X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20248

Well Details

Well ID: 37-131-20248
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Lemon Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145704
Farm/Lease Name: GARRISON NORTH UNIT 2H
License Status:
Spud Date: 2013-08-11
Permit Date: 2012-11-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.625039
Longitude: -75.937889

For data sources see[1][2][3]

Well History

Date Event
2012-11-30 New Permit Application
2013-07-11 New Permit Application
2013-08-13 Performed Spud Operation
2013-09-13 Drilling Completion
2014-01-23 Perforation
2014-03-25 Performed Stimulation
2015-01-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-25 2014-04-03 7,738 13,684,500

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BA-40L Halliburton Buffering Agent Potassium Carbonate 584-08-7 60 0.0001 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.08 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.87 0
MCB-8614 MULTI-CHEM BIOCIDE ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0
GLUTARALDEHYDE 111-30-8 30 0.02 0
MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.005 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-03-25 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 1,650,310.00 114 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 4,350,506.37 364 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 3,917,912.79 364 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 1,821,803.24 365 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,293,486.28 362 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,402,055.34 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Drill Cuttings 1,422.17 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 216.88 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Produced Fluid 3,334.86 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 1,349.40 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste 1,260.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Produced Fluid 1,308.82 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 254.60 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 61.57 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 162.98 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 265.67 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2196272 Primary Facility 2013-08-16 Drilling/Alteration Pending Patterson 254, Comp Man - Billy Swanson
2200830 Primary Facility 2013-08-30 Drilling/Alteration No Violations Noted Patterson 254, Comp. Man - Billy Swanson, @ 12,471'
2203757 Primary Facility 2013-09-06 Drilling/Alteration No Violations Noted Patterson 254, Comp. Man - Rafael Vales, @ 15942'
2215682 Primary Facility 2013-08-14 Drilling/Alteration No Violations Noted
2252934 Primary Facility 2014-03-12 Drilling/Alteration No Violations Noted Incedent investigation: Incedent occured 3/11 in evening. Two men entered frac tank to clean(did not follow confined entry protocal). Fracing was going on on the pad. After perforating stage 4, fluid( fresh water) and pressure on the lubricator was flowed back into the same frac tank.
2505881 Primary Facility 2016-07-27 Routine/Complete Inspection No Violations Noted
2546008 Primary Facility 2016-12-19 Routine/Complete Inspection No Violations Noted
2713314 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted Arrived at site at: 08:30. Weather: Overcast, cold ~ 35 degs. Onsite to perform routine inspections of wells on pad. A total of (9) wells were present on pad. All (9) wells were in production at time of inspection. All wells Prod. tree top press. "PTTP", Prod. line press. "PLP" and Prod. casing press. "PCP" were being monitored by wireless data sending units and/or analog gauges. (See individual well pressures and observations listed below.)

- All wells had (2) annular vents present labeled (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2"). All annular vents were open and venting to (3) poly vent tanks "VTs" via shared 2" vent lines. I labeled the VTs with a black magic marker at time of inspection. (#1 VT shares the 2H, 5H, 3H & N1H annular vents. #2 VT shares the N4H, N2H & N3H annular vents. #3 VT shares the 1H & 4H annular vents.) I performed gas checks at VT lid openings using a Altair 5X gas meter calibrated on 3/5/18. Gas checks showed: VT #1 = 48% LEL, 2% CH4; VT #2 = 10% LEL, 0% CH4; VT #3 = 40% LEL, 2% CH4.

2743694 Primary Facility 2018-06-12 Routine/Complete Inspection No Violations Noted "Pump-down" operations were being conducted by Halliburton Oilfield Services on the 1H well. There were no violations noted. If you have any questions, please contact me.
2804615 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted Chief Oil & Gas submitted a Notice of Termination (NOT) for the Garrison pad covered under ESX29-131-17-0003. The NOT was received by the Department on 9/27/18. Arrived onsite for at 10:35; the weather was ~30°F and calm. Several frozen puddles were on the pad surface.

There were 9 properly tagged Marcellus wells staged for production. Most of the well cellars were filled with water; no bubbling was observed. There were 9 GPUs and 1 compressor onsite and in secondary containment. There was approx. 6 to 12 inches of mostly frozen water in the produced water tank secondary containment. Secondary containment also remained around the wells. I contacted Chris Vassallo via email and was informed on 11/16/18 that the containment is there due to scheduled maintenance on one of the wells.

The site was well vegetated and appeared stable. All PCSM had been constructed and no temporary E&S BMPs remained.

It is recommended that secondary containment around the produced water tanks be monitored and the water removed a

For data sources see[9]

References