If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20296 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.604308,"lon":-75.955503,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Lemon Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145167 | |
Farm/Lease Name: PLUSHANSKI EAST 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-05-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.604308 | |
Longitude: -75.955503 |
Date | Event |
---|---|
2013-05-20 | New Permit Application |
2013-05-24 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-05 | 2014-05-11 | 7,776 | 9,841,150 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 30/50 | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.13503 | 5,745,100.0 |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0287118 | 26886.9 | |
Water | 7732-18-5 | 85 | 0.1627 | 152359 | ||||
Alpha 1427 | Baker Hughes | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.0070528 | 6604.5 | |
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0023509 | 2201.5 | ||||
Ethanol | 64-17-5 | 5 | 0.0011755 | 1100.75 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0011755 | 1100.75 | ||||
CI-14 | Baker Hughes | Corrosion Inhibitor | Propargyl Alcohol | 107-19-7 | 5 | 0.00006970 | 65.25 | |
Olefin | Trade Secret | 5 | 0.00006970 | 65.25 | ||||
Polyoxyalkylenes | Trade Secret | 30 | 0.0004181 | 391.5 | ||||
Methanol | 67-56-1 | 100 | 0.0013936 | 1305 | ||||
Fatty Acids | Trade Secret | 10 | 0.0001394 | 130.5 | ||||
Other Chemicals | Oleamide DEA | 93-83-4 | 0 | 0.0018736 | 1754.56 | |||
Ammonium Chloride | 12125-02-9 | 0 | 0.0028105 | 2631.84 | ||||
Formaldehyde | 50-00-0 | 0 | 0.00001390 | 13.05 | ||||
Water | 7732-18-5 | 0 | 0.0616206 | 57704.1 | ||||
Hydrochloric Acid | 7647-01-0 | 0 | 0.00001390 | 13.05 | ||||
Modified Thiorea Polymer | 68527-49-1 | 0 | 0.00009760 | 91.35 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0 | 0.0004684 | 438.641 | ||||
Polyacrylate | Trade Secret | 0 | 0.0032358 | 3030.17 | ||||
Alcohols, C12-16, ethoxylated | Trade Secret | 0 | 0.0018736 | 1754.56 | ||||
Potassium Chloride | 7447-40-7 | 0 | 0.0001618 | 151.509 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | Trade Secret | 0 | 0.0281047 | 26318.4 | ||||
Sorbitan Monooleate | Trade Secret | 0 | 0.0004684 | 438.641 | ||||
Sodium Chloride | 7647-14-5 | 0 | 0.0001618 | 151.509 | ||||
HCl, 5.1 - 7.5% | Baker Hughes | Acidizing | Water | 7732-18-5 | 92.5 | 0.477467 | 447120 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0387135 | 36252.9 | ||||
Sand, White, 40/70 | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.60082 | 4,308,400.0 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Calcium Chloride | 10043-52-4 | 2 | 0.0003236 | 303.017 | |
Ethylene Glycol | 107-21-1 | 30 | 0.0048538 | 4545.26 | ||||
FRW-18 | Baker Hughes | Friction Reducer | Petroleum Distillates | 64742-47-8 | 30 | 0.0281047 | 26318.4 | |
Sand, White, 100 mesh | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.778372 | 728900 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 87.6227 | 82,053,500.0 | |
InFlo 250W | Baker Hughes | Surfactant | Surfactants | Trade Secret | 80 | 0.0006696 | 627.003 | |
2-Butoxyethanol | 111-76-2 | 5 | 0.00004180 | 39.1877 | ||||
Methanol | 67-56-1 | 30 | 0.0002511 | 235.126 | ||||
Ferrotrol 300L | Baker Hughes | Iron Control | Citric Acid | 77-92-9 | 60 | 0.0018174 | 1701.91 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 221,585.19 | 117 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 1,629,706.88 | 296 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 2,240,949.67 | 323 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 1,303,939.10 | 331 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 981,107.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 1,183,721.91 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 1,350.16 Tons | LANDFILL | THR029 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 679.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 66.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 3,528.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 86,261.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 83,092.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Basic Sediment | 58.08 Bbl | LANDFILL | THR029 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,455.91 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 2,423.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,224.16 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 2,280.37 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015 | CARRIZO (MARCELLUS) LLC | Fracing Fluid Waste | 29.30 Bbl | LANDFILL | THR029 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 4,991.19 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 6.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 252.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 23.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 802.31 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,976.72 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 609.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 139.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 360.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 13.93 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 807.89 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 510.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 171.62 Bbl | REUSE (AT WELL PAD) | |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 600.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 211.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 14.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 123.69 Bbl | REUSE (AT WELL PAD) | |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 855.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 15.14 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 0.55 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 779.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2171364 | Primary Facility | 2013-05-31 | Drilling/Alteration | No Violations Noted | 20" cond set. Need site sign. |
2180077 | Primary Facility | 2013-06-24 | Routine/Complete Inspection | No Violations Noted | The main intent of my inspection was to view the dewatering of solids during top-hole drilling operations. On 6/26/13 Carrizo submitted a request for an alternative waste management practice (OG-71) for this process to the Department. The system was running during the inspection. The process invloves a belt press filter system and a mixing/conditioning tank with the additon of a polymer to aid in the seperation of solids and liquids in the drill cuttings as they are blown out of the wellbore. All solid material generated from this process and temporarily held in roll-off containers onsite, will be disposed of at Alliance Landfill in Taylor, PA. The liquid material will be held onsite in frac tanks after the treatment process to be either reused during well drilling or transported offsite to another Well Pad to be used during completions. The OG-71 template contained a description of the process, an illustration of the operation and MSD sheets for Hyperfloc CE 800, which is the polymer utilized in the treatment process. |
2185733 | Primary Facility | 2013-07-15 | Drilling/Alteration | No Violations Noted | Falcon 25, Comp. Man - Al Letsinger |
2221123 | Primary Facility | 2013-11-08 | Drilling/Alteration | No Violations Noted | Nabors M 61, Comp Man - Skip McClelland, @ 7972' |
2258186 | Primary Facility | 2014-03-27 | Routine/Complete Inspection | Pending | Bubbles in cellar - dirty water. |
2332360 | Primary Facility | 2014-12-12 | Routine/Complete Inspection | No Violations Noted | A Consolidated wellhead Service Rig was on the location in the process of cleaning out and setting kill plugs for the Plushanski West 2H well according to Mr. Robichaux. Freshwater and production fluid transported to the site from permitted wells on other Carrizo locations is used in the process of cleaning out the well. My meter indicated over the limit conductivity readings in water on containment next to the frac tank battery containment berm. Mr. Robichaux indicated residuals from a fluid hose was spilled on the containment as the hose was broke down from the frac tank. He will have a vacuum truck remove the fluid off containment. Production fluid is stored in the frac tanks and freshwater is stored in the frac tanks covered with plastic sheeting. A heating pump is used to prevent the water from freezing inside the tanks. I observed (2) small areas of staining in the snow on containment below the heating unit. I also observed a small pool of diesel fuel in containment on the access road. |
2347269 | Primary Facility | 2015-02-15 | Routine/Partial Inspection | No Violations Noted | |
2518703 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | |
2530909 | Primary Facility | 2016-10-25 | Administrative/File Review | In Compliance with Policy | |
2605374 | Primary Facility | 2017-06-15 | Routine/Complete Inspection | No Violations Noted |
For data sources see[8]