37-129-28611

Well Details

Well ID: 37-129-28611
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 148650
Farm/Lease Name: KALP 1-9H
License Status:
Spud Date:
Permit Date: 2011-06-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.134686
Longitude: -79.364147

For data sources see[1][2][3]

Well History

Date Event
2011-06-06 New Permit Application
2011-07-11 Performed Spud Operation
2011-11-11 Drilling Completion
2012-05-22 Perforation
2016-01-15 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-05-26 2012-05-26 8,309 2,768,813

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BE-9M Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00500000
Methanol 67-56-1 30.00 0.01
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00400000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
WG-36 Gelling Agent Halliburton Energy Services Gel Guar gum 9000-30-0 100.00 0.00200000
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.11
Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 87.01
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 12.82
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00100000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 84,610.94 89 0.00 0 0.00 0
2013 XPR RESOURCES LLC 166,766.27 358 0.00 0 0.00 0
2014 XPR RESOURCES LLC 115,714.48 354 0.00 0 0.00 0
2015 XPR RESOURCES LLC 83,516.11 327 0.00 0 0.00 0
2016 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Drill Cuttings 674.73 Tons LANDFILL 100277
2011 XPR RESOURCES LLC Fracing Fluid Waste 2,040.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XPR RESOURCES LLC Drilling Fluid Waste 310.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 XPR RESOURCES LLC Produced Fluid 320.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Fracing Fluid Waste 6,330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Produced Fluid 8,041.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XPR RESOURCES LLC Drill Cuttings 909.17 Tons LANDFILL 101571
2013 XPR RESOURCES LLC Produced Fluid 4,810.22 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 2,890.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Drilling Fluid Waste 1,380.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 6,946.19 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Produced Fluid 2,626.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Servicing Fluid 770.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Fracturing Fluid Waste 20.20 Tons LANDFILL 100434
2017 XPR RESOURCES LLC Other Oil & Gas Wastes 7.62 Tons LANDFILL 100434

