If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28616 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.663111,"lon":-79.640761,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Allegheny Township | |
Operator Name: SHELLY OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: THOR 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.663111 | |
Longitude: -79.640761 |
Date | Event |
---|---|
2011-07-13 | New Permit Application |
2011-07-13 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | SHELLY OIL & GAS INC | 282.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2012 | SHELLY OIL & GAS INC | 3,294.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | SHELLY OIL & GAS INC | 3,013.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | SHELLY OIL & GAS INC | 2,942.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | SHELLY OIL & GAS INC | 2,584.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | SHELLY OIL & GAS INC | 951.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | SHELLY OIL & GAS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SHELLY OIL & GAS INC | 1,127.00 | 300 | 0.00 | 0 | 0.00 | 0 |
2019 | SHELLY OIL & GAS INC | 1,631.00 | 275 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2003626 | Primary Facility | 2011-09-14 | Routine/Complete Inspection | No Violations Noted | Drill rig located onsite drilling did not appear to be ongoing at the time of the inspection. Universal Cement crew onsite. Drill pit contained minimal fluids and drill cuttings. Drill pit had more than the required two feet of lined freeboard. E&S controls had been implemented on the access road and site as outlined in the E&S plan. These controls should be monitored and maintained as neccesary until well development activities are completed. |
2010395 | Primary Facility | 2011-10-07 | Drilling/Alteration | No Violations Noted | Well shut in on 4 1/2" x 2" swage. Pit lined and freeboard maintained. |
2036537 | Primary Facility | 2012-01-04 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | |
2047776 | Primary Facility | 2012-03-05 | Routine/Complete Inspection | No Violations Noted | Drilling was completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. SIte had been regraded, seeded & mulched. The operator should monitor the site to insure it attains 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2383701 | Primary Facility | 2015-06-25 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and permanently affixed to wellhead. Site permanently stabilized. No E&S issues in relation to site and/or access road. Brine tank located on site appears structurally sound. |
2489767 | Primary Facility | 2016-06-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally sound. No E&S issues in relation to site and/or access road. |
2638368 | Primary Facility | 2017-09-21 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears to be structurally sound. No E&S issues. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2036537 | 630220 | 01/04/2012 | 2012-01-04 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
630220 | 279743 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-01-24 | 2012-01-24 | $500.00 | $500.00 |
For data sources see[6]