If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20772 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91,"lon":-80.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: York Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-000909 | |
Farm/Lease Name: KASETA UNIT | |
License Status: Producing | |
License Date: 2014-04-08 | |
Spud Date: 2014-06-15 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2014-12-28 | |
Well Total Depth: 18057.00 ft | |
Configuration: Horizontal | |
Latitude: 39.910000 | |
Longitude: -80.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-08 | Proposed Formations:POINT PLEASANT, Issued Date:4/8/2014, Expired Date:4/7/2016 12:00:00 PM, Drilling unit acres:704, Proposed Well Type:OG, Proposed Well Class:FWC |
Correction to Well | 2014-12-12 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Reached Total Depth | 2014-12-28 | |
Correction to Well | 2015-02-06 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-03-30 | |
Construction Permit Expires | 2016-04-07 | |
Record Last Modified | 2018-07-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-31 | 10663 | 17553 | 0 |
10663 | 17553 | 0 | |
10663 | 17553 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/14/2015 | 11/04/2015 | 10446 | 15,645,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.00999813 | 14568.8 |
Ethylene Glycol | 107-21-1 | 30 | 0.00428491 | 6243.79 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0730072 | 106383 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0303049 | 44159 | ||||
Other - (non-hazardous) | NA | 85 | 0.78058 | 1,137,430.0 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0344374 | 50180.6 | ||||
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Other - (non-hazardous) | NA | 85 | 0.0253402 | 36924.6 | |
Water | 7732-18-5 | 15 | 0.0044718 | 6516.11 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.35054 | 13,625,200.0 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Short chained glycol ether | 112-34-5 | 60 | 0.000474866 | 691.955 | |
Methanol | 67-56-1 | 5 | 0.00003957 | 57.663 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00211609 | 3083.48 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000791 | 11.533 | ||||
Thiourea | 62-56-6 | 1 | 0.00000791 | 11.533 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000791 | 11.533 | ||||
Other - (non-hazardous) | NA | 30 | 0.00317414 | 4625.22 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00529023 | 7708.69 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000277005 | 403.64 | ||||
AP Breaker | Clearwater International | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00601171 | 8760 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.5986 | 130,559,000.0 | |
Unigel 5F | Universal | Viscosifier | Guar Gum | NA | 95 | 0.00571112 | 8322 | |
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0212825 | 31011.9 | |
Other - (non-hazardous) | NA | 70 | 0.0496592 | 72361.2 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-11-04 | H2O | 15 | 13802 Bbl | 552600 | Universal Well Services Inc. | STAGE 25/25
60 SHOTS |
2015-10-22 | H2O | 15 | 21067 Bbl | 54990 | Universal Well Services Inc. | STAGE 1/25
60 SHOTS STAGES 2-24 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 2726277 | 0 | 319 |
2017 | XTO ENERGY INC. | 1058674 | 0 | 324 |
2018 | XTO ENERGY INC. | 229148 | 0 | 121 |
2019 | XTO ENERGY INC. | 130017 | 0 | 81 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 48326 | 319 |
2017 | XTO ENERGY INC. | Brine | 14963 | 324 |
2018 | XTO ENERGY INC. | Brine | 4299 | 121 |
2019 | XTO ENERGY INC. | Brine | 2064 | 81 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-56101407 | 2014-6-23 0:00: | CS | No Violations | 8.00 |
0056101407 | 2014-06-23 | Casing String Witnessed | No Violations | On this day the 24 casing was ran and cemented in a 28 open hole to a depth of 400. See cement ticket for details. No violations noted. |
0553408864 | 2014-06-15 | Casing String Witnessed | No Violations | On this day the 30 casing was ran and cemented in a 36 open hole to a depth of 100. See cement ticket for details. No violations noted. |
0598630030 | 2014-06-27 | Casing String Witnessed | No Violations | On this day the 18.625 casing was ran and cemented in a 22 open hole to a depth of 636. See cement ticket for details. No violations noted. |
1502945708 | 2015-10-22 | Preliminary Restoration | No Violations | On this day there was still excavation equipment on the location. This site had a slip issue that the engineering department was working with them on. I will contact Anthony Carson to check the completion status before passing this restoration. |
553408864 | 2014-6-15 0:00: | CS | No Violations | 4.00 |
598630030 | 2014-6-27 0:00: | CS | No Violations | 8.00 |
835413044 | 2020-5-7 0:00:0 | PW | No Violations | 0.20 |
For data sources see[10]