X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20488

Well Details

Well ID: 37-131-20488
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 145198
Farm/Lease Name: MIRABELLI UNIT MIRABELLI 11H
License Status: Active
Spud Date: 2015-01-01
Permit Date: 2014-11-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.604124
Longitude: -76.005408

For data sources see[1][2][3]

Well History

Date Event
2014-11-26 New Permit Application
2014-12-06 Performed Spud Operation
2015-01-19 Drilling Completion
2015-07-20 Perforation
2015-07-20 Performed Stimulation
2015-12-04 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-20 2015-07-25 7,587 5,677,690 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRW-1000 FTSI Friction Reducer - Cationic PETROLEUM HYDROTREATED LIGHT DISTILLATE 64742-47-8 25 0.0125737 7069.5
FE-100L FTSI Scale Inhibitor Ethylene glycol 107-21-1 10 0.000157192 88.38
Water 7732-18-5 60 0.00094315 530.28
NE-100 FTSI Non-emulsifier Benzene, C10-16 Alkyl Derivatives 68648-87-3 0.04 0.00000056 0.31
Water 7732-18-5 90 0.00118998 669.06
Unsulphonated Matter Proprietary 0.03 0.00000037 0.21
Sulfur Dioxide 7446-09-5 0 0.00000002 0.01
Sulfuric Acid 7664-93-9 0.01 0.00000019 0.1
2-Butoxyethanol 111-76-2 10 0.00013222 74.34
2-Propanol 67-63-0 10 0.00013222 74.34
Dodecylbenzenesulfonic acid 27176-87-0 5 0.00006611 37.17
Plexaid 680 FTSI Scale Inhibitor ORGANICPHOSPHONIC ACIDS SALTS Trade Secret 20 0.00351093 1974
Methyl Alcohol 67-56-1 15 0.0026332 1480.5
Water 7732-18-5 80 0.0140437 7896
Sodium Chloride 7647-14-5 5 0.000877734 493.5
Hydrochloric Acid (HCl) FTSI Acid Hydrogen Chloride 7647-01-0 37 0.275109 154679
Water 7732-18-5 63 0.46843 263372
40/70 White FTSI proppant Silica, Quartz 14808-60-7 100 12.2144 6,867,480.0
100 Mesh Sand FTSI proppant Silica, Quartz 14808-60-7 100 2.71178 1,524,680.0
Water Operator Carrier Water 7732-18-5 100 86.35 53,940,400.0
ICI-3240 FTSI Biocide Water 7732-18-5 55 0.0208932 11747
Sodium Hydroxide 1310-73-2 23 0.00873714 4912.4
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,
3, 5-thiadiazine-2-thione.
533-74-4 24 0.00911701 5125.98
CI-150 FTSI Acid Corrosion Inhibitor Dimethylformamide 68-12-2 10 0.00019689 110.7
Alkylene Oxide Block Polymer Proprietary 10 0.00019689 110.7
Aromatic aldehyde Proprietary 10 0.00019689 110.7
Quaternary ammonium compound Proprietary 10 0.00019689 110.7
Fatty Acid Salt Proprietary 0.1 0.00000197 1.11
Isopropanol 67-63-0 30 0.000590669 332.1
Water 7732-18-5 5 0.00009844 55.35
Aliphatic alcohol Proprietary 0.1 0.00000197 1.11
Organic amine resin salt Proprietary 30 0.000590669 332.1
Diethylene glycol 111-46-6 1 0.00001969 11.07
Ethylene Glycol 107-21-1 30 0.000590669 332.1
Fatty Acid Proprietary 0.1 0.00000197 1.11

