If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.604124,"lon":-76.005408,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145198 | |
Farm/Lease Name: MIRABELLI UNIT MIRABELLI 11H | |
License Status: Active | |
Spud Date: 2015-01-01 | |
Permit Date: 2014-11-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.604124 | |
Longitude: -76.005408 |
Date | Event |
---|---|
2014-11-26 | New Permit Application |
2014-12-06 | Performed Spud Operation |
2015-01-19 | Drilling Completion |
2015-07-20 | Perforation |
2015-07-20 | Performed Stimulation |
2015-12-04 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-20 | 2015-07-25 | 7,587 | 5,677,690 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRW-1000 | FTSI | Friction Reducer - Cationic | PETROLEUM HYDROTREATED LIGHT DISTILLATE | 64742-47-8 | 25 | 0.0125737 | 7069.5 |
FE-100L | FTSI | Scale Inhibitor | Ethylene glycol | 107-21-1 | 10 | 0.000157192 | 88.38 | |
Water | 7732-18-5 | 60 | 0.00094315 | 530.28 | ||||
NE-100 | FTSI | Non-emulsifier | Benzene, C10-16 Alkyl Derivatives | 68648-87-3 | 0.04 | 0.00000056 | 0.31 | |
Water | 7732-18-5 | 90 | 0.00118998 | 669.06 | ||||
Unsulphonated Matter | Proprietary | 0.03 | 0.00000037 | 0.21 | ||||
Sulfur Dioxide | 7446-09-5 | 0 | 0.00000002 | 0.01 | ||||
Sulfuric Acid | 7664-93-9 | 0.01 | 0.00000019 | 0.1 | ||||
2-Butoxyethanol | 111-76-2 | 10 | 0.00013222 | 74.34 | ||||
2-Propanol | 67-63-0 | 10 | 0.00013222 | 74.34 | ||||
Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00006611 | 37.17 | ||||
Plexaid 680 | FTSI | Scale Inhibitor | ORGANICPHOSPHONIC ACIDS SALTS | Trade Secret | 20 | 0.00351093 | 1974 | |
Methyl Alcohol | 67-56-1 | 15 | 0.0026332 | 1480.5 | ||||
Water | 7732-18-5 | 80 | 0.0140437 | 7896 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.000877734 | 493.5 | ||||
Hydrochloric Acid (HCl) | FTSI | Acid | Hydrogen Chloride | 7647-01-0 | 37 | 0.275109 | 154679 | |
Water | 7732-18-5 | 63 | 0.46843 | 263372 | ||||
40/70 White | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 12.2144 | 6,867,480.0 | |
100 Mesh Sand | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 2.71178 | 1,524,680.0 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 86.35 | 53,940,400.0 | |
ICI-3240 | FTSI | Biocide | Water | 7732-18-5 | 55 | 0.0208932 | 11747 | |
Sodium Hydroxide | 1310-73-2 | 23 | 0.00873714 | 4912.4 | ||||
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1, 3, 5-thiadiazine-2-thione. |
533-74-4 | 24 | 0.00911701 | 5125.98 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Dimethylformamide | 68-12-2 | 10 | 0.00019689 | 110.7 | |
Alkylene Oxide Block Polymer | Proprietary | 10 | 0.00019689 | 110.7 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00019689 | 110.7 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00019689 | 110.7 | ||||
Fatty Acid Salt | Proprietary | 0.1 | 0.00000197 | 1.11 | ||||
Isopropanol | 67-63-0 | 30 | 0.000590669 | 332.1 | ||||
Water | 7732-18-5 | 5 | 0.00009844 | 55.35 | ||||
Aliphatic alcohol | Proprietary | 0.1 | 0.00000197 | 1.11 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000590669 | 332.1 | ||||
Diethylene glycol | 111-46-6 | 1 | 0.00001969 | 11.07 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.000590669 | 332.1 | ||||
Fatty Acid | Proprietary | 0.1 | 0.00000197 | 1.11 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-07-20 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | WARREN E & P INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 653,813.93 | 148 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 808,826.71 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 531,486.64 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 424,357.59 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 354,834.44 | 264 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | WARREN E & P INC | Drill Cuttings | 1,116.52 Tons | LANDFILL | THR029 |
2015 | WARREN E & P INC | Produced Fluid | 6,612.85 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | WARREN E & P INC | Produced Fluid | 75.20 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | WARREN E & P INC | Fracing Fluid Waste | 7,841.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 75.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 120.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Synthetic Liner Materials | 0.10 Tons | LANDFILL | THR029 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 13.22 Tons | LANDFILL | THR029 |
