X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28777

Well Details

Well ID: 37-129-28777
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 145843
Farm/Lease Name: BASISTA-DERMOTTA UNIT 7H
License Status:
Spud Date:
Permit Date: 2012-03-30
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.270003
Longitude: -79.777550

For data sources see[1][2][3]

Well History

Date Event
2012-03-30 New Permit Application
2012-07-06 Performed Spud Operation
2013-08-06 New Permit Application
2017-07-26 MOD
2018-10-19 MOD

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 300.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 288.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,987.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drill Cuttings 681.78 Tons LANDFILL 100592
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 3,097.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 938.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,250.40 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 33.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 20.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 8,325.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016 CHEVRON APPALACHIA LLC Produced Fluid 271.51 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2061770 Primary Facility 2012-04-24 Routine/Complete Inspection No Violations Noted
2081799 Primary Facility 2012-07-10 Routine/Complete Inspection No Violations Noted Spud inspection, no issues observed.
2082586 Primary Facility 2012-07-11 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2089535 Primary Facility 2012-07-24 Drilling/Alteration No Violations Noted 7/24/2012 Highlands rig 7 running 20" csg. @ depth of 285'.
2093494 Primary Facility 2012-08-02 Drilling/Alteration No Violations Noted 8/2/2012 Highlands rig 7 drilling @ depth of 2312'
2101048 Primary Facility 2012-08-27 Drilling/Alteration No Violations Noted 8/27/2012 Highlands rig 7 finished the top hole portion of the 7H bore hole, depth of 8164'.
2110437 Primary Facility 2012-10-24 Drilling/Alteration No Violations Noted 10/16/2012 Highlands rig 7 moving off of pad.
2120864 Primary Facility 2012-11-19 Drilling/Alteration No Violations Noted 11/19/2012 Top hole drilled, waiting on rig to drill lateral.
2170264 Primary Facility 2013-05-30 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled however it is not stimulated or equipped for production. The pit located on site appeared to be in sound condition and had the required 2' of freeboard. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department suggests the operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability is maintained.
2556894 Primary Facility 2017-01-30 Routine/Partial Inspection No Violations Noted At the time of inspection, the well appeared to be drilled however it is not stimulated or equipped for production. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department suggests the operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability is maintained.

For data sources see[7]

References