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994393 Primary Facility 2011-06-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Road, pad and pits were under construction.
2012822 Primary Facility 2011-10-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Patterson-UTI Rig #480 was on site. Spoke with Joe Ray Company Man on site.
2014001 Primary Facility 2011-10-24 Drilling/Alteration No Violations Noted
2020762 Primary Facility 2011-11-17 Drilling/Alteration No Violations Noted Rig is moving off location; No company rep present to get production casing info
2020790 Primary Facility 2011-11-08 Drilling/Alteration No Violations Noted PATTERSON RIG 480 DRILLING ON WILLIAMS PAD, DEPTH 7386'. 11BBLS CEMENT RETURNS ON THE 8 5/8" CEMENT JOB.
2026806 Primary Facility 2011-12-05 Drilling/Alteration No Violations Noted THERE WAS BUBBLING IN THE CELLLAR, CONTACTED WILLIAMS REP. J. SENSEI TO HAVE IT LOOKED AT. WILLIAMS REP. J. DEWITT FOUND AN OPEN VALVE, CLOSED THE VALVE AND IT QUIT. E&S AND PITS, GOOD
2034569 Primary Facility 2012-01-11 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspectiion.
2068102 Primary Facility 2012-05-16 Routine/Complete Inspection No Violations Noted Site inspection. No issues noted.
2068534 Primary Facility 2012-05-17 Routine/Complete Inspection No Violations Noted Steele Construction was Hydroseeding. No issues noted.
2072069 Primary Facility 2012-05-31 Routine/Complete Inspection No Violations Noted Normal inspection no issues noted.
2115223 Primary Facility 2012-09-18 Routine/Complete Inspection No Violations Noted Observed the impoundment. WPX completely drained the impoundment.
2115234 Primary Facility 2012-09-10 Routine/Complete Inspection No Violations Noted Joint inspection with jason branan. No issues with the impoundment were observed.
2115295 Primary Facility 2012-09-19 Routine/Complete Inspection Violation(s) Noted Inspection of the Kalp Impoundment. Holes were found in the impoundment.
2115473 Primary Facility 2012-09-12 Routine/Complete Inspection Pending Water supply complaint. It appears that the complainants well water is contaminated.
2115486 Primary Facility 2012-09-13 Routine/Complete Inspection Pending Observed seep and sampled seep at the Kalp impoundment.
2119704 Primary Facility 2012-11-29 Routine/Complete Inspection No Violations Noted Checked the Ka;p pad to see if the seep onthe South Western corner was still running. It was still running.
2130481 Primary Facility 2013-01-15 Routine/Complete Inspection No Violations Noted Went to the site on 1/15/13 to determine distances from Brown Water well to to gas well. Aloso got distances from Brown water well to seep and Brown water well to impoundment.
2136660 Primary Facility 2013-02-06 Follow-up Inspection No Violations Noted
2138093 Primary Facility 2013-02-11 Routine/Complete Inspection No Violations Noted Routine inspection. Checking up on the progress on the construction of a divergent ditch being built on the Northen side of the impoundment.
2154895 Primary Facility 2013-04-09 Follow-up Inspection Outstanding Violations - No Viols Req'd Reisnspected site to see if company removed pit liner. Liner was still in place. Water is in the impoundment.
2160869 Primary Facility 2013-04-24 Follow-up Inspection Outstanding Violations - No Viols Req'd Follow up inspection to see the status of water removal out of the impoundment. The impoundment was almost drained. The liner will be removed next week.
2162823 Primary Facility 2013-04-30 Follow-up Inspection Outstanding Violations - No Viols Req'd Follow up inspection. Company is removing the liner in the impoundment.
2163421 Primary Facility 2013-05-03 Follow-up Inspection Pending Company completely removed impoundment liner. GES statrted sampling soil under the impoundment liner.
2164944 Primary Facility 2013-05-09 Follow-up Inspection Outstanding Violations - No Viols Req'd Reinspected site to see if water in impoundment went down. The water level went up.
2165803 Primary Facility 2013-05-13 Follow-up Inspection Outstanding Violations - No Viols Req'd Inspection to check the heidght of the water in the unlined impoundment. Water level is slowely going up.
2168818 Primary Facility 2013-05-23 Follow-up Inspection Outstanding Violations - No Viols Req'd Inspection to check on the water level in the impoundment. level of water is the same height.
2170314 Primary Facility 2013-05-30 Follow-up Inspection Outstanding Violations - No Viols Req'd Inspection to check the height of the water in the unlined impoundment. Water lvevel is stayin the same height since the last inspection.
2172586 Primary Facility 2013-06-06 Follow-up Inspection Outstanding Violations - No Viols Req'd
2190191 Primary Facility 2013-08-08 Follow-up Inspection Outstanding Violations - No Viols Req'd Met on site wih representatives of GES. GES was hired by WPX to conduct a site characterization of the site. GES was installing monitoring wells around the site.
2194847 Primary Facility 2013-08-12 Follow-up Inspection Outstanding Violations - No Viols Req'd Met with Dave Schilling with GES and inspected the site. GES is the contractor that will evaluate the extent of the contamination from the release of Frack water flowback into the groundwater. The company had 2 of the eight total monitoring wells developed. The water in the monitoring wells will be anaylsed.
2198458 Primary Facility 2013-08-26 Follow-up Inspection Outstanding Violations - No Viols Req'd Drove to the Kalp pad. Called and talked to Randy Reimold with WPX about the ongoing installation of monitoring wells at the Kalp pad. Mr. Reimold said the contactor for WPX is working on the installation of the last two out the eight total monitoring wells.The water in the monitoring wells will be sampled to determine the extent of the contamination.
2202241 Primary Facility 2013-09-05 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Met with Jordan Wilcox with GES and inspected the site. GES is the contractor performing the site characterization around the Kalp impoundment. The company had 8 of the 8 total monitoring wells drilled. During the inspection GES was just starting to push the standing water out the wells with air pressure. Mr Wilcox said the wells need to be blown down for at least an hour . The wells will then be allowed to stabilize.. The water sampling of the wells will be conducted after the wells are blown down.
2208381 Primary Facility 2013-05-07 Follow-up Inspection Pending
2209161 Primary Facility 2013-10-02 Follow-up Inspection Outstanding Violations - No Viols Req'd 10/02/13 Inspection
2213376 Primary Facility 2013-10-17 Follow-up Inspection Outstanding Violations - No Viols Req'd Met with Randy Reimold and discussed the site. The eight monitoring wells were sampled but the results are not available. The water level in the impoundment has stabilized since the last inspection. Please see the attached picture.
2216852 Primary Facility 2013-10-28 Follow-up Inspection Outstanding Violations - No Viols Req'd Inspected the well pad. The water level in the impoundment has stayed the same.
2218790 Primary Facility 2013-11-04 Follow-up Inspection Outstanding Violations - No Viols Req'd 11/4/13 inspection.
2236565 Primary Facility 2014-01-14 Follow-up Inspection Outstanding Violations - No Viols Req'd On 1/15/14 inspected the Kalp impoundment. The height of the water in the impoundment is staying at the same height. See the attached photo.
2244040 Primary Facility 2012-11-14 Routine/Complete Inspection No Violations Noted Routine inspection. Observed the impoundment on site. Full of rain water. Seep from impoundment observed. This inspection ID replaces 2115598.
2244048 Primary Facility 2011-12-05 Routine/Complete Inspection No Violations Noted Entered on behalf of Marc C. Maestra by A. Sluss on 2/10/2014.
2245374 Primary Facility 2013-07-11 Administrative/File Review Viol(s) Noted & Immediately Corrected Entered for F. Calderon. No paper inspection report.
2263391 Primary Facility 2014-04-17 Follow-up Inspection Outstanding Violations - No Viols Req'd
2263574 Primary Facility 2014-04-18 Follow-up Inspection Outstanding Violations - No Viols Req'd 4/18/14 inspection
2265886 Primary Facility 2014-04-24 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt.
2278368 Primary Facility 2014-05-29 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation activities of former impoundment.
2278966 Primary Facility 2014-06-17 Administrative/File Review Viol(s) Noted & Immediately Corrected
2283297 Primary Facility 2014-06-25 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation activities of former impoundment.
2285924 Primary Facility 2014-07-09 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation activities of former impoundment.
2288833 Primary Facility 2014-07-22 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2293480 Primary Facility 2014-07-30 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2295860 Primary Facility 2014-08-12 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2297003 Primary Facility 2014-08-19 Administrative/File Review Viol(s) Noted & Immediately Corrected No paper inspection report
2299393 Primary Facility 2014-08-22 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2300924 Primary Facility 2014-08-28 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2301674 Primary Facility 2014-09-04 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2308505 Primary Facility 2014-09-24 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2315047 Primary Facility 2014-10-23 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2325510 Primary Facility 2014-12-02 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2327104 Primary Facility 2014-12-05 Administrative/File Review Viol(s) Noted & Immediately Corrected
2362777 Primary Facility 2015-04-08 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspt to monitor ongoing reclamation of former impoundment.
2397361 Primary Facility 2015-07-30 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspection to monitor ongoing reclamation of former impoundment.
2399272 Primary Facility 2015-08-06 Administrative/File Review Outstanding Violations - No Viols Req'd Admin inspection conducted as a follow-up to inspection record 2397361.
2408009 Primary Facility 2015-09-09 Routine/Partial Inspection Outstanding Violations - No Viols Req'd RTPT inspection to monitor ongoing reclamation of former impoundment.
2438911 Primary Facility 2015-12-15 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well. Removed production tree and set BOP. CIBP was set at 7500 feet. On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet. Pulled casing to first collar and removed casing of 27 joints.
2438935 Primary Facility 2015-12-17 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS). On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement.
2588268 Primary Facility 2017-04-20 Routine/Partial Inspection Pending RTPT inspection to monitor ongoing reclamation of former impoundment.

