If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28459 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.323889,"lon":-79.661083,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Hempfield Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: BENYAK 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-05 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.323889 | |
Longitude: -79.661083 |
Date | Event |
---|---|
2010-11-05 | New Permit Application |
2011-02-21 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 6,062.00 | 245 | 0.00 | 0 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 8,982.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 9,050.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 7,148.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 4,291.03 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 6,681.51 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 5,633.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 4,913.81 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 4,280.85 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PENNECO OIL CO INC | Produced Fluid | 180.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | PENNECO OIL CO INC | Drilling Fluid Waste | 5,530.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | PENNECO OIL CO INC | Produced Fluid | 265.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | PENNECO OIL CO INC | Produced Fluid | 75.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 75 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 50 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 57.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1952073 | Primary Facility | 2011-02-24 | Routine/Complete Inspection | No Violations Noted | Problems getting Pipe threw Mine . Redrilled hole landed pipe , completed a successful balance job |
1956098 | Primary Facility | 2011-02-23 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLING ON PENNECO PAD, DEPTH 270' TRYING TO GET 95/8"THROUGH THE FLOODED MINE. |
1956101 | Primary Facility | 2011-03-01 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLING ON PENNECO PAD, RAN 270' OF 95/8 BASKET AT 210'. CURRENT DEPTH 1946' |
1956123 | Primary Facility | 2011-03-09 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLING ON PENNECO PAD, RAN 2318' OF 7" CSG. BASKET AT 84'. CURRENT DEPTH 2318' |
1959617 | Primary Facility | 2011-03-16 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
1961057 | Primary Facility | 2011-03-16 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
1967084 | Primary Facility | 2011-04-15 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
1967093 | Primary Facility | 2011-04-15 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
1970652 | Primary Facility | 2011-04-19 | Routine/Complete Inspection | No Violations Noted | WQS MARK MAESTRA CALLED AND TOLD ME THAT THE WELL HEAD IS LEAKING. I TALKED WITH THE WELL TENDER AND HE SAID HE WOULD LET HIS SUPERVISOR KNOW ABOUT THE PROBLEM. |
1971935 | Primary Facility | 2011-04-19 | Routine/Complete Inspection | Pending | Site visit was in coordination with Jason Branan to check on leaking gas well. Leak appeared to have lessened. |
For data sources see[7]