If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28953 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.579097,"lon":-79.669006,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Upper Burrell Township | |
Operator Name: HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | |
Well Pad ID: 154469 | |
Farm/Lease Name: ZEUS 6M | |
License Status: | |
Spud Date: | |
Permit Date: 2017-10-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.579097 | |
Longitude: -79.669006 |
Date | Event |
---|---|
2017-10-17 | New Permit Application |
2018-03-27 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-06-08 | 2018-06-21 | 7,299 | 17,577,600 | 23,432,600 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (100 Mesh Proppant) | ProFrac | Proppant | Listed Below | ||||
ProFE 105 | ProFrac | Iron Control | Listed Below | |||||
Scaletreat 30 | Clariant | Scale Inhibitor | Listed Below | |||||
Hydrochloric Acid (7.5%) | Cooper Natural | Acidizing | Listed Below | |||||
Flotreat DR 15635 | Clariant | Friction Reducer | Listed Below | |||||
Water | Rockdale Energy | Carrier/Base Fluid | 7732-18-5 | |||||
ProHib 100 | ProFrac | Acid Inhibitor | Listed Below | |||||
Hydrochloric Acid (Hydrogen Chloride)Hydrochloric Acid (Hydrogen Chloride) |
7647-01-0 | 36 | 0.20036 | |||||
Quaternary Ammonium Chloride | 68391-01-5 | 3 | 0.0056 | |||||
Glutaraldehyde | 111-30-8 | 20 | 0.00374 | |||||
2-Propyn-1-ol compound w/ methyloxirane | 38172-91-7 | 15 | 0.0025 | |||||
Alcohols,C11-14-iso, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.00263 | |||||
Dideclydimethylammonium Chloride | 7173-51-5 | 3 | 0.0056 | |||||
Water | 7732-18-5 | 85 | 0.00142 | |||||
Water | 7732-18-5 | 63 | 0.35062 | |||||
Silica Substrate | 14808-60-7 | 100 | 13.686 | |||||
Water | 7732-18-5 | 70 | 0.0014 | |||||
Citric Acid | 77-92-9 | 40 | 0.0008 | |||||
Sulphamic Acid | 5329-14-6 | 5 | 0.0001 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | 2,091,208.00 | 162 | 0.00 | 0 | 0.00 | 0 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | 2,256,507.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 22.80 Tons | LANDFILL | 100594 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 31,227.48 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 1,950.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 2,768.10 Bbl | REUSE (AT WELL PAD) | |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 1,568.12 Tons | LANDFILL | 100280 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 31.09 Tons | LANDFILL | 100280 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 95.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drilling Fluid Waste | 3,020.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Synthetic Liner Materials | 28.81 Tons | LANDFILL | 100280 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 2,305.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Synthetic Liner Materials | 11.70 Tons | LANDFILL | 100280 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 116.70 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 225.00 Bbl | REUSE (AT WELL PAD) | |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 39,984.90 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 22,237.30 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2711383 | Primary Facility | 2018-03-28 | Drilling/Alteration | No Violations Noted | This well was spudded on 3/27/2018 at 11:15am. The spud rig drilled a 9' cellar hole and a 8'x8' cellar ring was installed. The spud rig then drilled a conductor hole 42'x30" and a mouse hole to 75'.
On 3/28/2018 the rig set 42' of 26" conductor pipe and 75' of 16 " mouse hole pipe. The conductor pipe was grouted back to the cellar surface. There was a trace of water encountered at 9'. The operator has installed a sound wall completely around this well pad. All equipment on site looked ok. |
2718458 | Primary Facility | 2018-04-16 | Drilling/Alteration | No Violations Noted | This well was spudded on 3/27/2018 at 11:15am. The spud rig drilled a 9' cellar hole and a 8'x8' cellar ring was installed. The spud rig then drilled a conductor hole 42'x30" and a mouse hole to 75'.
