Well ID: 37-129-28655
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Bell Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 145326
Farm/Lease Name: KUHNS 3A
License Status:
Spud Date:
Permit Date: 2011-08-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.508006
Longitude: -79.545961

For data sources see[1][2][3]

Well History

Date Event
2011-08-12 New Permit Application
2012-04-13 Performed Spud Operation
2012-08-15 Drilling Completion
2013-04-25 Perforation
2014-03-24 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-03 2013-06-15 7,549 6,245,780 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
and (Proppant), DAP-903, DWP-111,
DWP-614, DWP-901, BioClear
2000, DWP-NE1, Spearhead Acid, Acetic A
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations, Acid, Crystalline silica (Quartz) 14808-60-7 100 11.2778 6,652,710.0
Isopropanol 67-63-0 40 0.0057 3365.69
Modified thiourea polymer 68527-49-1 0.1 0.0008 475.09
Propargyl Alcohol 107-19-7 0.1 0.0003 158.36
Methanol 67-56-1 15 0.0038 2212.31
Formaldehyde 50-00-0 0.1 0.0001 31.67
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.0003 185.78
Ammonium Persulfate 7727-54-0 100 0.002 1167.6
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.034 20078.2
Alkenes, C>10 a- 64743-02-8 0.1 0.0008 475.09
Calcite 471-34-1 1 0.0207 12222.1
Sodium chloride 7647-14-5 0.1 0 15.84
Illite 12173-60-3 1 0.0039 2307.31
Apatite 64476-38-6 0.1 0.0024 1436.56
Polyethylene Glycol Mixture 25322-68-3 70 0.0054 3183.84
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.0008 475.09
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 40 0.0054 3183.84
Fatty acids, tall-oil 61790-12-3 0.1 0.0008 475.09
Hydrochloric acid 7647-01-0 35 0.1879 110853
Diallyldimethylammonium chloride 7398-69-8 5 0.0007 420.71
Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.0036 2107.81
Ilmenite 98072-94-7 0.1 0.0014 854.56
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.0286 16862.5
Goethite 1310-14-1 0.1 0.0044 2600.57
Biotite 1302-27-8 0.1 0.0024 1436.56
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.0067 3966.35
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.001 619.28
Guar gum 9000-30-0 60 0.0126 7431.37
Acetic acid 64-19-7 100 0.0248 14648.7
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.0057 3365.69
Water, Customer & CWS Base Fluid & Mix Water, Water 7732-18-5 100 88.3514 52,118,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2013 CNX GAS CO LLC 605,412.74 184 0.00 0 0.00 0
2014 CNX GAS CO LLC 635,411.00 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 425,493.43 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 298,325.59 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 251,999.45 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 257,106.14 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 206,451.32 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CNX GAS CO LLC Drilling Fluid Waste 870.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CNX GAS CO LLC Drill Cuttings 802.21 Tons LANDFILL 100434
2013 CNX GAS CO LLC Produced Fluid 12,408.45 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 351.55 Bbl INJECTION DISPOSAL WELL 34-155-23732
2013 CNX GAS CO LLC Drill Cuttings 173.15 Tons LANDFILL 100434
2013 CNX GAS CO LLC Produced Fluid 483.16 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 CNX GAS CO LLC Produced Fluid 1,468.15 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Fracing Fluid Waste 110.27 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 CNX GAS CO LLC Produced Fluid 305.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2013 CNX GAS CO LLC Produced Fluid 2,247.11 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Drill Cuttings 279.31 Tons LANDFILL 301071
2013 CNX GAS CO LLC Fracing Fluid Waste 8,715.39 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 422.37 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 CNX GAS CO LLC Drill Cuttings 149.82 Tons LANDFILL 100280
2013 CNX GAS CO LLC Produced Fluid 148.59 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 CNX GAS CO LLC Produced Fluid 310.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2013 CNX GAS CO LLC Servicing Fluid 3.81 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 CNX GAS CO LLC Produced Fluid 72.54 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 CNX GAS CO LLC Produced Fluid 6,340.44 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Produced Fluid 768.03 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 CNX GAS CO LLC Produced Fluid 214.11 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 CNX GAS CO LLC Produced Fluid 124.57 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 CNX GAS CO LLC Produced Fluid 114.66 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 CNX GAS CO LLC Produced Fluid 234.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2015 CNX GAS CO LLC Produced Fluid 606.99 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 476.19 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 CNX GAS CO LLC Produced Fluid 242.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2015 CNX GAS CO LLC Produced Fluid 3,963.27 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 2,852.28 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 200.70 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 301.90 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 110.00 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 690.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 117.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 124.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 231.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Produced Fluid 247.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 799.33 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 19.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Produced Fluid 262.85 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 1.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Produced Fluid 250.43 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Other Oil & Gas Wastes 22.80 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 24.00 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Other Oil & Gas Wastes 2.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 47.26 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 1,387.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 421.78 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 303.93 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 91.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 785.21 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 191.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 138.26 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 100.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 332.40 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2059485 Primary Facility 2012-04-16 Routine/Complete Inspection No Violations Noted Inspection in response to a SPUD notice received of Thursday April 12 2012. At the time of inspection the site was being constructed. The E&S plan was on site and was properly implemented. The site was temporary stabilized as outlined in the E&S Plan. The Department notes an unlined pit onsite at the time of inspection. No accelerated erosion observed in relation to the access road or well pad area at the time of the inspection.
