If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-29002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.249631,"lon":-79.719933,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Sewickley Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 154865 | |
Farm/Lease Name: SINAY 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2018-02-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.249631 | |
Longitude: -79.719933 |
Date | Event |
---|---|
2018-02-05 | New Permit Application |
2018-08-02 | Performed Spud Operation |
2019-05-21 | MOD |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1.04 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2019 | CHEVRON APPALACHIA LLC | Synthetic Liner Materials | 1.83 Tons | LANDFILL | 100663 |
2019 | CHEVRON APPALACHIA LLC | Waste Water Treatment Sludge | 7.34 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 64.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 163.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 3.99 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 9.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 13,790.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 53.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 88.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 12.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2761700 | Primary Facility | 2018-08-07 | Drilling/Alteration | No Violations Noted | Process setting conductor pipe. Hole 36 inch diameter pipe set at 30 inch. Pipe set at 40 feet. |
2770940 | Primary Facility | 2018-09-05 | Routine/Complete Inspection | No Violations Noted | Inspection in response to receipt of spud notification from Operator. At the time of inspection well spudded. No E&S issues. |
2778955 | Primary Facility | 2018-09-20 | Drilling/Alteration | No Violations Noted | |
2808607 | Primary Facility | 2018-11-30 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well spudded. No drill rig or active drilling activity on site. No E&S issues. |
2823930 | Primary Facility | 2019-01-04 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, well 3H has been spudded and is not yet drilled to total depth. Wells 1H, 2H, 4H, 5H, 6H, 7H, 8H, 9H, and 10H have also been spudded and are not yet drilled to total depth. |
2856153 | Primary Facility | 2019-03-20 | Drilling/Alteration | No Violations Noted | Highlands 12 drilling on Sinay 5H depth of 404'. Getting ready to run 20" csg. to 385'. |
For data sources see[7]