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-07-20 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 WARREN E & P INC 0.00 0 0.00 0 0.00 0
2015 WARREN E & P INC 653,813.93 148 0.00 0 0.00 0
2016 WARREN E & P INC 808,826.71 364 0.00 0 0.00 0
2017 WARREN E & P INC 531,486.64 364 0.00 0 0.00 0
2018 BKV OPR LLC 424,357.59 363 0.00 0 0.00 0
2019 BKV OPR LLC 354,834.44 264 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 WARREN E & P INC Drill Cuttings 1,116.52 Tons LANDFILL THR029
2015 WARREN E & P INC Produced Fluid 6,612.85 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 WARREN E & P INC Produced Fluid 75.20 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015 WARREN E & P INC Fracing Fluid Waste 7,841.88 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 75.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 120.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Synthetic Liner Materials 0.10 Tons LANDFILL THR029
2016 WARREN E & P INC Other Oil & Gas Wastes 13.22 Tons LANDFILL THR029
2016 WARREN E & P INC Produced Fluid 329.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 WARREN E & P INC Other Oil & Gas Wastes 36.99 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 1,001.33 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 696.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 2,092.87 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2017 WARREN E & P INC Other Oil & Gas Wastes 37.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 614.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 522.04 Bbl REUSE (AT WELL PAD)
2017 WARREN E & P INC Produced Fluid 21.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 BKV OPR LLC Other Oil & Gas Wastes 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 BKV OPR LLC Produced Fluid 21.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 WARREN E & P INC Produced Fluid 177.94 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Other Oil & Gas Wastes 36.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Waste Water Treatment Sludge 0.08 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 BKV OPR LLC Produced Fluid 9.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 WARREN E & P INC Produced Fluid 951.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Soil Contaminated by Oil 10.85 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Synthetic Liner Materials 2.46 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Soil Contaminated by Oil & Gas Related Spills 10.85 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Synthetic Liner Materials 5.28 Tons LANDFILL 101247
2019 BKV OPR LLC Produced Fluid 15.00 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 2,420.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2335702 Primary Facility 2015-01-14 Drilling/Alteration No Violations Noted
2344385 Primary Facility 2015-02-04 Routine/Complete Inspection No Violations Noted H&P Rig #284 is the active drilling rig on the location. I met with Jacob Oettel, company man, of Warren E&P. Mr. Oettel stated that drilling procedures for the Mirabelli Unit 3H well have been just recently completed. The well has been drilled to total depth, which is around (12,800) feet. The Mirabelli 3H and the Mirabelli Keystone 1H wells have been drilled to a depth of (2,032) feet. The surface and intermediate casing has been cemented on each of these wells. It is not clear as to when Warren will return to the location to drill the wells to total depth.
2344389 Primary Facility 2015-02-04 Routine/Complete Inspection No Violations Noted H&P Rig #284 is the active drilling rig on the location. I met with Jacob Oettel, company man, of Warren E&P. Mr. Oettel stated that drilling procedures for the Mirabelli Unit 3H well have been just recently completed. The well has been drilled to total depth, which is around (12,800) feet. The Mirabelli 3H and the Mirabelli Keystone 1H wells have been drilled to a depth of (2,032) feet. The surface and intermediate casing has been cemented on each of these wells. It is not clear as to when Warren will return to the location to drill the wells to total depth.
2429738 Primary Facility 2015-12-03 Routine/Complete Inspection No Violations Noted Sample collected from Production Fluid Storage Tank Containment Area (3809-123).
2437023 Primary Facility 2015-01-04 Follow-up Inspection No Violations Noted
2474067 Primary Facility 2016-04-08 Routine/Complete Inspection No Violations Noted
2503008 Primary Facility 2016-07-20 Administrative/File Review In Compliance with Policy
2601470 Primary Facility 2017-06-02 Routine/Complete Inspection No Violations Noted Workmen were installing a compressor at the site during the inspection. If there are questions regarding this report please contact me.
2849724 Primary Facility 2019-02-04 Drilling/Alteration No Violations Noted I arrived at the site at 12:15. I was accompanied by Casey Baldwin, DEP O&G WQS out of the Scranton District Office. The weather conditions are partly cloudy skies, light winds, and mild with temperatures in the low to mid 50's. Precision Drilling Rig #532 is on the location. BKV submitted a Drilling Resumption After Break of 30 days or more Notification to the Department on 1/29/19. The notice indicated BKV would resume drillng of the Keystone Unit Mirabelli 1 Keystone 1H well at 6AM on 2/1/19. The surface and intermediate sections of this well, and the Keystone Unit Mirabelli 1-3H were drilled and cemented in 2015.

We met Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator (WPIT) of Whitetail Environmental Services, LLC, Gary Titus, site company man, consultant of BKV, Larry Gerard, Completions Superintendent, and Gary King, Drilling Superintendent, both consultants of BKV. The current drilling depth on the Mirabelli Keystone 1H well is (6,102) feet. BKV provided the following d

For data sources see[9]

References