If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28843 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.363781,"lon":-79.299714,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 145495 | |
Farm/Lease Name: MCBROOM 1-8H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-05-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.363781 | |
Longitude: -79.299714 |
Date | Event |
---|---|
2013-05-02 | New Permit Application |
2013-05-07 | Performed Spud Operation |
2013-09-07 | Drilling Completion |
2013-11-21 | Perforation |
2016-06-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-12-03 | 2013-12-06 | 8,330 | 4,902,880 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRESH WATER | OPERATOR | BASE FLUID | FRESH WATER | 7732-18-5 | 100 | 88.3812 | 40,840,900.0 |
SP BREAKER | HALLIBURTON | BREAKER | SODIUM PERSULFATE | 7775-27-1 | 100 | 0.00002986 | 14 | |
BE-9W | HALLIBURTON | BIOCIDE | TRIBUTYL TETRADECYL PHOSPHONIUM CHLORIDE | 81741-28-8 | 10 | 0.00412048 | 1905 | |
HYDROCHLORIC ACID 10-30% | HALLIBURTON | ACID | HYDROCHLORIC ACID | 7647-01-0 | 30 | 0.0116208 | 5370 | |
WG-36 GELLING AGENT | HALLIBURTON | GELLING AGENT | GUAR GUM | 9000-30-0 | 100 | 0.00110258 | 510 | |
OTHER | WATER | 7732-18-5 | 0 | 0.8071 | 372961 | |||
SODIUM CHLORIDE | 7647-14-5 | 0 | 0.00521756 | 2412 | ||||
OLEFINS | Confidential | 0 | 0.00003047 | 15 | ||||
SURFACTANT MIXTURE | Confidential | 0 | 0.00001103 | 6 | ||||
FORMALDEHYDE | 50-00-0 | 0 | 0.000480715 | 223 | ||||
REACTION PRODUCT OF ACETOPHENONE, FORMALDEHYDE, THIOUREA AND OLEIC ACID IN DIMETHYL FORMAMIDE |
68527-49-1 | 0 | 0.000182805 | 85 | ||||
FATTY ACIDS, TALL OIL | Confidential | 0 | 0.000182805 | 85 | ||||
BENTONITE, BENZYL(HYDROGENATED TALLOW ALKYL) DIMETHYLAMMONIUM STEARATE COMPLEX |
121888-68-4 | 0 | 0.00005513 | 26 | ||||
ALCOHOLS, C12-16, ETHOXYLATED | 68551-12-2 | 0 | 0.00521756 | 2412 | ||||
CRYSTALLINE SILICA, QUARTZ | 14808-60-7 | 0 | 0.00000110 | 1 | ||||
PROPYLENE GLYCOL | 57-55-6 | 0 | 0.0247229 | 11425 | ||||
FATTY ACID TALL OIL AMIDE | Confidential | 0 | 0.00521756 | 2412 | ||||
SORBITAN, MONO-9-OCTADECENOATE, (Z) | 1338-43-8 | 0 | 0.00104351 | 483 | ||||
OLEFINS | Confidential | 0 | 0.00000609 | 3 | ||||
SORBITAN MONOOLEATE POLYOXYETHYLENE DERIVATIVE | 9005-65-6 | 0 | 0.00104351 | 483 | ||||
SILICA GEL | 112926-00-8 | 0 | 0.00001103 | 6 | ||||
SODIUM SULFATE | 7757-82-6 | 0 | 0.00000003 | 1 | ||||
POLYACRYLAMIDE COPOLYMER | Confidential | 0 | 0.0313054 | 14467 | ||||
ORGANIC PHOSPHONATE | Confidential | 0 | 0.0288429 | 13329 | ||||
ALCOHOLS, C14-C15, ETHOXYLATED | 68951-67-7 | 0 | 0.000182805 | 85 | ||||
AMMONIUM CHLORIDE | 12125-02-9 | 0 | 0.00521756 | 2412 | ||||
FR-66 | HALLIBURTON | FRICTION REDUCER | HYDROTREATED LIGHT PETROLEUM DISTILLATE | 64742-47-8 | 30 | 0.0313054 | 14467 | |
SAND - COMMON WHITE | HALLIBURTON | PROPPANT | CRYSTALLINE SILICA, QUARTZ | 14808-60-7 | 100 | 0.73547 | 339860 | |
HAI-OS ACID INHIBITOR | HALLIBURTON | CORROSION INHIBITOR | METHANOL | 67-56-1 | 60 | 0.00036561 | 169 | |
PROPARGYL ALCOHOL | 107-19-7 | 10 | 0.00006093 | 29 | ||||
LP-65 | HALLIBURTON | SCALE INHIBITOR | AMMONIUM CHLORIDE | 12125-02-9 | 10 | 0.00480715 | 2222 | |
HYDROCHLORIC ACID 5-10% | HALLIBURTON | ACID | HYDROCHLORIC ACID | 7647-01-0 | 10 | 0.0635705 | 29376 | |
SAND - PREMIUM WHITE | HALLIBURTON | PROPPANT | CRYSTALLINE SILICA, QUARTZ | 14808-60-7 | 100 | 10.0136 | 4,627,260.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XPR RESOURCES LLC | 31,138.30 | 9 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 688,636.32 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 370,350.50 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 252,967.45 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 191,413.94 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 146,218.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 115,647.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XPR RESOURCES LLC | Fracing Fluid Waste | 213.33 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | XPR RESOURCES LLC | Drill Cuttings | 1,642.52 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2014 | XPR RESOURCES LLC | Produced Fluid | 1,096.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Drilling Fluid Waste | 1,493.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 704.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 528.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Fracturing Fluid Waste | 4.84 Bbl | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Other Oil & Gas Wastes | 813.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 422.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 585.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2017 | XPR RESOURCES LLC | Produced Fluid | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2018 | XPR RESOURCES LLC | Produced Fluid | 256.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XPR RESOURCES LLC | Produced Fluid | 490.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 67.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | XPR RESOURCES LLC | Produced Fluid | 44.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XPR RESOURCES LLC | Produced Fluid | 418.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2167528 | Primary Facility | 2013-05-17 | Drilling/Alteration | No Violations Noted | Conductor And cellar in place |
