If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28672 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.37665,"lon":-79.280369,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 145142 | |
Farm/Lease Name: DURALIA 1-6H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-09-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.376650 | |
Longitude: -79.280369 |
Date | Event |
---|---|
2011-09-12 | New Permit Application |
2011-11-08 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-21 | 2013-08-24 | 8,353 | 3,616,220 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID 10-30% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 30 | 0.0311873 | 10764 |
Other Ingredient(s) | Organic phosphonate | Confidential | 0 | 0.0274725 | 9482 | |||
Sodium sulfate | 7757-82-6 | 0 | 0.00000004 | 1 | ||||
Silica gel | 112926-00-8 | 0 | 0.00001420 | 5 | ||||
Bentonite, benzyl(hydrogenated tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 0 | 0.00007099 | 25 | ||||
Formaldehyde | 50-00-0 | 0 | 0.000457875 | 159 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 0 | 0.00511294 | 1765 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.00102259 | 353 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.000193226 | 67 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0306776 | 10589 | ||||
Olefins | Confidential | 0 | 0.00003220 | 12 | ||||
Water | 7732-18-5 | 0 | 0.786292 | 271381 | ||||
Olefins | Confidential | 0 | 0.00000644 | 3 | ||||
Surfactant mixture | Confidential | 0 | 0.00001420 | 5 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00511294 | 1765 | ||||
Crystalline Silica, Quartz | 14808-60-7 | 0 | 0.00000142 | 1 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.00102259 | 353 | ||||
Fatty acid tall oil amide | Confidential | 0 | 0.00511294 | 1765 | ||||
Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.000193226 | 67 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.00511294 | 1765 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.000193226 | 67 | ||||
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0306776 | 10589 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 10 | 0.00006441 | 23 | |
Methanol | 67-56-1 | 60 | 0.000386453 | 134 | ||||
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00421364 | 1455 | |
HYDROCHLORIC ACID 5-10% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 10 | 0.055137 | 19030 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 87.3826 | 30,159,200.0 | |
40/70 Mesh White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 9.54775 | 3,295,300.0 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.00141972 | 490 | |
SP BREAKER | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 100 | 0.00004346 | 15 | |
LP-65 | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.00457875 | 1581 | |
100 Mesh White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 2.222 | 766900 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 235,958.97 | 92 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 470,265.45 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 208,399.04 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 140,873.17 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 89,436.64 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 59,633.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 47,254.00 | 357 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drill Cuttings | 2,707.35 Tons | LANDFILL | 100277 |
2011 | XPR RESOURCES LLC | Drilling Fluid Waste | 1,200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Fracing Fluid Waste | 5,548.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2013 | XPR RESOURCES LLC | Produced Fluid | 6,537.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 3,970.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 1,128.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 66.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 755.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 721.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 125.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 689.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XPR RESOURCES LLC | Produced Fluid | 245.71 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 435.70 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 109.29 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | XPR RESOURCES LLC | Produced Fluid | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2013962 | Primary Facility | 2011-10-26 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2019646 | Primary Facility | 2011-11-16 | Routine/Complete Inspection | No Violations Noted | Fred Webb and Jimmy Ballew were the company men on site. AP was tool pusher for HP. |
2026854 | Primary Facility | 2011-12-14 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2140625 | Primary Facility | 2013-02-19 | Routine/Complete Inspection | No Violations Noted | no violations noted |
2145817 | Primary Facility | 2013-02-28 | Routine/Complete Inspection | No Violations Noted | |
2149802 | Primary Facility | 2013-03-13 | Routine/Complete Inspection | No Violations Noted | WGM getting ready to lay down containment. |
2151669 | Primary Facility | 2013-03-27 | Routine/Complete Inspection | No Violations Noted | 3/26/2013 Moving rig onto location. |
2161065 | Primary Facility | 2013-04-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Department notes that the well appears to be drilled but not equipped for production. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2162326 | Primary Facility | 2013-04-02 | Drilling/Alteration | No Violations Noted | 4/2/2013 drilling on the 1-8H. |
2164829 | Primary Facility | 2013-04-16 | Routine/Complete Inspection | No Violations Noted | 4/16/2013 drilling on the 8-H. |
2167550 | Primary Facility | 2013-05-07 | Drilling/Alteration | No Violations Noted | 5/7/2013 Orion rig drilling on 1-10H |
2171357 | Primary Facility | 2013-06-03 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Department notes that the well appears to be drilled but not equipped for production. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2173893 | Primary Facility | 2013-05-30 | Drilling/Alteration | No Violations Noted | 5/30/2013 Orion rig diling on the 1-8H. Inspected W/OGI P. Wyrwas. |
2183155 | Primary Facility | 2013-07-11 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Department notes that the well appears to be drilled but not equipped for production. The Erosion and Sedimentation Plan was onsite and appeared to be implemented as designed. No sign of accelerated erosion or sedimentation observed in relation to the well pad or access road during the inspection. The impoundment associated with the well also appears to be in sound condition and had the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2188048 | Primary Facility | 2013-07-25 | Routine/Complete Inspection | No Violations Noted | 7/25/2013 Orion rig drilling on 1-10H. |
2195641 | Primary Facility | 2013-08-12 | Routine/Complete Inspection | No Violations Noted | See inspection #2195630 for observations made on 8/12/2013. Well appeared to be drilled however not equipped for production. The Operator was in the process to reconfiguring the well site to begin stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road at the time of inspection. |
2208600 | Primary Facility | 2013-07-30 | Drilling/Alteration | No Violations Noted | 7/30/2013 Orion rig drilling on 1-8H. |
2259044 | Primary Facility | 2014-03-26 | Routine/Complete Inspection | No Violations Noted | 3/26/2014 Produced fluids ttanks diked and GPU's |
2274456 | Primary Facility | 2014-05-19 | Routine/Complete Inspection | No Violations Noted | 5/19/2014 Produced fluids tanks, GPUs and in line. |
2302584 | Primary Facility | 2014-08-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road at the time of inspection. |
2377785 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | No Violations Noted | 6/9/2015 Produced fluids tanks, GPUs and in line. |
2401504 | Primary Facility | 2015-08-20 | Routine/Complete Inspection | No Violations Noted | 8/20/2015 Produced fluids tanks, GPUs and in line. |
2444386 | Primary Facility | 2016-01-27 | Routine/Complete Inspection | No Violations Noted | Access road gated and locked. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road. |
2449986 | Primary Facility | 2016-01-27 | Routine/Complete Inspection | No Violations Noted | 1/27/2016 Produced fluids tanks, GPUs and in line. |
2476127 | Primary Facility | 2016-04-18 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok. |
2554687 | Primary Facility | 2017-01-24 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2556705 | Primary Facility | 2017-01-26 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2621628 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2690443 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. POC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violation issued (see inspection id 2690435). |
2834643 | Primary Facility | 2019-01-28 | Site Restoration | No Violations Noted | Inspection conducted in response to a Post-drilling Well Site Restoration Report received by Department.
The NOT for this site was approved on 6-15-18. At time of inspection well appears equipped for production. Well head protected by cement posts (photo #2). Four brine tanks on site. Site appears vegetated and returned to near original contours. The Post-drilling Well Site Restoration Report is approved. |
For data sources see[8]