If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.576116,"lon":-75.999863,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 148025 | |
Farm/Lease Name: BENNETT UNIT MATTOCKS 1 BENNETT 1H | |
License Status: | |
Spud Date: 2011-10-26 | |
Permit Date: 2011-09-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.576116 | |
Longitude: -75.999863 |
Date | Event |
---|---|
2011-09-30 | New Permit Application |
2011-10-31 | Performed Spud Operation |
2012-02-05 | Drilling Completion |
2012-11-06 | Perforation |
2012-11-06 | Performed Stimulation |
2013-07-26 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-10-22 | 2012-10-22 | 7,002 | 6,202,938 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 7.5-15 HCL | Universal Well Services | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | ||
Water | 7732-18-5 | 92.50 | 0.07 | |||||
Unislik ST 50 | Universal Well Services | Friction Reducer | Hydrotreated Light Distillate | 30.00 | 0.05 | |||
Biocide EC 6116A | Universal Well Services | Biocide | Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.03 | ||
Polyethylene glycol | 25322-68-3 | 60.00 | ||||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | ||||||
SuperSurf | Universal Well Services | Surfactant | ||||||
Methanol | 67-56-1 | 60.00 | 0.09 | |||||
SI-100 | Universal Well Services | Scale Inhibitor | ||||||
Ethylene glycol | 107-21-1 | 60.00 | 0.01 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-11-06 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CITRUS ENERGY CORP | 34,309.00 | 7 | 0.00 | 0 | 0.00 | 0 |
2013 | CITRUS ENERGY CORP | 2,371,861.00 | 296 | 0.00 | 0 | 0.00 | 0 |
2014 | WARREN E & P INC | 1,716,368.44 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 1,011,178.55 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 789,659.37 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 962,445.69 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 675,035.13 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 512,232.23 | 349 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CITRUS ENERGY CORP | Fracturing Fluid Waste | 16.50 Tons | LANDFILL | THR029 |
2012 | CITRUS ENERGY CORP | Drill Cuttings | 2,980.00 Tons | LANDFILL | THR029 |
2012 | CITRUS ENERGY CORP | Produced Fluid | 8,221.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CITRUS ENERGY CORP | Produced Fluid | 5,014.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CITRUS ENERGY CORP | Produced Fluid | 347.82 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | WARREN E & P INC | Produced Fluid | 121.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | WARREN E & P INC | Produced Fluid | 210.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 95.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 113.34 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 131.39 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 71.48 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 89.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 100.08 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 5.33 Tons | LANDFILL | THR029 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 28.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 373.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 51.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | WARREN E & P INC | Produced Fluid | 307.73 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Produced Fluid | 55.93 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Other Oil & Gas Wastes | 56.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Waste Water Treatment Sludge | 1.30 Tons | LANDFILL | 301358 |
2018 | WARREN E & P INC | Produced Fluid | 337.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 2.35 Tons | LANDFILL | 100933 |
2019 | BKV OPR LLC | Waste Water Treatment Sludge | 0.87 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 0.22 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 1,097.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Waste Water Treatment Sludge | 0.40 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2013549 | Primary Facility | 2011-10-25 | Drilling/Alteration | Pending | Zeigenfuss on site working. Well name and permit # not on site sign. Vio 58 PS 201(g) |
2017960 | Primary Facility | 2011-11-03 | Routine/Complete Inspection | No Violations Noted | Site sign has been corrected. |
2036640 | Primary Facility | 2012-01-23 | Drilling/Alteration | No Violations Noted | Patterson UTI Rig 61, Comp. Man - Joey Catlin |
2038889 | Primary Facility | 2012-02-01 | Routine/Complete Inspection | No Violations Noted | |
2039234 | Primary Facility | 2012-01-30 | Drilling/Alteration | No Violations Noted | Patterson UTI 61 , Comp. Man - Dale Barnett , Drilling at 9769' |
2078941 | Primary Facility | 2012-06-26 | Routine/Complete Inspection | No Violations Noted | |
2109875 | Primary Facility | 2012-10-23 | Routine/Partial Inspection | No Violations Noted | |
2126625 | Primary Facility | 2012-12-11 | Routine/Complete Inspection | No Violations Noted | Specifics associated with this inspection report can be referred to in the Mattocks Unit Mattocks (1) 1H inspection report. Permit number is 131-20220. |
2420797 | Primary Facility | 2015-10-29 | Routine/Complete Inspection | No Violations Noted | |
2748997 | Primary Facility | 2018-06-20 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 13:16. Personnel from J.P. Reilly and Associates were departing from the site as I arrived. The weather conditions are partly sunny skies with light winds and temperatures in the mid 70's. There was no activity or additional personnel at the site during the inspection. A service rig recently conducted work-over operations at this site similar to the operations conducted at the BKV Ruark South and Macialek pads. For additional information regarding the work-over operations, refer to the Department's 6-13-18 inspection reports for the Ruark South and Macialek pads, inspection ID #'s 2743281 and 2744324. The rig has moved to the nearby BKV Procter & Gamble (1) pad. The secondary containment and frac tank as part of the work-over operations remain in place on this pad. The wells are in production. I used a blue Hanna HI 9831 Soil Test Electrical Conductivity (EC) & Temperature meter, and white Hanna HI 9831 Groline Soil Test meter to conduct field screening of specific conductanc |
2755677 | Primary Facility | 2018-07-10 | Routine/Complete Inspection | No Violations Noted | I conducted the inspection accompanied by Jon Sassi (EPS). There was no activity occurring at the site. If you have any questions concerning this inspection, please contact me. |
For data sources see[9]