2068974 Primary Facility 2012-05-14 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2086647 Primary Facility 2012-07-23 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI Supervisor D. Stivanson.
2086648 Primary Facility 2012-07-26 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2086920 Primary Facility 2012-07-23 Routine/Complete Inspection No Violations Noted At the time of inspection the well had not been drilled. The site appeared to be in sound condition. No accelerated or sedimentation observed in relation to the well pad or access road. The site has been temporarily stabilized and all BMP's appear to be properly installed and maintained. THE Department suggest the Operator continue to monitor the site on a weekly basis and after precipitation event to ensure E&S in not leaving the site.
2089849 Primary Facility 2012-08-03 Routine/Complete Inspection No Violations Noted Due to lost cement circulation and inadvertent returns in last well on 20” casing, the following work was done to prep the hole for this particular location:
2092776 Primary Facility 2012-08-06 Drilling/Alteration No Violations Noted 20” casing ran and cemented during inspection. No inadvertent returns for the duration of the cement job inspection. Closed loop system being utilized. Pit lined and freeboard maintained.
2092856 Primary Facility 2012-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled but not equipped for production. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2097838 Primary Facility 2012-09-05 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained.
2127552 Primary Facility 2013-01-03 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled but not equipped for production. The well pad appeared to be in sound condition. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2134655 Primary Facility 2013-01-25 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano.
2138179 Primary Facility 2013-02-11 Routine/Complete Inspection No Violations Noted no violations noted
2145944 Primary Facility 2013-02-28 Drilling/Alteration No Violations Noted Waiting on frac. Pit lined and freeboard maintained.
2147740 Primary Facility 2013-03-12 Routine/Complete Inspection No Violations Noted no violations
2147818 Primary Facility 2013-03-12 Drilling/Alteration No Violations Noted Waiting on frac. Pit lined and freeboard maintained.
2151216 Primary Facility 2013-03-26 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated the well was drilled to total depth. The well pad appeared to be in sound condition with secondary containment underneath the drill rig. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2160373 Primary Facility 2013-04-22 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled however not stimulated or equipped for production. During the inspection the Department notes that the Operator has started to prepare the site for stimulation. The Operator was in the process of excavating an area adjacent to the pad to store the Rock Water above ground storage container. The erosions and sedimentation plan was onsite and all associated BMPs appear to installed and functioning as outline in the plan. No accelerated erosion or sedimentation observed. The pit located onsite appeared to in sound condition and had the required 2 feet of free board. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2166674 Primary Facility 2013-05-15 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and the Operator was in the final stages of the stimulation set up process. Stimulation notice received by the Department on 5/11/2013 set for 5/16/2013. The Department notes that a 1 million gallon above ground freshwater containment vessel was installed and being filled at the time of inspection. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2171429 Primary Facility 2013-06-03 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and the Operator was in the process of stimulation. No observation of accelerated erosion or sedimentation in relation the well pad or access road. The E&S plan was onsite and all associated BMPs appear to be installed and properly maintained. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.Refer to inspection # 2171660 for violations issued on 6/3/2013 for release during completions operations.
2185900 Primary Facility 2013-07-24 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and stimulated and the Operator was in the process of equipping the well for production. The Department notes that the Operator has installed the previously approved Rock Water flow back tank. The Department notes that the flow back tank appears to be in sound condition and is placed within containment. No observation of accelerated erosion or sedimentation in relation the well pad or access road. The E&S plan was onsite and all associated BMPs appear to be installed and properly maintained. The Department suggests the operator continue to monitor the site weekly and after precipitation events to ensure the stability of the site is retained.
2199828 Primary Facility 2013-08-29 Incident- Response to Accident or Event No Violations Noted Inspection the result of the Operator reporting a pit overrun and possible BMP failures due to an extreme rain fall event on 8.28.2013. During the inspection the Operator indicated and the Department recognized that the pit that over ran was a lined emergency pit located adjacent to the Kuhns Well pad. The pit was never used to hold any pollutional substances at any point prior to the extreme precipitation event. Also during the inspection the Department inspected the BMPs associated with the adjacent pipeline and well site. The BMPs installed by the Operator appeared to function properly, this fact coupled with the vegetative coverage achieved on the fill side of the well site and the pipeline right of way appeared to limit accelerated erosion and sedimentation. The Department suggest the Operator submit metrological data supporting the extreme rainfall claimed and weekly site inspection report from 7.28.2013 until the event on 8.28.2013.
2240335 Primary Facility 2013-01-28 Routine/Complete Inspection No Violations Noted At the time of inspection the well appear to be drilled and in production. Update to inspection #2199828, the pending violations from 8/29/2013 have been removed.. See attachments for rainfall data and sample results.
2281844 Primary Facility 2014-06-24 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2358471 Primary Facility 2015-04-07 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2476209 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2521548 Primary Facility 2016-09-21 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2576104 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2622362 Primary Facility 2017-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2738493 Primary Facility 2018-06-07 Routine/Complete Inspection No Violations Noted 6-7-18 Well producing.
2843845 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]