2016 | WARREN E & P INC | Produced Fluid | 329.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 36.99 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 1,001.33 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 696.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 2,092.87 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 37.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 614.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 522.04 Bbl | REUSE (AT WELL PAD) | |
2017 | WARREN E & P INC | Produced Fluid | 21.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | BKV OPR LLC | Other Oil & Gas Wastes | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | BKV OPR LLC | Produced Fluid | 21.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | WARREN E & P INC | Produced Fluid | 177.94 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Other Oil & Gas Wastes | 36.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Waste Water Treatment Sludge | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | BKV OPR LLC | Produced Fluid | 9.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | WARREN E & P INC | Produced Fluid | 951.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Soil Contaminated by Oil | 10.85 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 2.46 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Soil Contaminated by Oil & Gas Related Spills | 10.85 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 5.28 Tons | LANDFILL | 101247 |
2019 | BKV OPR LLC | Produced Fluid | 15.00 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 2,420.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2335702 | Primary Facility | 2015-01-14 | Drilling/Alteration | No Violations Noted | |
2344385 | Primary Facility | 2015-02-04 | Routine/Complete Inspection | No Violations Noted | H&P Rig #284 is the active drilling rig on the location. I met with Jacob Oettel, company man, of Warren E&P. Mr. Oettel stated that drilling procedures for the Mirabelli Unit 3H well have been just recently completed. The well has been drilled to total depth, which is around (12,800) feet. The Mirabelli 3H and the Mirabelli Keystone 1H wells have been drilled to a depth of (2,032) feet. The surface and intermediate casing has been cemented on each of these wells. It is not clear as to when Warren will return to the location to drill the wells to total depth. |
2344389 | Primary Facility | 2015-02-04 | Routine/Complete Inspection | No Violations Noted | H&P Rig #284 is the active drilling rig on the location. I met with Jacob Oettel, company man, of Warren E&P. Mr. Oettel stated that drilling procedures for the Mirabelli Unit 3H well have been just recently completed. The well has been drilled to total depth, which is around (12,800) feet. The Mirabelli 3H and the Mirabelli Keystone 1H wells have been drilled to a depth of (2,032) feet. The surface and intermediate casing has been cemented on each of these wells. It is not clear as to when Warren will return to the location to drill the wells to total depth. |
2429738 | Primary Facility | 2015-12-03 | Routine/Complete Inspection | No Violations Noted | Sample collected from Production Fluid Storage Tank Containment Area (3809-123). |
2437023 | Primary Facility | 2015-01-04 | Follow-up Inspection | No Violations Noted | |
2474067 | Primary Facility | 2016-04-08 | Routine/Complete Inspection | No Violations Noted | |
2503008 | Primary Facility | 2016-07-20 | Administrative/File Review | In Compliance with Policy | |
2601470 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Workmen were installing a compressor at the site during the inspection. If there are questions regarding this report please contact me. |
2849724 | Primary Facility | 2019-02-04 | Drilling/Alteration | No Violations Noted | I arrived at the site at 12:15. I was accompanied by Casey Baldwin, DEP O&G WQS out of the Scranton District Office. The weather conditions are partly cloudy skies, light winds, and mild with temperatures in the low to mid 50's. Precision Drilling Rig #532 is on the location. BKV submitted a Drilling Resumption After Break of 30 days or more Notification to the Department on 1/29/19. The notice indicated BKV would resume drillng of the Keystone Unit Mirabelli 1 Keystone 1H well at 6AM on 2/1/19. The surface and intermediate sections of this well, and the Keystone Unit Mirabelli 1-3H were drilled and cemented in 2015.
We met Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator (WPIT) of Whitetail Environmental Services, LLC, Gary Titus, site company man, consultant of BKV, Larry Gerard, Completions Superintendent, and Gary King, Drilling Superintendent, both consultants of BKV. The current drilling depth on the Mirabelli Keystone 1H well is (6,102) feet. BKV provided the following d |
For data sources see[9]