If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 47-033-04550 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.343619,"lon":-80.372924,"icon":""}]} |
| Country: United States | |
| State: West Virginia | |
| County: Harrison | |
| Operator Name: Clowser Well Service | |
| Farm/Lease Name: Vincent J Post Jr et al | |
| License Status: Completed | |
| License Date: | |
| Spud Date: 2005-01-28 | |
| Final Drill Date: 2005-02-04 | |
| Well Total Depth: | |
| Configuration: Vertical | |
| Latitude: 39.343619 | |
| Longitude: -80.372924 |
| Job Completed | Job Completion Date | Comment |
|---|---|---|
| Original Location Drilled | 2005-02-04 |
For data sources see[2]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | NGL Quantity (bbl) | Production Days |
|---|---|---|---|---|---|
| 2005 | Clowser Production Company | 6812.00 | 0 | 0 | 0 |
| 2006 | Tapo Energy, Inc. | 15728.00 | 0 | 0 | 0 |
| 2007 | Tapo Energy, Inc. | 13132.00 | 0 | 0 | 0 |
| 2008 | Tapo Energy, Inc. | 9066.00 | 0 | 0 | 0 |
| 2010 | Tapo Energy, Inc. | 6681.00 | 0 | 0 | 0 |
| 2011 | Tapo Energy, Inc. | 4506.00 | 0 | 0 | 0 |
| 2012 | Tapo Energy, Inc. | 5615.00 | 0 | 0 | 0 |
| 2013 | Tapo Energy, Inc. | 7908.00 | 0 | 0 | 0 |
| 2014 | Tapo Energy, Inc. | 6686.00 | 0 | 0 | 0 |
| 2015 | Tapo Energy, Inc. | 2027.00 | 0 | 0 | 0 |
| 2016 | Clowser Production Company | 5907.00 | 0 | 0 | 0 |
| 2017 | Tapo Energy, Inc. | 4414.00 | 0 | 0 | 0 |
| 2018 | Tapo Energy, Inc. | 4758.00 | 0 | 0 | 0 |
| Period | Operator Name | Waste Type | Quantity | Quantity Units | Production Days |
|---|---|---|---|---|---|
| 2005 | Clowser Production Company | Water | Gallons | ||
| 2006 | Tapo Energy, Inc. | Water | Gallons | ||
| 2007 | Tapo Energy, Inc. | Water | Gallons | ||
| 2008 | Tapo Energy, Inc. | Water | Gallons | ||
| 2010 | Tapo Energy, Inc. | Water | Gallons | ||
| 2011 | Tapo Energy, Inc. | Water | Gallons | ||
| 2012 | Tapo Energy, Inc. | Water | Gallons | ||
| 2013 | Tapo Energy, Inc. | Water | Gallons | ||
| 2014 | Tapo Energy, Inc. | Water | Gallons | ||
| 2015 | Tapo Energy, Inc. | Water | Gallons | ||
| 2016 | Clowser Production Company | Water | 0 | Gallons | |
| 2017 | Tapo Energy, Inc. | Water | Gallons |