If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28697 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.452133,"lon":-79.420519,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Loyalhanna Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148228 | |
Farm/Lease Name: DEVINNEY UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-11-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.452133 | |
Longitude: -79.420519 |
Date | Event |
---|---|
2011-11-03 | New Permit Application |
2012-01-20 | Performed Spud Operation |
2012-03-23 | New Permit Application |
2012-04-27 | Drilling Completion |
2012-09-18 | Perforation |
2013-08-27 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-10-28 | 2012-10-28 | 7,981 | 6,026,916 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid - 7.5 HCl Acid | PPG Industries | Acid | |||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.03 | |||||
Other -(non hazardous) | 92.50 | 0.40 | ||||||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Other -(non hazardous) | 70.00 | 0.03 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.53 | |||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | ||||||
Other -(non hazardous) | 100.00 | 0.01 | ||||||
Water | Water | 7732-18-5 | 100.00 | 86.93 | ||||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00017000 | ||
Other -(non hazardous) | 50.00 | 0.00017000 | ||||||
100.00 | ||||||||
Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | Not hazardous | 70.00 | 0.00240000 | |||
Water | 7732-18-5 | 30.00 | 0.00100000 | |||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | ||||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00007000 | |||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00064000 | |||||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Glutaraldehyde | 111-30-8 | 60.00 | 0.00400000 | ||
Other -(non hazardous) | 40.00 | 0.00270000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 962,944.00 | 325 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 741,059.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 495,426.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 379,070.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 327,898.40 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 321,422.47 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 279,696.70 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 658.50 Tons | LANDFILL | 100434 |
2012 | XTO ENERGY INC | Drill Cuttings | 584.86 Tons | LANDFILL | 100419 |
2012 | XTO ENERGY INC | Drill Cuttings | 133.69 Tons | LANDFILL | 101397 |
2013 | XTO ENERGY INC | Produced Fluid | 104.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 2,430.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 742.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 98.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 3,301.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Fracturing Fluid Waste | 14.00 Tons | LANDFILL | 100434 |
2013 | XTO ENERGY INC | Produced Fluid | 3,301.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2014 | XTO ENERGY INC | Produced Fluid | 855.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 3,418.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 627.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 627.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 1,811.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 726.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 304.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 454.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 486.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 1,068.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 342.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 117.30 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 318.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2037221 | Primary Facility | 2012-01-25 | Drilling/Alteration | No Violations Noted | At time of inspection, First Class Energy Rig#6 RD20 beginning to ream 17 1/2" hole to 18 1/2" in preparation to set casing string according to Chapter 78-78.83(h). Closed loop system being utilized. |
2045692 | Primary Facility | 2012-02-22 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. Well shut in on 9 5/8". |
2056033 | Primary Facility | 2012-03-30 | Routine/Complete Inspection | No Violations Noted | Well is topholed; Location is being prepped for horizontal rig due to move in within a day; On site with 129-28762; E&S OK; Location good; |
2066493 | Primary Facility | 2012-05-03 | Drilling/Alteration | No Violations Noted | Waiting on frac. |
2076877 | Primary Facility | 2012-06-15 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of removing the drill rig located onsite. The site appeared to be in sound condition with no sign of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggest the Operator continue to monitor the sight weekly and after significant precipitation event to ensure the stability of the well pad access road are retained. |
2109561 | Primary Facility | 2012-10-19 | Routine/Complete Inspection | No Violations Noted | The Department notes that during the Inspection the Operator was in in the process of stimulation, The Erosion and Sedimentation plan was onsite and appears to properly implemented and maintained. The associated pits appear to be in sound condition with the required 2 feet of freeboard. No accelerated erosion or sedimentation observed in relation the well pad or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability is maintained. |
2129626 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | Inspection as a result of a restoration extension request from the Operator. At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The well pad and access road appear to be in sound condition, no accelerated erosion or sedimentation observed. As described by the Operator the site is vegetated and appears to be stable. The pits located on site appear to be in sound condition with the required 2' of free board. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. |
2245016 | Primary Facility | 2014-02-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The pits located on site appear to be in sound condition with the required 2' of free board. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. |
2287659 | Primary Facility | 2014-06-27 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2304334 | Primary Facility | 2014-09-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to drilled and equipped for production. The well apparatus, brine tank, and heater appear to be in sound condition. The pits located have been removed, backfilled, seeded, mulched and appear to have good growth. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable. |
2343680 | Primary Facility | 2015-02-09 | Routine/Complete Inspection | Pending | At the time of inspection the well was drilled and equipped for production. During the inspection the Operator was discharging fluid from the production equipment containment area. The Department would like to request the sample results performed prior to discharge to ensure the discharged fluid meets top hole standards. The Erosion and Sedimentation Plan was on site and appeared to be properly implemented. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2366769 | Primary Facility | 2015-04-27 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2395119 | Primary Facility | 2015-08-03 | Site Restoration | No Violations Noted | Inspection in response to the Operators submission of a "Well Site Restoration Report on 1/15/2015. At the time of inspection earth disturbance activities at the site authorized by the Well Permit are complete, the site has been stabilized and the Post Construction Stormwater Management BMP's have been installed. |
2439579 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | No Violations Noted | Well is tagged-in production. Well head casing-production unit-tank battery-dike-equipment all ok. |
2494401 | Primary Facility | 2016-06-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2576216 | Primary Facility | 2017-03-27 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2834873 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dikes and tank battery looks ok. |
For data sources see[8]