X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20096

Well Details

Well ID: 37-131-20096
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 145198
Farm/Lease Name: KEYSTONE UNIT 1 MIRABELLI 1 KEYSTONE 2H
License Status:
Spud Date: 2011-06-12
Permit Date: 2010-08-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.604095
Longitude: -76.005474

For data sources see[1][2][3]

Well History

Date Event
2010-08-31 New Permit Application
2011-05-27 New Permit Application
2011-09-01 Performed Spud Operation
2011-09-26 Perforation
2011-09-26 Performed Stimulation
2011-10-11 Drilling Completion
2012-10-18 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-09-26 2011-09-26 7,822 10,483,270

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SuperSurf Universal Well Services Surfactant
Methanol 67-56-1 60.00 0.09
Unislik ST 50 Universal Well Services Friction Reducer Hydrotreated Light Distillate 30.00 0.07
7.5.-15 HCL Universal Well Services Acid Hydrochloric acid 7647-01-0 15.00 0.11
Water 7732-18-5 92.50
Biocide EC 6116A Universal Well Services Biocide
Polyethylene glycol 25322-68-3 60.00
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00
Dibromoacetonitrile 3252-43-5 5.00 0.03
SI-100 Universal Well Services Scale Inhibitor Ethylene glycol 107-21-1 60.00 0.02

