37-129-28481

Well Details

Well ID: 37-129-28481
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 147700
Farm/Lease Name: AIKENS 5G
License Status:
Spud Date:
Permit Date: 2010-12-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.503803
Longitude: -79.560283

For data sources see[1][2][3]

Well History

Date Event
2010-12-13 New Permit Application
2011-03-11 Performed Spud Operation
2011-06-22 Drilling Completion
2011-07-12 Drilling Completion
2012-02-23 Perforation
2014-05-21 DEVIATED
2014-05-21 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-04-03 2012-04-03 7,490 2,730,033

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DWP-944 Calfrac Well Services Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00212000
Polyethylene glycol 25322-68-3 60.00 0.00637000
DAP-901 Calfrac Well Services Scale Inhibitor Organic Phosphonate 30.00 0.00438000
Phosphoric Acid Ammonium Salt 5.00 0.00073000
Oxyalkylated Polyamine 5.00 0.00073000
Amine Salt 5.00 0.00073000
Methanol 67-56-1 30.00 0.00438000
Ammonium chloride 12125-02-9 10.00 0.00146000
DAP-923 Calfrac Well Services Corrosion Inhibitor Fatty Acids 30.00 0.00012000
Polyoxyalkylenes 30.00 0.00012000
Methanol 67-56-1 60.00 0.00023000
Thiourea polymer 68527-49-1 30.00 0.00012000
Propargyl alcohol 107-19-7 10.00 0.00004000
Olefin 5.00 0.00002000
DWP-612 Calfrac Well Services Friction Reduction Long Chain Polyacrylamide 0.06
Acetic Acid Calfrac Well Services Acid
Acetic acid 64-19-7 99.00 0.03
Water Calfrac Well Services Carrier Water 100.00 94.59
Hydrochloric Acid Calfrac Well Services Acid Hydrochloric acid 7647-01-0 3.00 0.76
DWP-690 Calfrac Well Services Friction Reducer Breaker Hydrogen peroxide 7722-84-1 7.00 0.00069000
Sand Calfrac Well Services Proppant Sand 100.00 4.49

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2011 CONSOL GAS CO 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 509,756.00 225 0.00 0 0.00 0
2013 CNX GAS CO LLC 380,285.84 365 0.00 0 0.00 0
2014 CNX GAS CO LLC 257,573.79 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 197,704.46 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 153,886.96 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 132,553.22 363 0.00 0 0.00 0
2018 CNX GAS CO LLC 130,828.64 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 100,892.84 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CNX GAS CO LLC Fracing Fluid Waste 11.02 Bbl LANDFILL 79-00-04
2012 CONSOL GAS CO Produced Fluid 37.50 Bbl INJECTION DISPOSAL WELL PAS2D912BSOM
2012 CNX GAS CO LLC Fracing Fluid Waste 11,825.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CNX GAS CO LLC Produced Fluid 196.56 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012 CNX GAS CO LLC Fracing Fluid Waste 16.72 Bbl LANDFILL CID: 29084
2013 CNX GAS CO LLC Produced Fluid 215.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2013 CNX GAS CO LLC Produced Fluid 100.62 Bbl INJECTION DISPOSAL WELL 34-007-22038
2013 CNX GAS CO LLC Produced Fluid 207.04 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 541.64 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Produced Fluid 202.41 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 CNX GAS CO LLC Produced Fluid 100.62 Bbl INJECTION DISPOSAL WELL 34-119-28776
2014 CNX GAS CO LLC Produced Fluid 10.53 Bbl INJECTION DISPOSAL WELL 34-119-28776
2014 CNX GAS CO LLC Produced Fluid 1,345.20 Bbl INJECTION DISPOSAL WELL 34-013-20609
2014 CNX GAS CO LLC Produced Fluid 16.38 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 CNX GAS CO LLC Produced Fluid 437.43 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Produced Fluid 98.28 Bbl INJECTION DISPOSAL WELL 34-155-23223
2015 CNX GAS CO LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 CNX GAS CO LLC Produced Fluid 517.34 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 188.31 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 303.26 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 118.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC Other Oil & Gas Wastes 112.00 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 57.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 110.00 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Other Oil & Gas Wastes 80.31 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 1,614.84 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Other Oil & Gas Wastes 10.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 419.15 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 105.02 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Produced Fluid 973.69 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 46.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 6,440.46 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 463.72 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 2,561.99 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Other Oil & Gas Wastes 8.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 726.12 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 102.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 70.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 325.59 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 37.54 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 152.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL 34-119-28780
2019 CNX GAS CO LLC Produced Fluid 1,054.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 1.53 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CNX GAS CO LLC Other Oil & Gas Wastes 14.30 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 157.66 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 1,049.93 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1962077 Primary Facility 2011-02-24 Routine/Complete Inspection No Violations Noted Site preparation is underway. Operator is in the process of adding rock to the access road and well pad. Site ID plan and E&S plan located. There are no signs of erosion or sedimentation on the well site or access road. Drilling will begin next week.
1973328 Primary Facility 2011-05-16 Drilling/Alteration No Violations Noted Notified by Operator reps Wendell Shrewsberry and Tom Andreassi of hydraulic oil leak from cement pump during 9 5/8" job. Operator had begun cleanup at time of inspection. Undetermined amount visible at time of inspection. Notified WQS J. Shultz who arrived at location to inspect and follow up with Operator clean up.
2014643 Primary Facility 2011-10-28 Routine/Complete Inspection No Violations Noted Drilling was ongoing on well 129-28474 Aikens 5A. All E&S controls had been installed as outlined in the E&S plan. The disturbed area had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2076899 Primary Facility 2012-06-15 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and stimulated. The Operator indicated that the well was being equipped for production. The associated brine tank and secondary containment appeared to be in sound condition. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
2101720 Primary Facility 2012-09-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks and heating units appear to be in sounds working condition. The Departments notes the Operator was actively working toward restoring the well pad area as outline in the restoration plan. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2128627 Primary Facility 2013-01-04 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2136501 Primary Facility 2013-02-06 Routine/Complete Inspection No Violations Noted no violations noted
2363499 Primary Facility 2015-04-22 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2393145 Primary Facility 2015-07-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2476277 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2491565 Primary Facility 2016-06-09 Routine/Partial Inspection No Violations Noted At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2507873 Primary Facility 2016-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2569457 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2605106 Primary Facility 2017-06-14 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. No E& S issues in relation to site and/or access road.
2619279 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted At time of inspection site ID sign on site. PPC plan, ERP, ESCGP and well permit on site.

No E&S issues observed on access road. Well pad rocked, no E&S issues observed. Well head surrounded by cement barriers. Well tag present. Well appears equipped for production. Brine tank located in secondary containment appears structurally sound.

2637365 Primary Facility 2017-09-18 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. Well site is adjacent to unconventional Utica wells that are in preparation to be fractured.
2680079 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2720541 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
2766467 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well producing.
2773917 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Well producing.
2836722 Primary Facility 2019-02-06 Routine/Complete Inspection No Violations Noted 2/6/19 - Well appears to be in good working condition.
2842345 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Well appears to be in good working condition.
2843360 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Ten brine tanks on site. Six frac tanks located on site.