. A conduit line was being installed along the outside of the pad. Concrete was being used in the installation. The concrete trucks washed there chutes on the front corner of the pad. This water did make its way into the ditch surrounding the site. However, no water left the site. Ben Kissel (XTO) was informed of the incident. The below grade line installation was complete, future installation will be above grade. |
2051605 | Primary Facility | 2012-03-19 | Routine/Complete Inspection | No Violations Noted | No issues noted. |
2073304 | Primary Facility | 2012-06-05 | Routine/Complete Inspection | No Violations Noted | Well is drilled, fraced and in line; location need to be reclaimed but is well stoned with no runoff issues; |
2089587 | Primary Facility | 2012-08-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection. No issues noted. |
2174069 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2213812 | Primary Facility | 2013-10-18 | Routine/Complete Inspection | No Violations Noted | This was a routine inspection. Early wet fall conditions were prevalent throughout the SWR. |
2294243 | Primary Facility | 2014-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The associated brine tank and well apparatus appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appears to be properly implemented and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad area. The Department suggests the Operator continue to monitor the site after weekly and significant precipitation events to ensure site stability is maintained. |
2451634 | Primary Facility | 2016-02-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Two brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2504370 | Primary Facility | 2016-07-22 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2595088 | Primary Facility | 2017-05-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. |
2676491 | Primary Facility | 2018-01-02 | Routine/Complete Inspection | No Violations Noted | System running no issues. Well tag present. Emergency contact sign present. |
2682701 | Primary Facility | 2018-01-16 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Well appears to be in production. Well head surrounded by cement barriers and security fence. |
2688606 | Primary Facility | 2018-01-31 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1993461 | 617021 | 06/02/2011 | 2011-06-02 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
617021 | 273440 | NOV - Notice of Violation | Comply/Closed | 2011-08-05 |
For data sources see[8]