If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28791 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.557961,"lon":-79.701314,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Upper Burrell Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: HARTGE 7H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-07-05 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.557961 | |
Longitude: -79.701314 |
Date | Event |
---|---|
2012-07-05 | New Permit Application |
2012-12-04 | Performed Spud Operation |
2013-01-16 | Drilling Completion |
2013-02-27 | Perforation |
2013-08-07 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 18,717.00 | 214 | 6964.56 | 214 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 10,907.00 | 365 | 2596.38 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 7,793.39 | 365 | 1792.57 | 273 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 6,016.81 | 366 | 1040.13 | 181 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 3,850.00 | 304 | 522.21 | 304 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 4,509.71 | 365 | 1,136.16 | 184 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 7,969.94 | 365 | 1,045.15 | 211 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | Drilling Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | PENNECO OIL CO INC | Fracing Fluid Waste | 160.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Basic Sediment | 210 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Basic Sediment | 210.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Drilling Fluid Waste | 495 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 530 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 530.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Drilling Fluid Waste | 495.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Fracing Fluid Waste | 160 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 81.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 81 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 69 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 69.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 48 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 48.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 21.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | PENNECO OIL CO INC | Produced Fluid | 22.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | PENNECO OIL CO INC | Produced Fluid | 62.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | PENNECO OIL CO INC | Produced Fluid | 47.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2019 | PENNECO OIL CO INC | Produced Fluid | 98.67 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3177 |
2019 | PENNECO OIL CO INC | Produced Fluid | 57.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2122303 | Primary Facility | 2012-12-05 | Routine/Complete Inspection | No Violations Noted | Inspection the result of a spud noticed received by the Department on 12/03/2012. At the time of inspection the spud rig was on site. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2125644 | Primary Facility | 2012-12-26 | Routine/Complete Inspection | No Violations Noted | No violations noted |
2126124 | Primary Facility | 2012-12-26 | Drilling/Alteration | No Violations Noted | Falcon rig#27 drilling at 136’ at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe. |
2128523 | Primary Facility | 2013-01-02 | Drilling/Alteration | No Violations Noted | Appalachian Well Services (Falcon rig#27) preparing to grout 13 3/8” annulus at time of inspection. Operator rep K. McDowell notified Department of lost circulation on 13 3/8” water/coal protection string. Cement top determined at 250’ per log. Operator to meet requirements of 78.83b. Casing and cementing—lost circulation. Pit lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe. |
2129623 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was on site and was in the process of drilling the 7H well. The Operator indicated that the rig was at a depth of 3150'. At the time of inspection the site appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The E&S plan was onsite and the pit located on site appeared to be in sound condition with the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2133411 | Primary Facility | 2012-01-24 | Routine/Complete Inspection | Pending | Pending |
2134646 | Primary Facility | 2013-01-24 | Drilling/Alteration | No Violations Noted | Waiting on frac. Pits lined and freeboards maintained. |
2152335 | Primary Facility | 2013-04-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be drilled and stimulated however the well does not appear to be equipped for production. Three pit located on site appear to be in sound conditions and appear to have the required 2' of freeboard. No observation of accelerated erosion and sedimentation in relation to the well pad and access road during the inspection. The E&S plan was on site and appear to be properly installed and maintained as outlined in the plan. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. The Department also suggests the Operator contact WQS Sam Steingrabe prior to the removal, encapsulation, or land farming of the contents of the pits located onsite. Please contact Sam via email 24 hours prior to the start of the activity. |
2380331 | Primary Facility | 2015-06-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The brine tank, pump jack and well apparatus appear to be in sound condition. The site appeared to be restored. No observation of accelerated erosion or sedimentation in relation to the well site or access road. |
2649589 | Primary Facility | 2017-10-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Three brine tanks located off well site within earthen dike and appears to be structurally sound. No E&S issues. |
For data sources see[7]