If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.314711,"lon":-79.166547,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 147958 | |
Farm/Lease Name: CHRISTIANSON 8436H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.314711 | |
Longitude: -79.166547 |
Date | Event |
---|---|
2010-12-09 | New Permit Application |
2011-12-23 | Permit Renewal Application |
2012-05-01 | Performed Spud Operation |
2012-06-16 | Drilling Completion |
2012-09-27 | Perforation |
2013-05-28 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-09-29 | 2012-09-29 | 8,507 | 3,331,977 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | |||||
Other -(non hazardous) | 70.00 | 0.03 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Other -(non hazardous) | 92.50 | 0.43 | |||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.03 | |||||
Water | Water | 7732-18-5 | 100.00 | 86.69 | ||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Glutaraldehyde | 111-30-8 | 60.00 | 0.00390000 | ||
Other -(non hazardous) | 40.00 | 0.00260000 | ||||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | ||||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00067000 | |||||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00007000 | |||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.63 | |||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Other -(non hazardous) | 50.00 | 0.00018000 | |||
100.00 | ||||||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00018000 | |||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.02 | |||
Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 30.00 | 0.02 | ||
Not hazardous | 70.00 | 0.06 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 273,673.00 | 103 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 674,590.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 347,672.00 | 331 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 281,927.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 195,260.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 187,336.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 128,898.92 | 304 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 142,291.76 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 2,423.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 95.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 93.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Drill Cuttings | 1,810.38 Tons | LANDFILL | 100081 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 92.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2012 | XTO ENERGY INC | Produced Fluid | 638.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Drill Cuttings | 50.12 Tons | LANDFILL | 101397 |
2012 | XTO ENERGY INC | Drill Cuttings | 823.44 Tons | LANDFILL | 100434 |
2012 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 92.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 761.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 648.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 648.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 97.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 487.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 184.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 184.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 618.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 270.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 235.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 262.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 336.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Basic Sediment | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2014-04 |
2018 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 318.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 215.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2041261 | Primary Facility | 2012-02-01 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2054509 | Primary Facility | 2012-03-28 | Routine/Complete Inspection | No Violations Noted | No issues noted. |
2064291 | Primary Facility | 2012-05-02 | Routine/Complete Inspection | No Violations Noted | This was a spud inspection. No issues were noted. |
2068940 | Primary Facility | 2012-05-08 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2070099 | Primary Facility | 2012-05-23 | Drilling/Alteration | No Violations Noted | UDI 61 moving onto pad to drill horizontal portion of well. |
2072705 | Primary Facility | 2012-05-29 | Routine/Complete Inspection | No Violations Noted | Union Drilling Rig 61 on site; 20"csg@ 43';13 3/8"@836'; 9 5/8"@ 1564'; pressure testing on 9 5/8" casing; preparing to trip in hole to drill on air to KOP; location being prepped with cover and tank battery placement; E&S controls in place; |
2073274 | Primary Facility | 2012-06-05 | Routine/Complete Inspection | No Violations Noted | UDI Rig 61 drilling at 7179 on water. Bit change; Location in good shape; E&S controls in place; Runoff being pumped out of open containment areas including fuel tank area. |
2073299 | Primary Facility | 2012-06-05 | Routine/Complete Inspection | No Violations Noted | UDI Rig 61 drilling at 7179 feet; Drilling on water; changed out bit; Containment areas including diesel fuel containment being pumped out of water; Location in good shape; E&S controls in place; |
2077988 | Primary Facility | 2012-06-20 | Incident- Response to Accident or Event | Violation(s) Noted | Material Released: Syn-Oil - 470 WO MSDS provided onsite- See Attached; biodegradable |
2080424 | Primary Facility | 2012-07-02 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up on a spill. No issues noted. |
2121204 | Primary Facility | 2012-12-05 | Routine/Complete Inspection | No Violations Noted | 8 residual tanks still on location; containment area in good shape around tanks,seperator, heater; well producing;water in containment is fresh; no sheens; access road in good shape |
2210285 | Primary Facility | 2013-10-04 | Routine/Complete Inspection | No Violations Noted | On 10/04/2013 this single well pad inspection was conducted. |
2211968 | Primary Facility | 2013-07-11 | Compliance Evaluation | No Violations Noted | CEI inspection in response to violations which occurred on 6/20/2012 inspection #2077988 for a base oil spill. The affected area appears to be remediated. The Operator has provided the remediation results with samples results showing the base oil spill has been remediated. At the time of inspection the well appeared to be drilled and equipped for production. The associated brine tank and well apparatus appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appears to be properly implemented and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad area. All perimeter BMPs appear to be installed and functioning properly. The Department suggest the Operator continue to monitor the site after significant weekly and significant precipitation events to ensure site stability is maintained. |
2294252 | Primary Facility | 2014-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The associated brine tank and well apparatus appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appears to be properly implemented and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad area. The Department suggests the Operator continue to monitor the site after weekly and significant precipitation events to ensure site stability is maintained. |
2410698 | Primary Facility | 2015-08-07 | Routine/Complete Inspection | No Violations Noted | 8/7/2015 produced fluids tank diked and separater. |
2410705 | Primary Facility | 2015-09-01 | Routine/Complete Inspection | No Violations Noted | 9/1/2015 produced fluids tank diked and separater. |
2430504 | Primary Facility | 2015-12-03 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appeared to be in sound condition. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road. See inspection # 240500 for NOT inspection conducted on 12/3/2015. |
2461108 | Primary Facility | 2016-03-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2492988 | Primary Facility | 2016-06-10 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2680942 | Primary Facility | 2018-01-10 | Routine/Partial Inspection | No Violations Noted | Routine partial inspection due to snow cover. Well appears to be in production. Well head surrounded by cement barriers and security fence. |
2688610 | Primary Facility | 2018-01-31 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2077988 | 642433 | 06/20/2012 | 2012-06-20 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | |
2077988 | 642434 | 06/20/2012 | 2012-06-20 | 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
642433 | 285266 | NOV - Notice of Violation | Comply/Closed | 2013-07-11 | |||
642434 | 285266 | NOV - Notice of Violation | Comply/Closed | 2013-07-11 |
For data sources see[8]