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-09-26 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 CITRUS ENERGY CORP 813,772.00 68 0.00 0 0.00 0
2012 CITRUS ENERGY CORP 2,509,082.00 291 0.00 0 0.00 0
2013 CITRUS ENERGY CORP 1,219,036.00 260 0.00 0 0.00 0
2014 WARREN E & P INC 668,059.84 267 0.00 0 0.00 0
2015 WARREN E & P INC 688,331.33 260 0.00 0 0.00 0
2016 WARREN E & P INC 768,740.54 364 0.00 0 0.00 0
2017 WARREN E & P INC 602,258.18 365 0.00 0 0.00 0
2018 BKV OPR LLC 526,309.00 360 0.00 0 0.00 0
2019 BKV OPR LLC 8,579.06 50 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CITRUS ENERGY CORP Drill Cuttings 110.00 Tons LANDFILL 101247
2011 CITRUS ENERGY CORP Drill Cuttings 74.00 Tons LANDFILL THR029
2011 CITRUS ENERGY CORP Fracing Fluid Waste 7,114.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CITRUS ENERGY CORP Produced Fluid 2,118.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 WARREN E & P INC Produced Fluid 736.05 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 CITRUS ENERGY CORP Produced Fluid 354.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 WARREN E & P INC Produced Fluid 753.22 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 WARREN E & P INC Produced Fluid 454.30 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 75.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 36.99 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 260.96 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 120.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 316.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Synthetic Liner Materials 0.10 Tons LANDFILL THR029
2016 WARREN E & P INC Produced Fluid 494.58 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 13.22 Tons LANDFILL THR029
2017 WARREN E & P INC Produced Fluid 614.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Other Oil & Gas Wastes 37.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 21.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 WARREN E & P INC Produced Fluid 182.54 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Other Oil & Gas Wastes 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 WARREN E & P INC Produced Fluid 177.94 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Other Oil & Gas Wastes 36.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Waste Water Treatment Sludge 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 BKV OPR LLC Produced Fluid 9.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 WARREN E & P INC Produced Fluid 951.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Produced Fluid 21.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Servicing Fluid 50.77 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Synthetic Liner Materials 1.93 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Other Oil & Gas Wastes 20.63 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 BKV OPR LLC Soil Contaminated by Oil 10.85 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Soil Contaminated by Oil & Gas Related Spills 10.85 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Synthetic Liner Materials 5.28 Tons LANDFILL 101247
2019 BKV OPR LLC Produced Fluid 15.00 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 82.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Produced Fluid 502.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1980316 Primary Facility 2011-06-13 Drilling/Alteration No Violations Noted Patterson UTI Rig 61, Comp. man - Joey Catlin, Current depth - 875'
1981739 Primary Facility 2011-06-20 Drilling/Alteration No Violations Noted )Patterson UTI 61
1984448 Primary Facility 2011-06-28 Drilling/Alteration No Violations Noted Patterson UTI Rig 61 Drillers log ok at 8744' Comp. Man - Joey Catlin
1986578 Primary Facility 2011-07-07 Drilling/Alteration No Violations Noted E&S - Matt Shope on location Comp. Man - Joey Catlin Drillers log - ok BOP - ok
1988358 Primary Facility 2011-07-15 Drilling/Alteration No Violations Noted Patterson UTI Rig 61 Comp. Man - Joey Catlin Drillers Log - checked
1990373 Primary Facility 2011-07-22 Drilling/Alteration No Violations Noted Patterson UTI Rig 61, Consultant - Rick Davidson, Warrior Services - Nick May
1995330 Primary Facility 2011-08-11 Drilling/Alteration No Violations Noted No one on site. No well tags. 2 wells visible, 2 cellars covered with plastic and grating.
1996069 Primary Facility 2011-08-16 Drilling/Alteration No Violations Noted Workover rig on site, Stone Well Serv. Comp. Man - Rick  ?
1997165 Primary Facility 2011-08-18 Drilling/Alteration No Violations Noted Not working. Waiting on tools to fish as per Rick Fields.
1997648 Primary Facility 2011-08-22 Drilling/Alteration No Violations Noted Still not done. Pushed fish another 1000' down hole, but didn't get out.
1998930 Primary Facility 2011-08-25 Drilling/Alteration No Violations Noted Comp. Man - Rick Davidson
1999840 Primary Facility 2011-08-29 Drilling/Alteration No Violations Noted Talked to Rick Davidson. Finished cementing last night. Are now moving equip. off site & cleaning up. Getting ready to frac.
2009501 Primary Facility 2011-09-26 Drilling/Alteration No Violations Noted Fracing on Mirabelli 1 Keystone 2H and Mirabelli 1 1H
2038003 Primary Facility 2012-01-30 Routine/Complete Inspection No Violations Noted
2106548 Primary Facility 2012-09-20 Administrative/File Review Viol(s) Noted & Immediately Corrected
2205998 Primary Facility 2013-09-10 Routine/Complete Inspection No Violations Noted Specifics associated with this inspection can be referred to in the Mirabelli Unit Mirabelli 1 1H inspection report. Permit number is 131-20174. E-facts identification number is 2205880.
2335711 Primary Facility 2015-01-14 Drilling/Alteration No Violations Noted
2344349 Primary Facility 2015-02-04 Routine/Complete Inspection No Violations Noted H&P Rig #284 is the active drilling rig on the location. I met with Jacob Oettel, company man, of Warren E&P. Mr. Oettel stated that drilling procedures for the Mirabelli Unit 3H well have been just recently completed. The well has been drilled to total depth, which is around (12,800) feet. The Mirabelli 3H and the Mirabelli Keystone 1H wells have been drilled to a depth of (2,032) feet. The surface and intermediate casing has been cemented on each of these wells. It is not clear as to when Warren will return to the location to drill the wells to total depth.
2429731 Primary Facility 2015-12-03 Routine/Complete Inspection No Violations Noted
2474060 Primary Facility 2016-04-08 Routine/Complete Inspection No Violations Noted
2502861 Primary Facility 2016-07-20 Administrative/File Review In Compliance with Policy
2849660 Primary Facility 2019-02-04 Drilling/Alteration No Violations Noted I arrived at the site at 12:15. I was accompanied by Casey Baldwin, DEP O&G WQS out of the Scranton District Office. The weather conditions are partly cloudy skies, light winds, and mild with temperatures in the low to mid 50's. Precision Drilling Rig #532 is on the location. BKV submitted a Drilling Resumption After Break of 30 days or more Notification to the Department on 1/29/19. The notice indicated BKV would resume drillng of the Keystone Unit Mirabelli 1 Keystone 1H well at 6AM on 2/1/19. The surface and intermediate sections of this well, and the Keystone Unit Mirabelli 1-3H were drilled and cemented in 2015.

We met Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator (WPIT) of Whitetail Environmental Services, LLC, Gary Titus, site company man, consultant of BKV, Larry Gerard, Completions Superintendent, and Gary King, Drilling Superintendent, both consultants of BKV. The current drilling depth on the Mirabelli Keystone 1H well is (6,102) feet. BKV provided the following d

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2106548 651074 09/20/2012 2012-09-20 78.122 - Drillers Log not on site Administrative overdue well records

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
651074 289423 CACP - Consent Assessment of Civil Penalty Comply/Closed 2012-10-03 2012-10-03 $1,000.00 $1,000.00

For data sources see[9]

References