2182337 | Primary Facility | 2013-05-30 | Drilling/Alteration | No Violations Noted | 5/30/2013 Waiting to be drilled Inspected W/OGI P. Wyrwas. |
2182403 | Primary Facility | 2013-06-06 | Drilling/Alteration | No Violations Noted | 6/6/2013 Waiting to be drilled. |
2188041 | Primary Facility | 2013-07-25 | Drilling/Alteration | No Violations Noted | 7/25/2013 Waiting to be drilled. |
2195656 | Primary Facility | 2013-08-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was on site and placed on containment. The Erosion and Sedimentation Plan was onsite and appeared to be implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2200890 | Primary Facility | 2013-09-03 | Incident- Response to Accident or Event | In Compliance with Policy | Inspection the result of the Operator reporting a 35 gallon spill of synthetic drilling mud onto containment. Operator reported the spill at 4:30 pm on 8.31.2013. The Department notes that during the inspection the Operator had addressed the issues resulting in the spill and vacuumed the synthetic mud from the containment. The Operators action is in compliance with the Departments current spill policy. At the time of inspection the drill rig was on site and placed on containment. The Erosion and Sedimentation Plan was onsite and appeared to be implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2211066 | Primary Facility | 2013-09-23 | Drilling/Alteration | No Violations Noted | 9/23/2013 Waiting to be drilled. |
2217764 | Primary Facility | 2013-10-03 | Drilling/Alteration | No Violations Noted | 10/3/2013 drilling on 10H well at depth of 11,455'. inspected w/OGI P. Wyrwas. |
2222843 | Primary Facility | 2013-11-05 | Drilling/Alteration | No Violations Noted | 11/5/2013 moving rig off pad. |
2237668 | Primary Facility | 2014-01-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and stimulated. The Operator indicated that they are actively working to equip the well for production. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2259079 | Primary Facility | 2014-03-26 | Routine/Complete Inspection | No Violations Noted | 3/26/2014 Produced fluids ttanks diked and GPU's |
2274314 | Primary Facility | 2014-05-20 | Routine/Complete Inspection | No Violations Noted | 5/20/2014 Produced fluids tanks diked and GPU’s |
2302607 | Primary Facility | 2014-08-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to drilled and stimulated. The Operator indicated that they are actively working to equip the well for production. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2347386 | Primary Facility | 2015-02-18 | Routine/Complete Inspection | No Violations Noted | 2/18/2015 Produced fluids tanks diked and GPU’s. Inspected w/OGI P. Wyrwas. |
2358840 | Primary Facility | 2015-04-07 | Site Restoration | No Violations Noted | Inspection in response to a "Well Site Restoration Report" file by the Operator on 11-3-2014. At the time of inspection all earth disturbance activities, authorized by the well permit were complete, and the site has been stabilized. Site appears to meet PCSM and BMPs have been removed. |
2440127 | Primary Facility | 2016-01-12 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Freshwater impoundment located on site and appears structurally sound. Site permanently stabilized with no signs of E& S issues in relation to site and/or access road. |
2474481 | Primary Facility | 2016-04-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok. |
2502326 | Primary Facility | 2016-07-18 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appear to in sound condition. Well labeled and no observation of accelerated erosion or sedimentation in relation to the well site or access road. |
2553549 | Primary Facility | 2017-01-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized with no signs of E& S issues in relation to site and/or access road. |
2554693 | Primary Facility | 2017-01-24 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2621658 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2690487 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.
Site id sign updated to reflect current Operator information. PPC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violation issued (see inspection id 2690484). |
2755323 | Primary Facility | 2018-07-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Four brine tanks within secondary containment and appears structurally sound. No E&S issues. |
For data sources see[8]