If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20237 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.578709,"lon":-75.989159,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 149169 | |
Farm/Lease Name: REEL UNIT MACIALEK 1 REEL 1H | |
License Status: | |
Spud Date: 2013-01-13 | |
Permit Date: 2012-01-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.578709 | |
Longitude: -75.989159 |
Date | Event |
---|---|
2012-01-31 | New Permit Application |
2013-01-09 | Performed Spud Operation |
2013-12-20 | New Permit Application |
2014-02-27 | Drilling Completion |
2014-03-21 | Perforation |
2014-03-21 | Performed Stimulation |
2015-11-09 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-03-21 | 2014-03-29 | 7,791 | 7,279,060 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | FTS | Proppant | Silica | 14808-60-7 | 99.9 | 13.3066 | 0 |
Water | FTS | carrier | H2O | 7732-18-5 | 100 | 85.737 | 0 | |
ICI-3240 | FTS | Bacteriacide | Dazomet | 533-74-4 | 24 | 0.007596 | 0 | |
Sodium Hydroxide | 1310-73-2 | 4 | 0.001266 | 0 | ||||
HCL | FTS | Acid | Hydrochloric acid | 7647-01-0 | 37 | 0.313782 | 0 | |
CS 500SI | FTS | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10 | 0.001728 | 0 | |
FRW-600 | FTS | Friction Reducer | Ammonium acetate | 631-61-8 | 6 | 0.002454 | 0 | |
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.012272 | 0 | ||||
CI-150 | FTS | Acid Corrosion Inhibitor | Dimethylformamide | 68-12-2 | 10 | 0.000509 | 0 | |
Quanternary ammonium compound | Proprietary | 10 | 0.000509 | 0 | ||||
Isopropanol | 67-63-0 | 30 | 0.001527 | 0 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.000509 | 0 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.001527 | 0 | ||||
Organice amine resin | Proprietary | 30 | 0.001527 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-03-21 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | WARREN E & P INC | 246,654.58 | 204 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 354,945.36 | 360 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 277,395.28 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 274,499.78 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 239,108.72 | 345 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 231,887.74 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CITRUS ENERGY CORP | Drill Cuttings | 1,453.00 Tons | LANDFILL | THR029 |
2014 | CITRUS ENERGY CORP | Fracturing Fluid Waste | 26.00 Tons | LANDFILL | THR029 |
2014 | CITRUS ENERGY CORP | Produced Fluid | 2,437.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | WARREN E & P INC | Produced Fluid | 11,022.70 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | WARREN E & P INC | Produced Fluid | 2,370.46 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | WARREN E & P INC | Produced Fluid | 10,347.70 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 22.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 3,392.59 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 241.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 11.81 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 20.53 Tons | LANDFILL | THR029 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 139.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 2,875.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 1,103.11 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | WARREN E & P INC | Produced Fluid | 2,648.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 166.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | WARREN E & P INC | Produced Fluid | 1,301.45 Bbl | REUSE (AT WELL PAD) | |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 64.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Produced Fluid | 108.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | WARREN E & P INC | Produced Fluid | 390.35 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Other Oil & Gas Wastes | 34.80 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Waste Water Treatment Sludge | 0.25 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | WARREN E & P INC | Produced Fluid | 3,746.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 166.00 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 107.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Produced Fluid | 3,566.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2133600 | Primary Facility | 2013-01-25 | Drilling/Alteration | Pending | No one on site. 2 half rounds (empty) and backhoe on site. Cond and rathole complete, but cellar is not dug out. |
2165710 | Primary Facility | 2013-05-13 | Routine/Complete Inspection | No Violations Noted | |
2243432 | Primary Facility | 2014-02-06 | Drilling/Alteration | No Violations Noted | Precision 528, Comp Man - Jake Oetel, @ 2750' |
2247735 | Primary Facility | 2014-02-21 | Drilling/Alteration | No Violations Noted | Precision 528, Comp Man - Jay Lewis, @ 12915' TD |
2264409 | Primary Facility | 2014-04-09 | Routine/Complete Inspection | No Violations Noted | Flowback procedures were in progress for the Reel Unit Macialek 1 Reel 1H well. The Macialek Unit Macialek 1 1H well is in production. Flowback procedures commenced on 4/7/14 according to Citrus. The flowback process has not returned any gas to the surface as of yet. An in line heater, separation unit and gas buster tank staged on secondary containment are utilized for the flowback process. Flowback water is transferred to frac tanks in the frac tank battery on location next to the Pad berm. According to Citrus, most of the frac tanks are empty. Upon filling the tanks with flowback water, the tanks will be transported to the P&G (5) Well Pad for reuse as well stimulation procedures are on-going for the PREVOST UNIT P&G 5 PREVOST 1H and RUARK UNIT P&G 5 RUARK 4H wells. There were some areas of compromised integrity in the frac tank battery secondary containment system. |
2331139 | Primary Facility | 2014-12-23 | Routine/Partial Inspection | No Violations Noted | |
2427401 | Primary Facility | 2015-11-17 | Routine/Complete Inspection | No Violations Noted | Conducted an investigation of the collected stormwater to determine the composition of fluid found in containment of Production Fluid Storage Area. Field analysis of stormwater measured 500 microSiemens in containment area. A sample of the accumulated storm water was collected for Sample Suite 046 (3809-117) |
2744897 | Primary Facility | 2018-06-13 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 13:43. The weather conditions are cloudy skies with light winds and temperatures around 70 degrees Fahrenheit. There was no activity or personnel at the site. The Macialek 1H and Macialek- Reel 1H wells are in the production phase of operations. A service rig performing similar workover operations on the Ruark South Pad, has recently moved off this location according to Reilly and BKV personnel during the Department's inspection at the BKV Ruark South Pad on 6/13/18, inspection ID# 2743281. The secondary containment dedicated for work-over operations remains in place. A frac tank most likely containing production fluid generated from BKV wells and used during the work-over process, also remains in place. I observed a petroleum sheen on containment near the Macialek Reel 1H well. I used a blue Hanna HI 9831 Soil Test EC & Temperature meter, and white Hanna HI 9831 Groline Soil Test meter to conduct field screening of specific conductance (conductivity) of water on secondary |
2754150 | Primary Facility | 2018-07-10 | Follow-up Inspection | No Violations Noted | Matt Shope, DEP O&G WQS and I arrived at the site at 12:08 to conduct a follow-up inspection. The weather conditions are mostly sunny skies, warm and humid, with light winds and temperatures in the mid 80's. There was no activity or personnel at the site during the inspection. The most recent inspection conducted by the Department was on 6/13/18. During the 6/13/18 inspection, I discovered a petroleum sheen on the secondary containment near the wellheads, along with elevated conductivity readings in water in containment near the wellheads and containment unit for a frac tank. For additional details refer to the Department's 6-13-18 inspection report, inspection ID # 2744324. The frac tank and secondary containment have been removed from the site. Conductivity levels were elevated in water in the production fluid tanks containment unit and in the Macialek-Reel 1H well cellar. See photos. The Department left the site at 12:59. |
For data sources see[9]