37-129-28737

Well Details

Well ID: 37-129-28737
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Upper Burrell Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: MCCRADY 5H
License Status:
Spud Date:
Permit Date: 2012-01-11
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.525775
Longitude: -79.674944

For data sources see[1][2][3]

Well History

Date Event
2012-01-11 New Permit Application
2012-02-27 Performed Spud Operation
2012-06-11 Drilling Completion
2012-07-05 Perforation
2013-08-27 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 PENNECO OIL CO INC 972.00 61 5144.30 61 0.00 0
2013 PENNECO OIL CO INC 4,384.00 212 5677.06 212 0.00 0
2014 PENNECO OIL CO INC 12,236.00 365 3400.59 365 0.00 0
2015 PENNECO OIL CO INC 11,172.77 365 2344.91 365 0.00 0
2016 PENNECO OIL CO INC 9,145.03 366 1372.86 273 0.00 0
2017 PENNECO OIL CO INC 8,108.00 365 766.61 365 0.00 0
2018 PENNECO OIL CO INC 6,882.61 365 589.34 184 0.00 0
2019 PENNECO OIL CO INC 6,350.05 365 350.65 121 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 PENNECO OIL CO INC Drilling Fluid Waste 2,818.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 PENNECO OIL CO INC Drilling Fluid Waste 1,050.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PENNECO OIL CO INC Produced Fluid 1,176.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid 585.5 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 PENNECO OIL CO INC Produced Fluid 585.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 PENNECO OIL CO INC Produced Fluid 207 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 207.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 PENNECO OIL CO INC Produced Fluid 985 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 985.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 PENNECO OIL CO INC Produced Fluid 85.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 PENNECO OIL CO INC Produced Fluid 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 PENNECO OIL CO INC Produced Fluid 50.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3177

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2038108 Primary Facility 2012-01-25 Routine/Complete Inspection No Violations Noted Well was staked, drilling was not ongoing at the time of the inspection. McCready 4H well located onsite and it appared to be equipped for production. A second drill pit had been constructed onsite. The second pit had been properly lined and the contents of the first drill pit had been moved to the second pit. Second pit had more than the required two feet of lined freeboard. Phone conversation with Penneco confirmed that this was so that the first pit may be relined and reused when drilling the McCready 5H well. All access road and site erosion controls were functioning properly and there was no observed accelerated erosion or sedimenation in relation to either the access road or well-site.
2044966 Primary Facility 2012-02-23 Routine/Complete Inspection No Violations Noted n response to a spud noticed the departemnt received a Routine Completed Instepection was completed on 2/23/2012. The location of the McCrady 5H location was marked. The drill pit has been constructed and lined. There was no accelerated erosion observed in relation to the site or access road. The operator should continue to monitor the access road well pad for accelerated erosion. It was also noted that the pit liner had been compromised by numberous stakes and chain link fence posts.
2048790 Primary Facility 2012-03-06 Drilling/Alteration No Violations Noted US Energy Ri#4 RD20 waiting on cement at time of inspection. Pit lined and freeboard maintained.
2069617 Primary Facility 2012-05-21 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to drilled but not equipped for production. The drill cuttings pit onsite appeared to be in sound condition with the required amount of freeboard. The flow back pit also appeared to be in sound condition with the required amount of freeboard. The Operator noted during the inspection the well had been top holed and they were preparing for the horizontal equipment to be delivered in the following week No accelerated erosion observed in relation to the access road or well pad area at the time of inspection. The E&S plan was onsite and properly implemented and maintained.
2380333 Primary Facility 2015-06-18 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The brine tank, pump jack and well apparatus appear to be in sound condition. The site appeared to be restored. No observation of accelerated erosion or sedimentation in relation to the well site or access road.

For data sources see[7]