X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20224

Well Details

Well ID: 37-131-20224
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 148025
Farm/Lease Name: BENNETT UNIT MATTOCKS 1 BENNETT 1H
License Status:
Spud Date: 2011-10-26
Permit Date: 2011-09-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.576116
Longitude: -75.999863

For data sources see[1][2][3]

Well History

Date Event
2011-09-30 New Permit Application
2011-10-31 Performed Spud Operation
2012-02-05 Drilling Completion
2012-11-06 Perforation
2012-11-06 Performed Stimulation
2013-07-26 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-22 2012-10-22 7,002 6,202,938

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5-15 HCL Universal Well Services Acid Hydrochloric acid 7647-01-0 15.00
Water 7732-18-5 92.50 0.07
Unislik ST 50 Universal Well Services Friction Reducer Hydrotreated Light Distillate 30.00 0.05
Biocide EC 6116A Universal Well Services Biocide Dibromoacetonitrile 3252-43-5 5.00 0.03
Polyethylene glycol 25322-68-3 60.00
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00
SuperSurf Universal Well Services Surfactant
Methanol 67-56-1 60.00 0.09
SI-100 Universal Well Services Scale Inhibitor
Ethylene glycol 107-21-1 60.00 0.01

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-11-06 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 CITRUS ENERGY CORP 34,309.00 7 0.00 0 0.00 0
2013 CITRUS ENERGY CORP 2,371,861.00 296 0.00 0 0.00 0
2014 WARREN E & P INC 1,716,368.44 364 0.00 0 0.00 0
2015 WARREN E & P INC 1,011,178.55 349 0.00 0 0.00 0
2016 WARREN E & P INC 789,659.37 365 0.00 0 0.00 0
2017 WARREN E & P INC 962,445.69 363 0.00 0 0.00 0
2018 BKV OPR LLC 675,035.13 364 0.00 0 0.00 0
2019 BKV OPR LLC 512,232.23 349 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CITRUS ENERGY CORP Fracturing Fluid Waste 16.50 Tons LANDFILL THR029
2012 CITRUS ENERGY CORP Drill Cuttings 2,980.00 Tons LANDFILL THR029
2012 CITRUS ENERGY CORP Produced Fluid 8,221.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CITRUS ENERGY CORP Produced Fluid 5,014.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CITRUS ENERGY CORP Produced Fluid 347.82 Bbl REUSE OTHER THAN ROAD SPREADING
2015 WARREN E & P INC Produced Fluid 121.68 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 WARREN E & P INC Produced Fluid 210.50 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 95.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 113.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Produced Fluid 131.39 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 71.48 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 89.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 100.08 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 5.33 Tons LANDFILL THR029
2017 WARREN E & P INC Other Oil & Gas Wastes 28.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 373.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 51.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 WARREN E & P INC Produced Fluid 307.73 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Produced Fluid 55.93 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Other Oil & Gas Wastes 56.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Waste Water Treatment Sludge 1.30 Tons LANDFILL 301358
2018 WARREN E & P INC Produced Fluid 337.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Synthetic Liner Materials 2.35 Tons LANDFILL 100933
2019 BKV OPR LLC Waste Water Treatment Sludge 0.87 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Synthetic Liner Materials 0.22 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Produced Fluid 1,097.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Waste Water Treatment Sludge 0.40 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2013549 Primary Facility 2011-10-25 Drilling/Alteration Pending Zeigenfuss on site working. Well name and permit # not on site sign. Vio 58 PS 201(g)
2017960 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted Site sign has been corrected.
2036640 Primary Facility 2012-01-23 Drilling/Alteration No Violations Noted Patterson UTI Rig 61, Comp. Man - Joey Catlin
2038889 Primary Facility 2012-02-01 Routine/Complete Inspection No Violations Noted
2039234 Primary Facility 2012-01-30 Drilling/Alteration No Violations Noted Patterson UTI 61 , Comp. Man - Dale Barnett , Drilling at 9769'
2078941 Primary Facility 2012-06-26 Routine/Complete Inspection No Violations Noted
2109875 Primary Facility 2012-10-23 Routine/Partial Inspection No Violations Noted
2126625 Primary Facility 2012-12-11 Routine/Complete Inspection No Violations Noted Specifics associated with this inspection report can be referred to in the Mattocks Unit Mattocks (1) 1H inspection report. Permit number is 131-20220.
2420797 Primary Facility 2015-10-29 Routine/Complete Inspection No Violations Noted
2748997 Primary Facility 2018-06-20 Routine/Complete Inspection No Violations Noted I arrived at the site at 13:16. Personnel from J.P. Reilly and Associates were departing from the site as I arrived. The weather conditions are partly sunny skies with light winds and temperatures in the mid 70's. There was no activity or additional personnel at the site during the inspection. A service rig recently conducted work-over operations at this site similar to the operations conducted at the BKV Ruark South and Macialek pads. For additional information regarding the work-over operations, refer to the Department's 6-13-18 inspection reports for the Ruark South and Macialek pads, inspection ID #'s 2743281 and 2744324. The rig has moved to the nearby BKV Procter & Gamble (1) pad. The secondary containment and frac tank as part of the work-over operations remain in place on this pad. The wells are in production. I used a blue Hanna HI 9831 Soil Test Electrical Conductivity (EC) & Temperature meter, and white Hanna HI 9831 Groline Soil Test meter to conduct field screening of specific conductanc
2755677 Primary Facility 2018-07-10 Routine/Complete Inspection No Violations Noted I conducted the inspection accompanied by Jon Sassi (EPS). There was no activity occurring at the site. If you have any questions concerning this inspection, please contact me.

For data sources see[9]

References