At time of inspection, area of former impoundment appears to have been recently re-graded to what appears to have been pre-existing contours, not yet temporarily stabilized.

Department recommends the Operator temporarily stabilize the area of the former impoundment where a cessation of earth disturbance activities will exceed 4 days in order to prevent any potential pollution events from occurring and to promote vegetative growth for final permanent stabilization. Pictures taken (See Attached).

Outstanding violations exist.

2618406 Primary Facility 2017-07-12 Routine/Partial Inspection In Compliance with Schedule RTPT to monitor ongoing reclamation of former impoundment.

At time of inspection, area of former impoundment is nearing 70% uniform and adequate vegetative growth and is temporarily stabilized.

2632564 Primary Facility 2017-09-01 Routine/Partial Inspection In Compliance with Schedule RTPT to monitor ongoing reclamation of former impoundment.

At time of inspection, area of former impoundment appears to be exhibiting greater than 70% uniform and adequate vegetative growth.

2657707 Primary Facility 2017-10-27 Administrative/File Review In Compliance with Policy Admin inspection conducted in response to a well site restoration report submitted by operator dated 7-29-17.

This well site restoration report was returned for being administratively incomplete as an exact date was not provided for Date of Final Well Plugged.

During the Department's previous site inspection (2642442) on 10/02/27, the well site was not yet restored. The regulations provide that a well site restoration report shall be submitted to the Department within 60 days after post-plugging restoration.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2115295 653559 09/19/2012 2012-09-19 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. Administrative
2245374 688833 07/11/2013 2013-07-11 208A - Failure to restore a water supply affected by pollution or diminution Environmental Health & Safety
2278966 698296 06/17/2014 2014-06-17 OGA 3218(A) - Failure to restore or replace a public or private water supply affected by a well operator. Environmental Health & Safety
2297003 703144 08/19/2014 2014-08-19 OGA3218(A) - PROTECTION OF WATER SUPPLIES - GENERAL RULE - Failure to restore or replace a public or private water supply affected by a well operator. Environmental Health & Safety
2327104 711893 12/05/2014 2014-12-05 OGA 3218(A) - Failure to restore or replace a public or private water supply affected by a well operator. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
653559 290493 NOV - Notice of Violation
653559 350504 COA - Consent Order and Agreement $1,200,000.00 $1,200,000.00
688833 307604 ADORD - Administrative Order
698296 312178 ADORD - Administrative Order
698296 369206 ADORD - Administrative Order Comply/Closed 2019-05-30
698296 373135 ADORD - Administrative Order
703144 314381 ADORD - Administrative Order Comply/Closed 2019-05-30
711893 318187 ADORD - Administrative Order