If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20214 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5975,"lon":-76.038167,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Meshoppen Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 149172 | |
Farm/Lease Name: REIMILLER UNIT REIMILLER 1 1H | |
License Status: | |
Spud Date: 2011-10-07 | |
Permit Date: 2011-09-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.5975 | |
Longitude: -76.038167 |
Date | Event |
---|---|
2011-09-16 | New Permit Application |
2011-10-07 | Performed Spud Operation |
2012-04-22 | Drilling Completion |
2013-05-27 | Perforation |
2013-06-20 | Performed Stimulation |
2013-09-18 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-27 | 2013-07-02 | 7,807 | 8,134,940 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CS 500SI | FTS | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10 | 0.001694 | 0 |
HCL | FTS | Acid | Hydrochloric acid | 7647-01-0 | 37 | 0.349172 | 0 | |
Water | FTS | carrier | H2O | 7732-18-5 | 100 | 85.901 | 0 | |
ShaleSurf 1000 | FTS | Surfactant | 2-Propanol | 67-63-0 | 10 | 0.008399 | 0 | |
Methanol | 67-56-1 | 10 | 0.008399 | 0 | ||||
Cyclohexene | 5989-27-5 | 10 | 0.008399 | 0 | ||||
Ethoxylated alcohol | Proprietary | 20 | 0.016798 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 10 | 0.008399 | 0 | ||||
ICI-3240 | FTS | Bacteriacide | Sodium Hydroxide | 1310-73-2 | 4 | 0.001683 | 0 | |
Dazomet | 533-74-4 | 24 | 0.010097 | 0 | ||||
Sand | FTS | Proppant | Silica | 14808-60-7 | 99.9 | 14.128 | 0 | |
FRW-600 | FTS | Friction Reducer | Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.009748 | 0 | |
Ammonium acetate | 631-61-8 | 6 | 0.00195 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-06-20 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CITRUS ENERGY CORP | 1,453,266.00 | 81 | 0.00 | 0 | 0.00 | 0 |
2014 | WARREN E & P INC | 4,421,626.49 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 3,156,682.97 | 312 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 2,544,192.91 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 1,993,632.26 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 1,724,398.96 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 1,487,825.15 | 349 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CITRUS ENERGY CORP | Drill Cuttings | 1,345.00 Tons | LANDFILL | THR029 |
2013 | CITRUS ENERGY CORP | Fracing Fluid Waste | 3,774.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | WARREN E & P INC | Produced Fluid | 48.43 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | WARREN E & P INC | Fracturing Fluid Waste | 7.80 Tons | LANDFILL | THR029 |
2014 | CITRUS ENERGY CORP | Produced Fluid | 978.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | WARREN E & P INC | Drill Cuttings | 9.20 Tons | LANDFILL | THR029 |
2015 | WARREN E & P INC | Produced Fluid | 229.87 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | WARREN E & P INC | Produced Fluid | 792.80 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 21.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 104.58 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Synthetic Liner Materials | 1.48 Tons | LANDFILL | THR029 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 33.77 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 253.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 263.42 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 259.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 1.10 Tons | LANDFILL | THR029 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 62.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 11.67 Bbl | REUSE (AT WELL PAD) | |
2017 | WARREN E & P INC | Produced Fluid | 529.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | WARREN E & P INC | Produced Fluid | 675.66 Bbl | REUSE (AT WELL PAD) | |
2018 | BKV OPR LLC | Synthetic Liner Materials | 1.31 Tons | LANDFILL | 101247 |
2018 | WARREN E & P INC | Produced Fluid | 149.07 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Other Oil & Gas Wastes | 44.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | WARREN E & P INC | Produced Fluid | 985.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Produced Fluid | 70.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Waste Water Treatment Sludge | 2.76 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 11.17 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 1,626.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 36.67 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Synthetic Liner Materials | 0.34 Tons | LANDFILL | 100933 |
2019 | BKV OPR LLC | Produced Fluid | 71.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2013563 | Primary Facility | 2011-10-25 | Drilling/Alteration | No Violations Noted | Site is not complete, currently working, but 20" cond. has been set. Cellar has not been dug yet. E&S plan was not in tube. |
2060076 | Primary Facility | 2012-04-09 | Drilling/Alteration | No Violations Noted | Patterson 61, Comp. Man - Joey Catlin @ 5159' |
2067014 | Primary Facility | 2012-05-07 | Routine/Complete Inspection | No Violations Noted | Rig has moved off. Still cleaning up site. |
2140050 | Primary Facility | 2013-02-13 | Routine/Complete Inspection | No Violations Noted | Needs ore permanent well tag. |
2332068 | Primary Facility | 2014-12-29 | Incident- Response to Accident or Event | No Violations Noted | Arrived at the site at 14:15 in response to an estimated (3.5) gallon spill of production fluid. Heather Burkhart and Kayla Saxon of Warren E&P accompanied me during the inspection. While at the site, Ms. Saxon explained that the spill occurred in the morning hours of 12/19/14 as a vacuum truck was in the process of backing up in preparation to offload production fluid from a frac tank in the tank battery. The truck driver noticed fluid spraying on the pad surface as he was backing up. The spill occurred as a result of a valve failing due to mechanical malfunction from the the scrubber to the muffler line on the truck. Residuals from the truck hose leaked onto the pad surface. The dimesions of the impacted area of the pad surface are (8.5-9.5) in length and (5) feet in width according to Ms. Saxon. Ms. Burkhart and Ms. Saxon informed me that the spill had been cleaned up and backfilled with fresh rock the day it occurred. There is no visual evidence of an impact to the pad surface where the release occurred. |
2430031 | Primary Facility | 2015-11-17 | Routine/Complete Inspection | No Violations Noted | A vacuum truck was in the process of unloading fluid from a frac tank on containment in the tank battery near the pad entrance. The fluid in this tank is either flowback or production fluid from the wells on the pad or a mixture of both. We used an Oakton MultiParameter PCSTester 35, Extech, ExStik2, and a Hanna Soil Test and Electrical Conductivity & Temperature meter to screen the water in the Production Fluid Storage Tanks and Gas Production Unit containment. Conductivity readings were in the range of (400-500) microSiemens/cm³ in water inside the production fluid tanks containment and (200-300) microSiemens/cm³ in water inside the GPU containment. The pH was around 8.4. |
2513479 | Primary Facility | 2016-08-23 | Routine/Complete Inspection | No Violations Noted | |
2605130 | Primary Facility | 2017-05-30 | Routine/Complete Inspection | No Violations Noted | I arrived at the location at 13:00. There was no activity or personnel at the site during the inspection. The weather conditions were cloudy skies with breezy conditions and temperatures in the low 60's. Rain had just ended. The Manning 1H, Reimiller 1H and Reynolds 1H wells are in production. I left the location at 13:45. |
For data sources see[9]