37-129-28697

Well Details

Well ID: 37-129-28697
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148228
Farm/Lease Name: DEVINNEY UNIT 1H
License Status:
Spud Date:
Permit Date: 2011-11-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.452133
Longitude: -79.420519

For data sources see[1][2][3]

Well History

Date Event
2011-11-03 New Permit Application
2012-01-20 Performed Spud Operation
2012-03-23 New Permit Application
2012-04-27 Drilling Completion
2012-09-18 Perforation
2013-08-27 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-28 2012-10-28 7,981 6,026,916

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid - 7.5 HCl Acid PPG Industries Acid
Hydrochloric acid 7647-01-0 7.50 0.03
Other -(non hazardous) 92.50 0.40
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Other -(non hazardous) 70.00 0.03
Sand Proppant Quartz 14808-60-7 100.00 12.53
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor
Other -(non hazardous) 100.00 0.01
Water Water 7732-18-5 100.00 86.93
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Diethylene glycol monobutyl ether 112-34-5 50.00 0.00017000
Other -(non hazardous) 50.00 0.00017000
100.00
Clay Stabilizer - ClaChek G Shrieve Clay Stabilizer Not hazardous 70.00 0.00240000
Water 7732-18-5 30.00 0.00100000
Biocide - MC 8520 Multi-Chem Group Biocide
2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00007000
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00064000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
Biocide - MC 8650 Multi-Chem Group Biocide Glutaraldehyde 111-30-8 60.00 0.00400000
Other -(non hazardous) 40.00 0.00270000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 962,944.00 325 0.00 0 0.00 0
2014 XTO ENERGY INC 741,059.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 495,426.00 320 0.00 0 0.00 0
2016 XTO ENERGY INC 379,070.00 364 0.00 0 0.00 0
2017 XTO ENERGY INC 327,898.40 363 0.00 0 0.00 0
2018 XTO ENERGY INC 321,422.47 365 0.00 0 0.00 0
2019 XTO ENERGY INC 279,696.70 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 658.50 Tons LANDFILL 100434
2012 XTO ENERGY INC Drill Cuttings 584.86 Tons LANDFILL 100419
2012 XTO ENERGY INC Drill Cuttings 133.69 Tons LANDFILL 101397
2013 XTO ENERGY INC Produced Fluid 104.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 2,430.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Fracing Fluid Waste 742.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 98.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 3,301.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Fracturing Fluid Waste 14.00 Tons LANDFILL 100434
2013 XTO ENERGY INC Produced Fluid 3,301.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 230.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2014 XTO ENERGY INC Produced Fluid 855.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 3,418.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 627.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 627.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 1,811.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 726.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 11.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 304.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 454.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 486.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 102.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 1,068.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 342.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 117.30 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 318.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 200.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2037221 Primary Facility 2012-01-25 Drilling/Alteration No Violations Noted At time of inspection, First Class Energy Rig#6 RD20 beginning to ream 17 1/2" hole to 18 1/2" in preparation to set casing string according to Chapter 78-78.83(h). Closed loop system being utilized.
2045692 Primary Facility 2012-02-22 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Well shut in on 9 5/8".
2056033 Primary Facility 2012-03-30 Routine/Complete Inspection No Violations Noted Well is topholed; Location is being prepped for horizontal rig due to move in within a day; On site with 129-28762; E&S OK; Location good;
2066493 Primary Facility 2012-05-03 Drilling/Alteration No Violations Noted Waiting on frac.
2076877 Primary Facility 2012-06-15 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was in the process of removing the drill rig located onsite. The site appeared to be in sound condition with no sign of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggest the Operator continue to monitor the sight weekly and after significant precipitation event to ensure the stability of the well pad access road are retained.
2109561 Primary Facility 2012-10-19 Routine/Complete Inspection No Violations Noted The Department notes that during the Inspection the Operator was in in the process of stimulation, The Erosion and Sedimentation plan was onsite and appears to properly implemented and maintained. The associated pits appear to be in sound condition with the required 2 feet of freeboard. No accelerated erosion or sedimentation observed in relation the well pad or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability is maintained.
2129626 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted Inspection as a result of a restoration extension request from the Operator. At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The well pad and access road appear to be in sound condition, no accelerated erosion or sedimentation observed. As described by the Operator the site is vegetated and appears to be stable. The pits located on site appear to be in sound condition with the required 2' of free board. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable.
2245016 Primary Facility 2014-02-13 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The pits located on site appear to be in sound condition with the required 2' of free board. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable.
2287659 Primary Facility 2014-06-27 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2304334 Primary Facility 2014-09-17 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The pits located have been removed, backfilled, seeded, mulched and appear to have good growth. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable.
2343680 Primary Facility 2015-02-09 Routine/Complete Inspection Pending At the time of inspection the well was drilled and equipped for production. During the inspection the Operator was discharging fluid from the production equipment containment area. The Department would like to request the sample results performed prior to discharge to ensure the discharged fluid meets top hole standards. The Erosion and Sedimentation Plan was on site and appeared to be properly implemented. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2366769 Primary Facility 2015-04-27 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2395119 Primary Facility 2015-08-03 Site Restoration No Violations Noted Inspection in response to the Operators submission of a "Well Site Restoration Report on 1/15/2015. At the time of inspection earth disturbance activities at the site authorized by the Well Permit are complete, the site has been stabilized and the Post Construction Stormwater Management BMP's have been installed.
2439579 Primary Facility 2016-01-07 Routine/Complete Inspection No Violations Noted Well is tagged-in production. Well head casing-production unit-tank battery-dike-equipment all ok.
2494401 Primary Facility 2016-06-17 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2576216 Primary Facility 2017-03-27 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2834873 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dikes and tank battery looks ok.

For data sources see[8]