If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 47-039-05056 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.408353,"lon":-81.469973,"icon":""}]} |
Country: United States | |
State: West Virginia | |
County: Kanawha | |
Operator Name: 3 R Pipeline, Inc. | |
Farm/Lease Name: W H Campbell Hrs | |
License Status: Completed | |
License Date: | |
Spud Date: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 38.408353 | |
Longitude: -81.469973 |
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | NGL Quantity (bbl) | Production Days |
---|---|---|---|---|---|
1996 | 3 R Pipeline, Inc. | 329.00 | 0 | 0 | 0 |
1997 | 3 R Pipeline, Inc. | 529.00 | 0 | 0 | 0 |
1998 | 3 R Pipeline, Inc. | 1008.00 | 0 | 0 | 0 |
1999 | 3 R Pipeline, Inc. | 1019.00 | 0 | 0 | 0 |
2001 | B & R Construction, Inc. | 1930.00 | 0 | 0 | 0 |
2002 | B & R Construction, Inc. | 1996.00 | 0 | 0 | 0 |
2003 | B & R Construction, Inc. | 1486.00 | 0 | 0 | 0 |
2004 | B & R Construction, Inc. | 843.00 | 0 | 0 | 0 |
2005 | B & R Construction, Inc. | 845.00 | 0 | 0 | 0 |
2006 | B & R Construction, Inc. | 301.00 | 0 | 0 | 0 |
2007 | B & R Construction, Inc. | 246.00 | 0 | 0 | 0 |
2008 | B & R Construction, Inc. | 204.00 | 0 | 0 | 0 |
2009 | B & R Construction, Inc. | 125.00 | 0 | 0 | 0 |
2010 | B & R Construction, Inc. | 104.00 | 0 | 0 | 0 |
2013 | Blue Group Operating, Inc. | 127.00 | 286.00 | 0 | 0 |
2014 | Blue Group Operating, Inc. | 135.00 | 162.00 | 0 | 0 |
2015 | Blue Group Operating, Inc. | 196.00 | 99.00 | 0 | 0 |
2016 | Blue Group Operating, Inc. | 196.00 | 99.00 | 0 | 0 |
2017 | Blue Group Operating, Inc. | 216.00 | 203.00 | 0 | 0 |
2018 | Blue Group Operating, Inc. | 73.00 | 224.00 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity | Quantity Units | Production Days |
---|---|---|---|---|---|
1996 | 3 R Pipeline, Inc. | Water | Gallons | ||
1997 | 3 R Pipeline, Inc. | Water | Gallons | ||
1998 | 3 R Pipeline, Inc. | Water | Gallons | ||
1999 | 3 R Pipeline, Inc. | Water | Gallons | ||
2001 | B & R Construction, Inc. | Water | Gallons | ||
2002 | B & R Construction, Inc. | Water | Gallons | ||
2003 | B & R Construction, Inc. | Water | Gallons | ||
2004 | B & R Construction, Inc. | Water | Gallons | ||
2005 | B & R Construction, Inc. | Water | Gallons | ||
2006 | B & R Construction, Inc. | Water | Gallons | ||
2007 | B & R Construction, Inc. | Water | Gallons | ||
2008 | B & R Construction, Inc. | Water | Gallons | ||
2009 | B & R Construction, Inc. | Water | Gallons | ||
2010 | B & R Construction, Inc. | Water | Gallons | ||
2013 | Blue Group Operating, Inc. | Water | Gallons | ||
2014 | Blue Group Operating, Inc. | Water | Gallons | ||
2015 | Blue Group Operating, Inc. | Water | Gallons | ||
2016 | Blue Group Operating, Inc. | Water | 0 | Gallons | |
2017 | Blue Group Operating, Inc. | Water | Gallons |