If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28441 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.349033,"lon":-79.347072,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 148826 | |
Farm/Lease Name: MARCO 1H-A | |
License Status: | |
Spud Date: | |
Permit Date: 2010-10-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.349033 | |
Longitude: -79.347072 |
Date | Event |
---|---|
2010-10-05 | New Permit Application |
2011-01-27 | Performed Spud Operation |
2011-03-18 | Drilling Completion |
2011-05-31 | Drilling Completion |
2011-11-26 | Perforation |
2012-11-06 | DEVIATED |
2012-12-03 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-12-01 | 2011-12-01 | 8,250 | 4,210,580 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.05 | |
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 12.73 | ||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00360000 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00130000 | ||
LGC-36 UC | Halliburton Energy Services | Gel | Naphtha, petroleum, hydrotreated heavy | 64742-48-9 | 50.00 | 0.00250000 | ||
Guar gum | 9000-30-0 | 50.00 | 0.00250000 | |||||
Water | Municipal Authority of Derry Borough | Carrier/Base Fluid | Water | 100.00 | 87.18 | |||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
BE-9M | Halliburton Energy Services | Biocide | ||||||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00120000 | |||||
Methanol | 67-56-1 | 30.00 | 0.00350000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 67,006.00 | 14 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 862,025.94 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 485,788.34 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 286,717.74 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 222,757.42 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 142,580.81 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 166,282.04 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 127,237.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 104,388.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 440.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Drill Cuttings | 869.00 Tons | LANDFILL | 100419 |
2012 | XPR RESOURCES LLC | Drill Cuttings | 206.43 Tons | LANDFILL | 100277 |
2012 | XPR RESOURCES LLC | Fracing Fluid Waste | 42,720.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Produced Fluid | 1,136.88 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 489.07 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 406.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 810.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 467.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Synthetic Liner Materials | 6.83 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Produced Fluid | 198.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Fracturing Fluid Waste | 14.09 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Waste Water Treatment Sludge | 54.70 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Produced Fluid | 286.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 176.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2017 | XPR RESOURCES LLC | Produced Fluid | 264.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 96.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XPR RESOURCES LLC | Produced Fluid | 211.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 46.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 162.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1953103 | Primary Facility | 2011-02-08 | Routine/Complete Inspection | No Violations Noted | Inspection was conducted during construction of the pad. |
1959369 | Primary Facility | 2011-03-21 | Routine/Complete Inspection | No Violations Noted | Rig Just moving on ; |
1964464 | Primary Facility | 2011-04-01 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
1964472 | Primary Facility | 2011-04-05 | Routine/Complete Inspection | No Violations Noted | Site visit was conducted to check fluid levels after finding Uschak 1 pitt over top its freeboard. |
1965163 | Primary Facility | 2011-03-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | HORIZONTAL MARCELLUS |
1972156 | Primary Facility | 2011-05-12 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | |
1982925 | Primary Facility | 2011-05-12 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1982929 | Primary Facility | 2011-05-15 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1982932 | Primary Facility | 2011-05-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1982949 | Primary Facility | 2011-06-01 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1986724 | Primary Facility | 2011-07-07 | Routine/Complete Inspection | No Violations Noted | Site visit was in response to notification of a compressor fire that occurred over the July 2, 2011 weekend. |
2020597 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2048949 | Primary Facility | 2012-03-08 | Routine/Complete Inspection | No Violations Noted | This well was in production and being restored. No violations noted. |
2086011 | Primary Facility | 2012-07-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection ne issues noted. |
2149895 | Primary Facility | 2013-03-20 | Routine/Complete Inspection | No Violations Noted | no violations noted |
2274329 | Primary Facility | 2014-05-20 | Routine/Complete Inspection | No Violations Noted | 5/20/2014 5 GPU'S, RECAIMED AND 4 PRODUCED FLUIDS TANKS ON LOCATION. |
2284549 | Primary Facility | 2014-07-08 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road. |
2304301 | Primary Facility | 2014-08-07 | Routine/Complete Inspection | No Violations Noted | 8/7/2014 GPU's, Reclaimed and Produced fluids tanks on site. Inspected w/P. Wyrwas. |
2310333 | Primary Facility | 2014-10-03 | Routine/Complete Inspection | No Violations Noted | 10/3/2014 5 GPU'S, RECAIMED AND 4 PRODUCED FLUIDS TANKS ON LOCATION. |
2340715 | Primary Facility | 2015-01-27 | Routine/Complete Inspection | No Violations Noted | 1/27/2015 5 GPU'S, RECAIMED AND 4 PRODUCED FLUIDS TANKS ON LOCATION. |
2383396 | Primary Facility | 2015-06-24 | Routine/Complete Inspection | No Violations Noted | 6/24/2015 5 GPU'S, RECAIMED AND 4 PRODUCED FLUIDS TANKS ON LOCATION. |
2401509 | Primary Facility | 2015-08-20 | Routine/Complete Inspection | No Violations Noted | 8/20/2015 5 GPU'S, RECAIMED AND 4 PRODUCED FLUIDS TANKS ON LOCATION. |
2444349 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road. |
2466751 | Primary Facility | 2016-03-21 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appeared to be in sound condition. No observation of accelerated erosion or sedimentation observed during the inspection. See inspection # 2466747 for additional observations. |
2474239 | Primary Facility | 2016-04-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | This well was plugged @ 430' on 3/17/2011. Well ID marker and API # in place-legible and ok. |
2474262 | Primary Facility | 2016-04-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set-tank battery and dike look ok. |
2522371 | Primary Facility | 2016-09-21 | Complaint Inspection | No Violations Noted | 5 wells drilled and appear to be equipped for production. Impoundment being back-filled. |
2553877 | Primary Facility | 2017-01-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2556087 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing -production set equipment-tank battery-dike containment looked ok. |
2621755 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2690574 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. PPC plan and ERP appear to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violation issued (see inspection is 2690568). |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1972156 | 610763 | 05/12/2011 | 2011-05-12 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
610763 | 271094 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-05-27 | 2011-05-27 | $500.00 | $500.00 |
For data sources see[8]