On 3/28/2018 the rig set 42' of 26" conductor pipe and 75' of 16 " mouse hole pipe. The conductor pipe was grouted back to the cellar surface. There was a trace of water encountered at 9'. The operator has installed a sound wall completely around this well pad. At the time of this inspection the Rig was drilling at 650'. All equipment on site looked ok. |
2721408 | Primary Facility | 2018-04-23 | Drilling/Alteration | No Violations Noted | This well was spudded on 3/27/2018 at 11:15am. The spud rig drilled a 9' cellar hole and a 8'x8' cellar ring was installed. The spud rig then drilled a conductor hole 42'x30" and a mouse hole to 75'.
On 3/28/2018 the rig set 42' of 26" conductor pipe and 75' of 16 " mouse hole pipe. The conductor pipe was grouted back to the cellar surface. There was a trace of water encountered at 9'. The operator has installed a sound wall completely around this well pad. At the time of this inspection the Rig was drilling at 650'. All equipment on site looked ok. |
2724472 | Primary Facility | 2018-04-30 | Drilling/Alteration | No Violations Noted | This well was spudded on 3/27/2018 at 11:15am. The spud rig drilled a 9' cellar hole and a 8'x8' cellar ring was installed. The spud rig then drilled a conductor hole 42'x30" and a mouse hole to 75'.
On 3/28/2018 the rig set 42' of 26" conductor pipe and 75' of 16 " mouse hole pipe. The conductor pipe was grouted back to the cellar surface. There was a trace of water encountered at 9'. The operator has installed a sound wall completely around this well pad. At the time of this inspection the Rig was drilling at 8908'. All equipment on site looked ok. |
2726953 | Primary Facility | 2018-05-07 | Drilling/Alteration | No Violations Noted | This well was spudded on 3/27/2018 at 11:15am. The spud rig drilled a 9' cellar hole and a 8'x8' cellar ring was installed. The spud rig then drilled a conductor hole 42'x30" and a mouse hole to 75'.
On 3/28/2018 the rig set 42' of 26" conductor pipe and 75' of 16 " mouse hole pipe. The conductor pipe was grouted back to the cellar surface. There was a trace of water encountered at 9'. The operator has installed a sound wall completely around this well pad. At the time of this inspection the Rig was drilling at 17105'. All equipment on site looked ok. |
2741303 | Primary Facility | 2018-06-14 | Drilling/Alteration | No Violations Noted | Stimulating well. |
2753012 | Primary Facility | 2018-07-17 | Complaint Inspection | Violation(s) Noted | Present during inspection is operator rep Scott Krueger.
Well head surrounded by cement barriers. At time of inspection 8 roll off boxes on site. These boxes are on secondary containment. Contractors are removing the panels from the noise reduction wall. Contractors are removing the temporary water transmission lines. According to Mr. Krueger well is drilled and frac'ed but flow back has not begun. |
2760868 | Primary Facility | 2018-08-06 | Compliance Evaluation | No Violations Noted | CEI to inspection record #2753012 where a violation was issued for failure to notify the Department within 24 hours of receiving notification that a water supply has been affected by pollution or diminution.
Department received response to NOV from operator (photo #1). Violation issued on 7-17-18 has been corrected. |
2764374 | Primary Facility | 2018-08-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears structurally sound and within secondary containment. GPU within secondary containment. Drilling equipment and materials located on containment. No E&S issues.
Previously issued site violations remain outstanding. |
2769562 | Primary Facility | 2018-08-31 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Brine tanks and GPUs within secondary containment and appears structurally sound. No E&S issues. |
2775340 | Primary Facility | 2018-09-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. GPUs within secondary containment and appears structurally sound. No E&S issues. |
2806862 | Primary Facility | 2018-11-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tanks and GPUs within secondary containment. No E&S issues. |
2827411 | Primary Facility | 2019-01-16 | Routine/Complete Inspection | No Violations Noted | Conductor and cellar set.
1/16/19 - Well producing. Preparing to move rig on site. |
2843580 | Primary Facility | 2019-02-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. GPU within secondary containment. No E&S issues. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2753012 | 823320 | 2018-07-17 | 2018-08-06 | 78.51(h) | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
823320 | 365883 | NOV - Notice of Violation | 2018-08-06 |
For data sources see[8]