37-129-28397

Well Details

Well ID: 37-129-28397
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 149487
Farm/Lease Name: USCHAK 1 1H
License Status:
Spud Date:
Permit Date: 2010-07-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.340358
Longitude: -79.363422

For data sources see[1][2][3]

Well History

Date Event
2010-07-23 New Permit Application
2010-10-29 Performed Spud Operation
2011-03-02 Drilling Completion
2011-07-11 Perforation
2013-04-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-07-05 2011-07-05 8,201 2,702,788

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 88.07
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 11.79
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.10
GBW-30 Breaker Halliburton Energy Services Breaker Carbohydrates 95.00 0.00007000
Hemicellulase enzyme 9012-54-8 15.00 0.00001000
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.00305000
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00102000
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00405000
WG-36 Gelling Agent Halliburton Energy Services Gel Guar gum 9000-30-0 100.00 0.00508000
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00007000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 XPR RESOURCES LLC 344,417.00 167 0.00 0 0.00 0
2012 XPR RESOURCES LLC 416,285.20 364 0.00 0 0.00 0
2013 XPR RESOURCES LLC 312,432.60 364 0.00 0 0.00 0
2014 XPR RESOURCES LLC 178,237.40 363 0.00 0 0.00 0
2015 XPR RESOURCES LLC 138,250.78 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 86,322.39 362 0.00 0 0.00 0
2017 XPR RESOURCES LLC 86,516.51 360 0.00 0 0.00 0
2018 XPR RESOURCES LLC 62,806.00 363 0.00 0 0.00 0
2019 XPR RESOURCES LLC 59,155.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Fracing Fluid Waste 1,844.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XPR RESOURCES LLC Drill Cuttings 256.00 Tons LANDFILL 100434
2011 XPR RESOURCES LLC Produced Fluid 990.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Fracing Fluid Waste 210.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Produced Fluid 939.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Drilling Fluid Waste 230.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 441.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 506.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 623.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Produced Fluid 192.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XPR RESOURCES LLC Waste comment only 0.00
2017 XPR RESOURCES LLC Produced Fluid 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017 XPR RESOURCES LLC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XPR RESOURCES LLC Produced Fluid 123.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XPR RESOURCES LLC Produced Fluid 80.00 Bbl REUSE (AT WELL PAD)
2019 XPR RESOURCES LLC Produced Fluid 177.50 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1949557 Primary Facility 2011-02-02 Routine/Complete Inspection No Violations Noted Inspection was conducted during routine site visit.
1956036 Primary Facility 2011-03-07 Routine/Complete Inspection No Violations Noted Site being prepared for Frac Job.
1956108 Primary Facility 2011-03-01 Drilling/Alteration No Violations Noted HORIZONAL MARCELLUS
2020710 Primary Facility 2011-11-18 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2048835 Primary Facility 2012-02-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052709 Primary Facility 2012-03-13 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2058683 Primary Facility 2012-04-03 Routine/Complete Inspection No Violations Noted NOT RECLAIMED. HAS 4 PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2120197 Primary Facility 2012-12-04 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road.
2131196 Primary Facility 2013-01-11 Routine/Complete Inspection No Violations Noted HORIZONAL MARCELLUS
2179704 Primary Facility 2013-06-25 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has started the seep remediation located on the fill side of the well site.
2182021 Primary Facility 2013-07-09 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has finished the installation of the infiltration ditch located on the fill side of the well site, additional the Operator has started to install additional infiltration ditches in the fill side area of the pad directly in front of the well heads. At the time of inspection he area located on the cut side of the well pad has not been regraded.
2274470 Primary Facility 2014-05-21 Routine/Complete Inspection No Violations Noted 5/21/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2326006 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted 12/3/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2347419 Primary Facility 2015-02-18 Routine/Complete Inspection No Violations Noted 2/24/2015 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. Inspected w/OGI P. Wyrwas
2374568 Primary Facility 2015-05-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be functioning properly.
2377805 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted 6/9/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND GPU'S ON PAD.
2444212 Primary Facility 2016-01-25 Routine/Complete Inspection No Violations Noted Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road.
2474226 Primary Facility 2016-04-12 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set- tank battery and dike look ok.
2556095 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2556719 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2621778 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2681091 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound.

Ongoing pyritic seeps concerns are being addressed under ESCGP ESX10-129-0015, Site ID 735951, Inspection ID 2681073.

2692631 Primary Facility 2018-02-09 Routine/Partial Inspection Violation(s) Noted At the time of inspection well appears equipped for production. Brine tank within secondary containment and appears structurally sound. Ongoing pyritic seeps concerns are being addressed under ESCGP ESX10-129-0015, Site ID 735951, Inspection ID 2681073. No E&S issues.

Site id sign updated to reflect current Operator information. PPC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulations. Violations are being issued under 25PA Code 78a.55(i)(5)(i) and 25PA Code 78a.55(i)(5)(iii).

2741113 Primary Facility 2018-03-02 Compliance Evaluation No Violations Noted ERP and PPC plan updated.

Previously issued violations have been corrected.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2692631 807811 2018-02-09 2018-03-02 78a55(i)5i Environmental Health & Safety
2692631 807812 2018-02-09 2018-03-02 78a55(i)5iii Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
807811 368695 NOV - Notice of Violation 2018-10-24
807811 368696 COA - Consent Order and Agreement COMP - Completed 2018-10-24 $18,600.00 $18,600.00
807812 368695 NOV - Notice of Violation 2018-10-24
807812 368696 COA - Consent Order and Agreement COMP - Completed 2018-10-24 $18,600.00 $18,600.00

For data sources see[8]

References