Well ID: 37-129-28611 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.134686,"lon":-79.364147,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Donegal Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 148650 | |
Farm/Lease Name: KALP 1-9H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-06-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.134686 | |
Longitude: -79.364147 |
Date | Event |
---|---|
2011-06-06 | New Permit Application |
2011-07-11 | Performed Spud Operation |
2011-11-11 | Drilling Completion |
2012-05-22 | Perforation |
2016-01-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-05-26 | 2012-05-26 | 8,309 | 2,768,813 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BE-9M | Halliburton Energy Services | Biocide | Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00500000 | |
Methanol | 67-56-1 | 30.00 | 0.01 | |||||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00400000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | Guar gum | 9000-30-0 | 100.00 | 0.00200000 | ||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.11 | ||
Water | Municipal Authority of Derry Borough | Carrier/Base Fluid | Water | 100.00 | 87.01 | |||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 12.82 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00100000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 84,610.94 | 89 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 166,766.27 | 358 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 115,714.48 | 354 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 83,516.11 | 327 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drill Cuttings | 674.73 Tons | LANDFILL | 100277 |
2011 | XPR RESOURCES LLC | Fracing Fluid Waste | 2,040.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 310.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XPR RESOURCES LLC | Produced Fluid | 320.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Fracing Fluid Waste | 6,330.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Produced Fluid | 8,041.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XPR RESOURCES LLC | Drill Cuttings | 909.17 Tons | LANDFILL | 101571 |
2013 | XPR RESOURCES LLC | Produced Fluid | 4,810.22 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 2,890.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Drilling Fluid Waste | 1,380.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 6,946.19 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 2,626.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Servicing Fluid | 770.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Fracturing Fluid Waste | 20.20 Tons | LANDFILL | 100434 |
2017 | XPR RESOURCES LLC | Other Oil & Gas Wastes | 7.62 Tons | LANDFILL | 100434 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1994393 | Primary Facility | 2011-06-21 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. Road, pad and pits were under construction. |
2012822 | Primary Facility | 2011-10-21 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. Patterson-UTI Rig #480 was on site. Spoke with Joe Ray Company Man on site. |
2014001 | Primary Facility | 2011-10-24 | Drilling/Alteration | No Violations Noted | |
2020762 | Primary Facility | 2011-11-17 | Drilling/Alteration | No Violations Noted | Rig is moving off location; No company rep present to get production casing info |
2020790 | Primary Facility | 2011-11-08 | Drilling/Alteration | No Violations Noted | PATTERSON RIG 480 DRILLING ON WILLIAMS PAD, DEPTH 7386'. 11BBLS CEMENT RETURNS ON THE 8 5/8" CEMENT JOB. |
2026806 | Primary Facility | 2011-12-05 | Drilling/Alteration | No Violations Noted | THERE WAS BUBBLING IN THE CELLLAR, CONTACTED WILLIAMS REP. J. SENSEI TO HAVE IT LOOKED AT. WILLIAMS REP. J. DEWITT FOUND AN OPEN VALVE, CLOSED THE VALVE AND IT QUIT. E&S AND PITS, GOOD |
2034569 | Primary Facility | 2012-01-11 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspectiion. |
2068102 | Primary Facility | 2012-05-16 | Routine/Complete Inspection | No Violations Noted | Site inspection. No issues noted. |
2068534 | Primary Facility | 2012-05-17 | Routine/Complete Inspection | No Violations Noted | Steele Construction was Hydroseeding. No issues noted. |
2072069 | Primary Facility | 2012-05-31 | Routine/Complete Inspection | No Violations Noted | Normal inspection no issues noted. |
2115223 | Primary Facility | 2012-09-18 | Routine/Complete Inspection | No Violations Noted | Observed the impoundment. WPX completely drained the impoundment. |
2115234 | Primary Facility | 2012-09-10 | Routine/Complete Inspection | No Violations Noted | Joint inspection with jason branan. No issues with the impoundment were observed. |
2115295 | Primary Facility | 2012-09-19 | Routine/Complete Inspection | Violation(s) Noted | Inspection of the Kalp Impoundment. Holes were found in the impoundment. |
2115473 | Primary Facility | 2012-09-12 | Routine/Complete Inspection | Pending | Water supply complaint. It appears that the complainants well water is contaminated. |
2115486 | Primary Facility | 2012-09-13 | Routine/Complete Inspection | Pending | Observed seep and sampled seep at the Kalp impoundment. |
2119704 | Primary Facility | 2012-11-29 | Routine/Complete Inspection | No Violations Noted | Checked the Ka;p pad to see if the seep onthe South Western corner was still running. It was still running. |
2130481 | Primary Facility | 2013-01-15 | Routine/Complete Inspection | No Violations Noted | Went to the site on 1/15/13 to determine distances from Brown Water well to to gas well. Aloso got distances from Brown water well to seep and Brown water well to impoundment. |
2136660 | Primary Facility | 2013-02-06 | Follow-up Inspection | No Violations Noted | |
2138093 | Primary Facility | 2013-02-11 | Routine/Complete Inspection | No Violations Noted | Routine inspection. Checking up on the progress on the construction of a divergent ditch being built on the Northen side of the impoundment. |
2154895 | Primary Facility | 2013-04-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Reisnspected site to see if company removed pit liner. Liner was still in place. Water is in the impoundment. |
2160869 | Primary Facility | 2013-04-24 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up inspection to see the status of water removal out of the impoundment. The impoundment was almost drained. The liner will be removed next week. |
2162823 | Primary Facility | 2013-04-30 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Follow up inspection. Company is removing the liner in the impoundment. |
2163421 | Primary Facility | 2013-05-03 | Follow-up Inspection | Pending | Company completely removed impoundment liner. GES statrted sampling soil under the impoundment liner. |
2164944 | Primary Facility | 2013-05-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Reinspected site to see if water in impoundment went down. The water level went up. |
2165803 | Primary Facility | 2013-05-13 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Inspection to check the heidght of the water in the unlined impoundment. Water level is slowely going up. |
2168818 | Primary Facility | 2013-05-23 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Inspection to check on the water level in the impoundment. level of water is the same height. |
2170314 | Primary Facility | 2013-05-30 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Inspection to check the height of the water in the unlined impoundment. Water lvevel is stayin the same height since the last inspection. |
2172586 | Primary Facility | 2013-06-06 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2190191 | Primary Facility | 2013-08-08 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Met on site wih representatives of GES. GES was hired by WPX to conduct a site characterization of the site. GES was installing monitoring wells around the site. |
2194847 | Primary Facility | 2013-08-12 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Met with Dave Schilling with GES and inspected the site. GES is the contractor that will evaluate the extent of the contamination from the release of Frack water flowback into the groundwater. The company had 2 of the eight total monitoring wells developed. The water in the monitoring wells will be anaylsed. |
2198458 | Primary Facility | 2013-08-26 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Drove to the Kalp pad. Called and talked to Randy Reimold with WPX about the ongoing installation of monitoring wells at the Kalp pad. Mr. Reimold said the contactor for WPX is working on the installation of the last two out the eight total monitoring wells.The water in the monitoring wells will be sampled to determine the extent of the contamination. |
2202241 | Primary Facility | 2013-09-05 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Met with Jordan Wilcox with GES and inspected the site. GES is the contractor performing the site characterization around the Kalp impoundment. The company had 8 of the 8 total monitoring wells drilled. During the inspection GES was just starting to push the standing water out the wells with air pressure. Mr Wilcox said the wells need to be blown down for at least an hour . The wells will then be allowed to stabilize.. The water sampling of the wells will be conducted after the wells are blown down. |
2208381 | Primary Facility | 2013-05-07 | Follow-up Inspection | Pending | |
2209161 | Primary Facility | 2013-10-02 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | 10/02/13 Inspection |
2213376 | Primary Facility | 2013-10-17 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Met with Randy Reimold and discussed the site. The eight monitoring wells were sampled but the results are not available. The water level in the impoundment has stabilized since the last inspection. Please see the attached picture. |
2216852 | Primary Facility | 2013-10-28 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Inspected the well pad. The water level in the impoundment has stayed the same. |
2218790 | Primary Facility | 2013-11-04 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | 11/4/13 inspection. |
2236565 | Primary Facility | 2014-01-14 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On 1/15/14 inspected the Kalp impoundment. The height of the water in the impoundment is staying at the same height. See the attached photo. |
2244040 | Primary Facility | 2012-11-14 | Routine/Complete Inspection | No Violations Noted | Routine inspection. Observed the impoundment on site. Full of rain water. Seep from impoundment observed. This inspection ID replaces 2115598. |
2244048 | Primary Facility | 2011-12-05 | Routine/Complete Inspection | No Violations Noted | Entered on behalf of Marc C. Maestra by A. Sluss on 2/10/2014. |
2245374 | Primary Facility | 2013-07-11 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | Entered for F. Calderon. No paper inspection report. |
2263391 | Primary Facility | 2014-04-17 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2263574 | Primary Facility | 2014-04-18 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | 4/18/14 inspection |
2265886 | Primary Facility | 2014-04-24 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt. |
2278368 | Primary Facility | 2014-05-29 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation activities of former impoundment. |
2278966 | Primary Facility | 2014-06-17 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | |
2283297 | Primary Facility | 2014-06-25 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation activities of former impoundment. |
2285924 | Primary Facility | 2014-07-09 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation activities of former impoundment. |
2288833 | Primary Facility | 2014-07-22 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2293480 | Primary Facility | 2014-07-30 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2295860 | Primary Facility | 2014-08-12 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2297003 | Primary Facility | 2014-08-19 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | No paper inspection report |
2299393 | Primary Facility | 2014-08-22 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2300924 | Primary Facility | 2014-08-28 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2301674 | Primary Facility | 2014-09-04 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2308505 | Primary Facility | 2014-09-24 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2315047 | Primary Facility | 2014-10-23 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2325510 | Primary Facility | 2014-12-02 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2327104 | Primary Facility | 2014-12-05 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | |
2362777 | Primary Facility | 2015-04-08 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspt to monitor ongoing reclamation of former impoundment. |
2397361 | Primary Facility | 2015-07-30 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspection to monitor ongoing reclamation of former impoundment. |
2399272 | Primary Facility | 2015-08-06 | Administrative/File Review | Outstanding Violations - No Viols Req'd | Admin inspection conducted as a follow-up to inspection record 2397361. |
2408009 | Primary Facility | 2015-09-09 | Routine/Partial Inspection | Outstanding Violations - No Viols Req'd | RTPT inspection to monitor ongoing reclamation of former impoundment. |
2438911 | Primary Facility | 2015-12-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well. Removed production tree and set BOP. CIBP was set at 7500 feet. On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet. Pulled casing to first collar and removed casing of 27 joints. |
2438935 | Primary Facility | 2015-12-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS). On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement. |
2588268 | Primary Facility | 2017-04-20 | Routine/Partial Inspection | Pending | RTPT inspection to monitor ongoing reclamation of former impoundment.
At time of inspection, area of former impoundment appears to have been recently re-graded to what appears to have been pre-existing contours, not yet temporarily stabilized. Department recommends the Operator temporarily stabilize the area of the former impoundment where a cessation of earth disturbance activities will exceed 4 days in order to prevent any potential pollution events from occurring and to promote vegetative growth for final permanent stabilization. Pictures taken (See Attached). Outstanding violations exist. |
2618406 | Primary Facility | 2017-07-12 | Routine/Partial Inspection | In Compliance with Schedule | RTPT to monitor ongoing reclamation of former impoundment.
At time of inspection, area of former impoundment is nearing 70% uniform and adequate vegetative growth and is temporarily stabilized. |
2632564 | Primary Facility | 2017-09-01 | Routine/Partial Inspection | In Compliance with Schedule | RTPT to monitor ongoing reclamation of former impoundment.
At time of inspection, area of former impoundment appears to be exhibiting greater than 70% uniform and adequate vegetative growth. |
2657707 | Primary Facility | 2017-10-27 | Administrative/File Review | In Compliance with Policy | Admin inspection conducted in response to a well site restoration report submitted by operator dated 7-29-17.
This well site restoration report was returned for being administratively incomplete as an exact date was not provided for Date of Final Well Plugged. During the Department's previous site inspection (2642442) on 10/02/27, the well site was not yet restored. The regulations provide that a well site restoration report shall be submitted to the Department within 60 days after post-plugging restoration. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2115295 | 653559 | 09/19/2012 | 2012-09-19 | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | Administrative | |
2245374 | 688833 | 07/11/2013 | 2013-07-11 | 208A - Failure to restore a water supply affected by pollution or diminution | Environmental Health & Safety | |
2278966 | 698296 | 06/17/2014 | 2014-06-17 | OGA 3218(A) - Failure to restore or replace a public or private water supply affected by a well operator. | Environmental Health & Safety | |
2297003 | 703144 | 08/19/2014 | 2014-08-19 | OGA3218(A) - PROTECTION OF WATER SUPPLIES - GENERAL RULE - Failure to restore or replace a public or private water supply affected by a well operator. | Environmental Health & Safety | |
2327104 | 711893 | 12/05/2014 | 2014-12-05 | OGA 3218(A) - Failure to restore or replace a public or private water supply affected by a well operator. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
653559 | 290493 | NOV - Notice of Violation | |||||
653559 | 350504 | COA - Consent Order and Agreement | $1,200,000.00 | $1,200,000.00 | |||
688833 | 307604 | ADORD - Administrative Order | |||||
698296 | 312178 | ADORD - Administrative Order | |||||
698296 | 369206 | ADORD - Administrative Order | Comply/Closed | 2019-05-30 | |||
698296 | 373135 | ADORD - Administrative Order | |||||
703144 | 314381 | ADORD - Administrative Order | Comply/Closed | 2019-05-30 | |||
711893 | 318187 | ADORD - Administrative Order |
For data sources see[8]